Attachment_C_-_SOW_02Nov2018.pdf

PDF 89 KB Posted

Attached to
Replace Halon & Electrical at GWEF Federal contract opportunity
Solicitation number
FA2823-19-R-A005
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment C: Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replace Halon & Electrical at GWEF, newest first.
File Type Posted
GWEF_BLDG_374_CEILING_HEIGHTS.PDF PDF
Q_and_A_03_May.pdf PDF
Q_and_A_02_May.pdf PDF
Q_and_A_26_Apr.pdf PDF
Amendment_FA282319RA0050002.pdf PDF
Conformed_FA282319RA0050002.pdf PDF
Q_and_A__2_25_Apr.pdf PDF
Attachment_QA_1_pictures.pdf PDF
Attachment_QA_1_Carcom_filter.pdf PDF
Conformed_FA282319RA0050001.pdf PDF
FA282319RA0050001_SF_30.pdf PDF
Q_and_A_1_19_Apr.pdf PDF
Attachment_A_-_Specs_02Nov2018.pdf PDF
FA282319RA005_GWEF_FINAL.pdf PDF
Attachment_B_-_Drawings_02Nov2018.pdf PDF
50_Div_Cost.xls XLS spreadsheet
Wage_Determination_FL190217.pdf PDF
Attachment_F_-_Base_Access_Memo.docx DOCX document
Attachment_D_-_PPQ.pdf PDF
Attachment_E_-_FRQ.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR CONSTRUCTION

FTFA 18-1013

Replace Halon/Upgrade Electrical, GWEF Bldg 374

02 Nov 2018

1. STATEMENT OF WORK: The Contractor shall perform all construction services for the subject project, according with the associated drawings and specifications, located at Eglin Air Force Base, Florida. It is declared and acknowledged intention and meaning of this work includes:

A. Removing the existing Halon Fire suppression system and replacing with the approved

FM-200 clean agent suppression in areas outlined in the attached drawings and specifications for project FTFA 18-1013. All work shall be accomplished in accordance with the latest UFC

3-600-01 Fire Protection.

B. Upgrading the electrical service to both main test chambers in building 374 per the drawings and specifications. The new 2000 KVA transformer shall be provided and installed by Chelco. Special Clarification Note: This upgrade requires very large electrical equipment with maximum allowable dimensions pertaining to the width, depth, and height shown on sheet

E-100, Note 1, 8, 9, 10, 11. This equipment is expected to have a long lead time. The contractor shall make special efforts to expedite the submittal process as will the government review. The contractor shall overlap as much work as they can as we wait on the arrival of the electrical equipment.

C. Provide architectural modifications at room 308 and 109 suite to support the associated user mission per the drawings and specifications.

2. LOCATION: The work is located at Building 374 Eglin Air Force Base, FL as indicated on the drawings. The exact location of the facility will be indicated by the Contracting Officer.

3. SITE INSPECTION: Prospective bidders are expected to visit the areas of work and verify all conditions of dimensions.

4. SUBMITTALS: To be discussed at the preconstruction meeting include, but may not be limited to: Project Schedule, Shop Drawings, Material Submittals, Work permits, Utility Outage Requests, Utility Connection Requests, Welding Permits, and Burning Permits.

-The contractor is responsible for marking and verifying all utilities not marked.

5. CONFLICTS: In case of conflict between different Air Force standards or other any information herein this document, the more stringent requirement criteria and/or work-effort shall apply and take precedence.

6. COMPLETION DATE: 194 Calendar days from Notice to Proceed (NTP).