Attach_B_-_Specifications_Rev_26_Apr_17.pdf
PDF 6 MB Posted
- Attached to
- IRCM 4th Lane Facility Modifications Bldg 374 Federal contract opportunity
- Solicitation number
- FA282317R4027
About this file
Attachment B - Specifications dated 26 January 2017 - Revision # 2 dated 26 April 2017
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
prepared for:
96 CEG/CEN, Eglin AFB, Florida
Final Design Submittal prepared by: Jan 26, 2017 Bullock Tice Associates - Pensacola, Florida
IRCM 4th Lane Facility Modification Building 374 (GWEF), Eglin AFB, Florida
Contract No. FTFA 16-1126
BTA No. 141614.03
Specifications
1081503210C Typewritten Text Rev 2 - 26 Apr 2017
IRCM Simulator Modification Bldg 374 (GWEF) Final Design Submittal Eglin AFB, Florida FTFA 16-1126
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 54 00 AFFIRMATIVE PROCUREMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 20.01 SUPPLEMENTAL ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
PROJECT TABLE OF CONTENTS Page 1
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
This page left blank.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 21 PAGES
ICRM Simulator Modification Bldg 374
01 11 00 SD-01 Preconstruction Submittals
1.2.2 GConstruction Schedule
1.11 GConstruction Schedule
1.2.2 GSafety Plan
1.10Utility Connection Requests 1.10Utility Outage Requests
SD-03 Product Data
1.6 GJib Crane
SD-05 Design Data
1.2.2 GFoundation
SD-08 Manufacturer’s Instructions
1.2.2 GFoundation Requirements
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GList of Contact Personnel
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.4.3 GPeriodic Schedule Update
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 21 PAGES
01 35 26 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 3.6.2Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet 01 54 00 SD-03 Product Data
2.1Product Sources and Information SD-07 Certificates
2.1Product Sources and Information 01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
01 57 20.01 SD-01 Preconstruction Submittals
1.5.4 GHazardous materials
SD-07 Certificates
1.7.1 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 21 PAGES
01 57 20.01 1.7.2 GManagement Plan
1.7.4 GDisposal permit for hazardous
wastes
1.7.5 GHazardous waste certification
01 78 00 SD-03 Product Data
1.3.2 GAs-Built Record of Equipment
and Materials
1.6.4 GWarranty Tags
1.8 GFinal Cleaning
1.4 GSpare Parts Data
SD-08 Manufacturer’s Instructions
1.5 GPreventative Maintenance
1.5 GInspection
SD-10 Operation and Maintenance Data
1.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GRecord Drawings
1.9 GInterim Form DD1354
1.9 GChecklist for Form DD1354
02 41 00 SD-01 Preconstruction Submittals GDemolition Plan GDeconstruction Plan
Existing Conditions SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 21 PAGES
02 41 00 1.7 GNotification SD-11 Closeout Submittals
3.2.4Receipts 03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
1.4 GUnisorb Installation
Technologies, Foundation Drawings
SD-03 Product Data 2.2.3.1Air-Entraining Admixture 2.2.3.2Accelerating Admixture 2.2.3.3Water-Reducing or Retarding
Admixture 2.2.10Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded
Sealants 2.4.1Waterstops 2.4.2Chemical Floor Hardener 3.2Conveying and Placing Concrete 2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete 2.4.3Curing Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 21 PAGES
03 30 53 2.2.5Mechanical Reinforcing Bar Connectors
2.5 GUnisorb Installation
Technologies, Isolation System(s)
SD-06 Test Reports 2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor
Tolerances
3.10.3 GCompressive Strength Testing
3.10.3 GSlump
3.10.3Air Content 2.2.4Water
SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 1.4.1CPG for recycled materials or appropriate Waiver Form 2.2.2Aggregates 2.3Delivery Tickets
SD-08 Manufacturer’s Instructions 2.4.2Chemical Floor Hardener 2.4.3Curing Compound 2.5Unisorb Installation Technologies
04 20 00 SD-02 Shop Drawings Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 21 PAGES
04 20 00 SD-03 Product Data 2.3.1Cement
SD-05 Design Data 2.3.2Pre-mixed Mortar 1.2.1.1Unit Strength Method
SD-06 Test Reports 3.15.1Field Testing of Mortar 3.15.2Field Testing of Grout 2.3.1Masonry Cement
Masonry Inspector Qualifications SD-07 Certificates
2.1Concrete Masonry Units (CMU) 2.5Anchors, Ties, and Bar
Positioners 2.3.1Masonry Cement
SD-08 Manufacturer’s Instructions 2.3.1Masonry Cement
07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.1.2Sound Batt Insulation 2.3Pressure Sensitive Tape 2.4Accessories
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 21 PAGES
07 84 00 SD-06 Test Reports 3.3Inspection
SD-07 Certificates 1.4.2Inspector Qualifications 2.1Firestopping Materials 1.4.1Installer Qualifications
07 92 00 SD-03 Product Data 2.1Sealants
Primers 2.2Bond breakers 2.3Backstops
SD-07 Certificates 3.3.6Sealant
08 34 73 SD-02 Shop Drawings 2.1Hollow Metal Sound Retardant
Doors 2.1Door Frames
SD-03 Product Data 2.1Hollow Metal Sound Retardant
Doors 2.1Door Frames 2.1Door Hardware
Intumescent Seals and Gasketing 2.1Thresholds 2.1Astragals
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 21 PAGES
08 34 73 1.3.2Acoustical Tests SD-07 Certificates
2.1Hollow Metal Sound Retardant Doors
2.1Door Frames 2.1Door Hardware
Intumescent Seals, Gasketing and Door Bottoms
2.1Thresholds 2.1Astragals
08 71 00 SD-02 Shop Drawings 1.3Manufacturer's Detail Drawings 1.3Verification of Existing Conditions 1.5Hardware Schedule 2.3.5Keying System
SD-03 Product Data 2.3Hardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5Hardware Schedule SD-11 Closeout Submittals
1.6.1Key Bitting 09 22 00 SD-02 Shop Drawings
2.1Metal support systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 21 PAGES
09 29 00 SD-03 Product Data Accessories Certifications
2.1.1Gypsum Board SD-07 Certificates
2.1Asbestos Free Materials Indoor Air Quality
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer Maintenance Instructions
09 51 00 SD-02 Shop Drawings
1.2 GApproved Detail Drawings
SD-03 Product Data GAcoustical Ceiling Systems
1.4 GCertification
SD-04 Samples
2.1 GAcoustical Units
2.1.1 GAcoustic Ceiling Tiles
SD-06 Test Reports GFire Resistive Ceilings
1.2.1 GCeiling Attenuation Class and
Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 21 PAGES
09 51 00 2.1 GAcoustical Units
2.1.1 GAcoustic Ceiling Tiles
09 69 13 SD-02 Shop Drawings
2.2.2 GDetailed Installation Drawings
SD-03 Product Data
2.1 GAccess Flooring System
SD-04 Samples
2.2 GFloor Panels
2.2.4 GFloor Covering
2.3 GPanel Support System
GAccessories GFascia
2.5 GCut Outs
SD-05 Design Data
2.1.7 GSeismic Calculations
SD-06 Test Reports
2.4 GFactory Tests
2.1.1 GConcentrated Load
2.1.1 GUniform Live Load
2.1.1 GRolling Load
2.1.1 GRolling Load
2.1.1 GImpact Load
2.1.1 GUltimate Load
2.1.3 GStringer Load
2.1.4 GPedestal Axial Load
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 21 PAGES
09 69 13 2.1.5 GBonding Strength of Pedestal Adhesive
3.2.3 GElectrical Resistance
3.2 GField Tests
SD-07 Certificates
2.1 GCompliance with ICC-ES AC300
2.1 GCompliance with ICC IBC
2.1 GCertificate of Compliance
1.4.1 GQualification of Manufacturer
SD-10 Operation and Maintenance Data
3.5 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals Recycled Content of Access Flooring System
Recycled Content of Floor Covering and Resilient Base
SReduced VOC's for Pedestal Adhesive
Reduced VOC's for Floor Covering (Excluding Carpet Tile)
Reduced VOC's for Carpet Tile Reduced VOC's for Lightweight Concrete Filled (Exposed Concrete)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 21 PAGES
09 69 13 Reduced VOC's for Floor Covering and Resilient Base Adhesives
2.2.7Lifting Device
1.6 GWarranty
09 90 00 SD-03 Product Data Certification Environmental Data
2.1Coating 2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples 1.8Color
SD-07 Certificates Applicator's qualifications Qualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.6.2Mixing Manufacturer's Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Coatings:
21 13 13.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 21 PAGES
21 13 13.00 10 1.4.3 GShop Drawings 3.8As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.7 GPreliminary Tests
3.8 GFinal Acceptance Test
3.9 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.8 GPreliminary Test Report
3.8 GFinal Acceptance Test Report
SD-10 Operation and Maintenance Data
3.9Operating and Maintenance Instructions
22 00 00 SD-07 Certificates 1.3Materials and Equipment
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 21 PAGES
23 00 00 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.2Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.8.1Diffusers 2.9.8.3Registers and Grilles 2.9.9Louvers 2.10.1.1Centrifugal Fans 2.10.1.2In-Line Exhaust Fans
2.11.1 GAir Handling Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.11 GPerformance Tests
3.9 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.13.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.13.1 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 21 PAGES
23 00 00 2.10.1.1 GCentrifugal Fans
2.10.1.2 GIn-Line Exhaust Fans
2.11.1 GAir Handling Units
23 05 93 SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SD-06 Test Reports
3.7 GDALT and TAB Work Execution
Schedule
3.7 GDALT and TAB Procedures
Summary 1.6.2.1Design review report
1.6.2 GFinal DALT report
3.3.3 GFinal DALT report
1.5.5.2 GTAB report
3.7 GTAB report
SD-07 Certificates
1.5.1 GIndependent TAB agency and
personnel qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 21 PAGES
23 05 93 1.5.1 GIndependent TAB agency and personnel qualifications
3.7Completed Pre-Final DALT Work Checklist
3.7Completed Pre-TAB Work Checklist
1.5.3.1 GTAB Firm
1.6.1 GDALT and TAB Submittal and
Work Schedule
1.6.2 GDALT and TAB Submittal and
Work Schedule 1.6.2Advanced notice for TAB field work 23 07 00 SD-02 Shop Drawings
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 21 PAGES
23 07 00 3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 23.13 20 SD-02 Shop Drawings
1.4.1.1 GControl System Drawings Title
Sheet
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl System Schematics
1.4.1.5 GHVAC Equipment Electrical
Ladder Diagrams
1.4.1.6 GComponent Wiring Diagrams
1.4.1.7 GTerminal Strip Diagrams
1.4.1.8 GBACnet Communication
Architecture Schematic SD-03 Product Data
2.1.1 GDirect Digital Controllers
2.1.1.12 GBACnet Gateways
2.2 GSensors and Input Hardware
2.3 GOutput Hardware
2.4.2 GSurge and Transient Protection
2.6 GIndicators
2.5.1 GDuct smoke detectors
2.7 GVariable Frequency (Motor)
Drives SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 21 PAGES
23 09 23.13 20 3.4.7 GPerformance Verification Testing Report
SD-07 Certificates
1.6.6 GContractor's Qualifications
SD-10 Operation and Maintenance Data
1.4 GBACnet Direct Digital Control
Systems
3.3 GControls System Operators
Manuals
2.7.2 GVFD Service Manuals
23 64 26 SD-02 Shop Drawings
1.7.4 GPipe Route
SD-03 Product Data
2.2.2.4 GGrooved Mechanical
Connections For Steel
2.5.4 GCalibrated Balancing Valves
2.5 GValves
SD-06 Test Reports
3.4.2 GPressure Tests Reports
SD-10 Operation and Maintenance Data
2.5.4 GCalibrated Balancing Valves
23 83 00.00 20 SD-02 Shop Drawings
3.1Heater installation drawing SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 21 PAGES
23 83 00.00 20 2.1Electric unit heaters 2.1.5Unit thermostat
26 20 00 SD-02 Shop Drawings
2.10 GPanelboards
3.1.7.1 GMarking strips
SD-03 Product Data
2.9 GReceptacles
2.10.3 GCircuit breakers
2.8 GSwitches
2.16 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.3 GGrounding system test
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3 GDrivers, Ballasts and Generators
1.6.1 GLED Luminaire Warranty
1.5.3 GLuminaire Design Data
2.5.2 GDimming Controllers (Dimmers)
2.8 GPower Hook Luminaire Hangers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 21 PAGES
26 51 00 2.6.1 GExit Signs
2.6.2 GLED Emergency Drivers
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
1.5.5 GLED Light Source - IES LM-80
Test Report
1.5.6 GLED Light Source - IES TM-21
Test Report
1.5.9.3 GEnergy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
1.5.2 GLED Driver and Dimming Switch
Compatibility Certificate 28 31 63.00 20 SD-02 Shop Drawings
1.4.1Battery power calculations SD-03 Product Data
2.2.5.1 GBatteries
2.2.3 GSmoke sensors
2.2.4 GThermal sensors
2.2.6.2 GWiring
2.3 GWiring
2.2.8 GNotification appliances
2.2.2 GAddressable interface devices
2.2.3.3 GSmoke sensor testing procedures
2.2.7 GManual Pull Stations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 21 PAGES
28 31 63.00 20 SD-07 Certificates 1.4.2Qualifications of installer
SD-10 Operation and Maintenance Data
2.2 GINTERIOR FIRE ALARM
SYSTEM
31 23 00.00 20 SD-01 Preconstruction Submittals
1.6.1 GShoring And Sheeting Plan
SD-06 Test Reports
3.6.2.1 GFill And Backfill
3.6.2.2 GSelect Fill
3.6.2.3 GDensity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
08/10
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
38800 Country Club Drive Farmington Hills, MI 48331 Ph: 248-848-3700 Fax: 248-848-3701 E-mail: bkstore@concrete.org Internet: http://www.concrete.org
ACOUSTICAL SOCIETY OF AMERICA (ASA)
2 Huntington Quadrangle, Suite 1NO1 Melville, NY 11747-4502 Ph: 516-576-2360 Fax: 516-576-2377 E-mail: asa@aip.org Internet: http://asa.aip.org
AIR CONDITIONING CONTRACTORS OF AMERICA (ACCA)
2800 Shirlington Road, Suite 300 Arlington, VA 22206 Ph: 703-575-4477 Fax: 703-575-4449 E-mail: info@acca.org Internet: http://www.acca.org
AIR DIFFUSION COUNCIL (ADC)
1901 N. Roselle Road, suite 800 Schaumburg, IL 60195 Ph: 847-706-6750 Fax: 847-706-6751
SECTION 01 42 00 Page 1
E-mail: info@flexibleduct.org Internet: http://www.flexibleduct.org
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL (AMCA)
30 West University Drive Arlington Heights, IL 60004-1893 Ph: 847-394-0150 Fax: 847-253-0088 E-mail: amca@amca.org Internet: http://www.amca.org
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
2111 Wilson Blvd, Suite 500 Arlington, VA 22201 Ph: 703-524-8800 Fax: 703-528-3816 E-mail: fdietz@ahrinet.org Internet: http://www.ahrinet.org
ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS (ATIS)
1200 G Street, NW, Suite 500 Washington, D.C. 20005 Ph: 202-628-6380 Fax: 202-393-5453 E-mail: doccenter@atis.org Internet: http://www.atis.org
ALUMINUM ASSOCIATION (AA)
National Headquarters 1525 Wilson Boulevard, Suite 600 Arlington, VA 22209 Ph: 703-358-2960 Fax: 703-358-2961 Internet: http://www.aluminum.org
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
1827 Walden Office Square Suite 550 Schaumburg, IL 60173-5774 Ph: 847-303-5664 Fax: 847-303-5774 E-mail: webmaster@aamanet.org Internet: http://www.aamanet.org
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
444 North Capital Street, NW, Suite 249 Washington, DC 20001 Ph: 202-624-5800 Fax: 202-624-5806 E-Mail: info@aashto.org Internet: http://www.aashto.org
AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC)
1 Davis Drive P.O. Box 12215 Research Triangle Park, NC 27709 Ph: 919-549-8141 Fax: 919-549-8933
SECTION 01 42 00 Page 2
E-mail: leonardc@aatcc.org Internet: http://www.aatcc.org
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
2025 M Street, NW, Suite 800 Washington, DC 20036 Ph: 202-367-1155 Fax: 202-367-2155 E-mail: info@americanbearings.org Internet: http://www.abma-dc.org
AMERICAN BOILER MANUFACTURERS ASSOCIATION (ABMA/BOIL)
221 Old Courthouse Road Suite 202 Vienna, VA 22182 Ph: 703-356-7171 Fax: 703-356-4543 Internet: http://www.abma.com
AMERICAN BUREAU OF SHIPPING (ABS)
16855 Northcase Drive Houston, TX 77060 USA Ph: 1-282-877-5800 Internet: http://www.eagle.org
AMERICAN CONCRETE PIPE ASSOCIATION (ACPA)
1303 W. Walnut Hill Lane, Suite 305 Irving, TX 75038-3008 Ph: 972-506-7216 Fax: 972-506-7682 E-mail: info@concrete-pipe.org Internet: http://www.concrete-pipe.org
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
1330 Kemper Meadow Drive Cincinnati, OH 45240 Ph: 513-742-2020 or 513-742-6163 Fax: 513-742-3355 E-mail: mail@acgih.org Internet: http://www.acgih.org
AMERICAN FOREST & PAPER ASSOCIATION (AF&PA)
American Wood Council ATTN: Publications Department 1111 Nineteenth Street NW, Suite 800 Washington, DC 20036 Ph: 800-890-7732 or 202-463-2766 Fax: 202-463-2791 E-mail: awcpubs@afandpa.org Internet: http://www.awc.org/
AMERICAN GAS ASSOCIATION (AGA)
400 North Capitol Street N.W.
Suite 450 Washington, D.C. 20001 Ph: 202-824-7000 Fax: 202-824-7115 E-mail: website@aga.org Internet: http://www.aga.org
SECTION 01 42 00 Page 3
AMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)
1001 N. Fairfax Street, Suite 500 Alexandria, VA 22314-1581 Ph: 703-684-0211 Fax: 703-684-0242 E-mail: websiter@agma.org Internet: http://www.agma.org
AMERICAN HARDBOARD ASSOCIATION (AHA)
1210 West Northwest Highway Palatine, IL 60067 Ph: 847-934-8800 Fax: 847-934-8803 E-mail: aha@hardboard.org Internet: http://domensino/AHA/
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)
3141 Fairview Park Dr, Suite 777 Falls Church, VA 22042 Tel: 703-849-8888 Fax: 703-207-3561 E-mail: infonet@aiha.org Internet http://www.aiha.org
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
One East Wacker Drive, Suite 700 Chicago, IL 60601-1802 Ph: 312-670-2400 Fax: 312-670-5403 Publications: 800-644-2400 E-mail: pubs@aisc.org Internet: http://www.aisc.org
AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC)
7012 South Revere Parkway, Suite 140 Centennial, CO 80112 Ph: 303-792-9559 Fax: 303-792-0669 E-mail: info@aitc-glulam.org Internet: http://www.aitc-glulam.org
AMERICAN IRON AND STEEL INSTITUTE (AISI)
1140 Connecticut Avenue, NW, Suite 705 Washington, DC 20036 Ph: 202-452-7100 Fax: 202-463-6577 E-mail: webmaster@steel.org Internet: http://www.steel.org
AMERICAN LADDER INSTITUTE (ALI/LADDER)
330 North Wabash Avenue, Suite 2000 Chicago, IL 60611 Tel: 202-367-1217 E-mail: info@americanladderinstitute.org Internet: http://www.americanladderinstitute.org
AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)
P.O. Box 210 Germantown, MD 20875-0210
SECTION 01 42 00 Page 4
Ph: 301-972-1700 Fax: 301-540-8004 E-mail: alsc@alsc.org Internet: http://www.alsc.org
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
1819 L Street, NW,11th Floor Washington, DC 20036 Ph: 202-293-8020 Fax: 202-293-9287 E-mail: info@ansi.org Internet: http://www.ansi.org/
AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA)
1200 G Street NW, Suite 800 Washington, DC 20005 Ph: 202-789-2900 Fax: 202-789-1893 E-mail: aflynn@anla.org Internet: http://www.anla.org
AMERICAN PETROLEUM INSTITUTE (API)
1220 L Street, NW Washington, DC 20005-4070 Ph: 202-682-8000 E-mail: greg.kallio@ihs.com Internet: http://www.api.org
AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION
(AREMA)
4501 Forbes Blvd., Suite 130 Lanham, MD 20706 Ph: 301-459-3200 Fax: 301-459-8077 Internet: http://www.arema.org
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
1711 Arlingate Lane P.O. Box 28518 Columbus, OH 43228-0518 Ph: 800-222-2768; 614-274-6003 Fax: 614-274-6899 E-mail: webmaster@asnt.org Internet: http://www.asnt.org
AMERICAN SOCIETY FOR QUALITY (ASQ)
600 North Plankinton Avenue Milwaukee, WI 53203 -or- P.O. Box 3005 Milwaukee, WI 53201-3005 Ph: 800-935-2231; 414-272-8575 Fax: 414-272-1734 E-mail: help@asq.org Internet: http://www.asq.org
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
1801 Alexander Bell Drive Reston, VA 20191-4400
SECTION 01 42 00 Page 5
Ph: 703-295-6300 - 800-548-2723 Fax: 703-295-6333 E-mail: member@asce.org Internet: http://www.asce.org
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
1791 Tullie Circle, NE Atlanta, GA 30329 Ph: 800-527-4723 or 404-636-8400 Fax: 404-321-5478 E-mail: ashrae@ashrae.org Internet: http://www.ashrae.org
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
1800 East Oakton Street Des Plaines, IL 60018-2187 Ph: 847-699-2929 Fax: 847-768-3434 E-mail: customerservice@asse.org Internet: http://www.asse.org
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
18927 Hickory Creek Drive, Suite 220 Mokena, IL 60448 Ph: 708-995-3019 Fax: 708-479-6139 E-mail: info@asse-plumbing.org Internet: http://www.asse-plumbing.org
AMERICAN WATER WORKS ASSOCIATION (AWWA)
6666 West Quincy Avenue Denver, CO 80235 Ph: 800-926-7337 Fax: 303-347-0804 E-mail: smorrison@awwa.org Internet: http://www.awwa.org
AMERICAN WELDING SOCIETY (AWS)
8669 NW 36 Street, #130550 N.W. LeJeune Road Miami, FL 33166-6672 Ph: 800-443-9353 - 305-443-9353 Fax: 305-443-7559 E-mail: info@aws.org or customerservice@awspubs.com Internet: http://www.aws.org
AMERICAN WOOD COUNCIL (AWC)
222 Catoctin Circle SE Suite 201 Leesburg, VA 20175 Ph: 800-890-7732 Fax: 608-232-9354 E-mail: publications@awc.org Internet: http://www.awc.org
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
P.O. Box 361784 Birmingham, AL 35236-1784 Ph: 205-733-4077 Fax: 205-733-4075
SECTION 01 42 00 Page 6
E-mail: email@awpa.com Internet: http://www.awpa.com
APA - THE ENGINEERED WOOD ASSOCIATION (APA)
7011 South 19th St.
Tacoma, WA 98466-5333 Ph: 253-565-6600 Fax: 253-565-7265 E-mail: help@apawood.org Internet: http://www.apawood.org
ARCHITECTURAL WOODWORK INSTITUTE (AWI)
46179 Westlake Drive, Suite 120 Potomac Falls, VA 20165 Ph: 571-323-3636 Fax: 571-323-3630 E-mail: info@awinet.org Internet: http://www.awinet.org
ARCNET TRADE ASSOCIATION (ATA)
E-M-mail: info@arcnet.com Internet: http://www.arcnet.com/index.htm</URL
ASM INTERNATIONAL (ASM)
9639 Kinsman Road Materials Park, OH 44073-0002 Ph: 440-338-5151 Fax: 440-338-4634 E-mail: memberservicecenter@asminternational.org Internet:
http://asmcommunity.asminternational.org/portal/site/www/Home/
ASME INTERNATIONAL (ASME)
Three Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-854-7179 or 800-843-2763 Fax: 212-591-7674 E-mail: infocentral@asme.org Internet: http://www.asme.org
ASPHALT INSTITUTE (AI)
2696 Research Park Drive Lexington, KY 40511-8480 Ph: 859-288-4960 Fax: 859-288-4999 E-mail: info@asphaltinstitute.org Internet: http://www.asphaltinstitute.org
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
529 14th Street, NW Washington D.C. 20045 Ph: 202-591-2450 Fax: 202-591-2445 Internet: http://www.asphaltroofing.org
ASSOCIATED AIR BALANCE COUNCIL (AABC)
1518 K Street, NW Washington, DC 20005 Ph: 202-737-0202
SECTION 01 42 00 Page 7
Fax: 202-638-4833 E-mail: info@aabc.com Internet: http://www.aabchq.com
ASSOCIATION FOR THE ADVANCEMENT OF MEDICAL INSTRUMENTATION (AAMI)
4301 N. Fairfax Drive, Suite 301 Arlington, VA 22203-1633 Ph: 800-332-2264 or 703-525-4890 Fax: 703-276-0793 E-mail: customerservice@aami.org Internet: http://www.aami.org
ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)
186 Thorn Hill Road Warrendale, PA 15086-7528 Ph: 724-814-3000 Fax: 724-814-3001 E-Mail: info@aist.org Internet: http://www.aistech.org
ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)
600 North 18th Street P.O. Box 2641 Birmingham, AL 35291 Ph: 205-257-2530 Fax: 205-257-2540 E-Mail: aeicdir@bellsouth.net Internet: http://www.aeic.org
ASSOCIATION OF HOME APPLIANCE MANUFACTURERS (AHAM)
1111 19th Street NW, Suite 402 Washington, DC 20036 Ph: 202-872-5955 Fax: 202-872-9354 E-mail: info@aham.org Internet: http://www.aham.org
ASSOCIATION OF THE WALL AND CEILING INDUSTRIES - INTERNATIONAL
(AWCI)
513 West Broad Street, Suite 210 Falls Church, VA 22046 Ph: 703-538-1600 Fax: 703-534-8307 E-mail: info@awci.org Internet: http://www.awci.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9585 Fax: 610-832-9555 E-mail: service@astm.org Internet: http://www.astm.org
BAY AREA AIR QUALITY MANAGEMENT DISTRICT (Bay Area AQMD) 939 Ellis Street San Francisco, CA 94109 Ph: 415-771-6000 Fax: 415-928-8560
SECTION 01 42 00 Page 8
E-Mail: publicrecords@baaqmd.gov Internet: http://www.baaqmd.gov/
BIFMA INTERNATIONAL (BIFMA)
678 Front Ave. NW, Suite 150 Grand Rapids, MI 49504-5368 Ph: 616-285-3963 Fax: 616-285-3765 E-mail: email@bifma.org Internet: http://www.bifma.org
BIOCYCLE, JOURNAL OF COMPOSTING AND RECYCLING (BIOCYCLE)
The JG Press Inc.
419 State Avenue Emmaus, PA 18049 Ph: 610-967-4135, Ext. 22 E-mail: biocycle@jgpress.com Internet: http://www.biocycle.net
BRITISH STANDARDS INSTITUTE (BSI)
389 Chiswick High Road London W4 4AL United Kingdom Ph: +44 (0)20 8996 9001 Fax: +44 (0)20 8996 7001 E-mail: cservices@bsi-global.com or info@bsigroup.com Internet: http://www.bsi-group.com
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
355 Lexington Avenue 15th Floor New York, NY 10017 Ph: 212-297-2122 Fax: 212-370-9047 E-mail: assocmgmt@aol.com Internet: http://www.buildershardware.com
CALIFORNIA ENERGY COMMISSION (CEC)
Media and Public Communications Office 1516 Ninth Street, MS-29 Sacramento, CA 95814-5512 Ph: 916-654-4287 Internet: http://www.energy.ca.gov/
CARPET AND RUG INSTITUTE (CRI)
P.O. Box 2048 Dalton, GA 30722-2048 Ph: 800-882-8846 or 706-278-3176 Fax: 706-278-8835 Internet: http://www.carpet-rug.com
CAST IRON SOIL PIPE INSTITUTE (CISPI)
3008 Preston Station Drive Hixson, TN 37343 Ph: 423-842-2122 Internet: http://www.cispi.org
CEILINGS & INTERIOR SYSTEMS CONSTRUCTION ASSOCIATION (CISCA)
405 Illinois Ave. Unit 2B
SECTION 01 42 00 Page 9
St. Charles, IL 60174 Ph: 630-584-1919 Fax: 866-560-8537 E-mail: cisca@cisca.org Internet: http://www.cisca.org
CENTERS FOR DISEASE CONTROL AND PREVENTION (CDC)
1600 Clifton Road Atlanta, GA 30333 Ph: 404-639-3311 or 800-232-4636 E-mail: cdcinfo@cdc.gov Internet: http://www.cdc.gov
CHEMICAL FABRICS & FILM ASSOCIATION (CFFA)
1300 Sumner Avenue Cleveland OH 44115-2851 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: cffa@chemicalfabricsandfilm.com Internet: http://www.chemicalfabricsandfilm.com/
CHLORINE INSTITUTE (CI)
1300 Wilson Boulevard Arlington, VA 22209 Ph: 703-741-5760 Fax: 703-741-6068 E-mail: aonna@CL2.com Internet: http://www.CL2.com
COMPOSITE PANEL ASSOCIATION (CPA)
19465 Deerfield Avenue, Suite 306 Leesburg, VA 20176 Ph: 703-724-1128 Fax: 703-724-1588 Internet: http://www.pbmdf.com
COMPRESSED AIR AND GAS INSTITUTE (CAGI)
1300 Sumner Avenue Cleveland OH 44115-2851 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: cagi@cagi.org Internet: http://www.cagi.org/
COMPRESSED GAS ASSOCIATION (CGA)
1451 George Carter Way, Suite 103 Chantilly, VA 20151 Ph: 703-788-2700 Fax: 703-961-1831 E-mail: cga@cganet.com Internet: http://www.cganet.com
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
933 North Plum Grove Road Schaumburg, IL 60173-4758 Ph: 847-517-1200 or 800-328-6306 Fax: 847-517-1206 Internet: http://www.crsi.org/
SECTION 01 42 00 Page 10
CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA)
11001 Danka Way North, Suite 1 St Petersburg, FL 33716
PH: 727-577-5004
Fax: 727-577-5012 E-mail: info@csda.org Internet: http://www.csda.org
CONSUMER ELECTRONICS ASSOCIATION (CEA)
1919 South Eads St.
Arlington, VA 22202 Ph: 866-858-1555 or 703-907-7600 Fax: 703-907-7675 E-mail: cea@CE.org Internet: http://www.CE.org
CONSUMER PRODUCT SAFETY COMMISSION (CPSC)
4330 East-West Highway Bethesda, MD 20814-4408 Ph: 301-504-7923 Fax: 301-504-0124 or 301-504-0025 E-mail: info@cpsc.gov Internet: http://www.cpsc.gov
CONVEYOR EQUIPMENT MANUFACTURERS ASSOCIATION (CEMA)
6724 Lone Oak Boulevard Naples, FL 34109 Ph: 239-514-3441 Fax: 239-514-3470 E-mail: cema@cemanet.org Internet: http://www.cemanet.org
COOLING TECHNOLOGY INSTITUTE (CTI)
2611 FM 1960 West Suite A-101 Houston, TX 77068-3730 Ph: 281-583-4087 Fax: 281-537-1721 E-mail: vmanser@cti.org Internet: http://www.cti.org
COPPER DEVELOPMENT ASSOCIATION (CDA)
260 Madison Avenue New York, NY 10016 Ph: 212-251-7200 Fax: 212-251-7234 E-mail: questions@cda.copper.org Internet: http://www.copper.org
CRANE MANUFACTURERS ASSOCIATION OF AMERICA (CMAA)
8720 Red Oak Boulevard, Suite 201 Charlotte, NC 28217-3992 Ph: 704-676-1190 Fax: 704-676-1199 Internet: www.mhia.org/psc/PSC_Products_Cranes.cfm
CSA AMERICA, INC (CSA/AM)
8501 East Pleasant Valley Road
SECTION 01 42 00 Page 11
Cleveland, OH 44131-5575 Ph: 216-524-4990 or 877-235-9791 Fax: 216-520-8979 E-mail: sales@csagroup.org Internet: http://www.csa-america.org/
CSA STANDARDS (CSA)
178 Rexdale Blvd.
Toronto, ON, Canada M9W 1R3 Ph: 416-747-4000 E-mail: cathy.rake@csa-america.org Internet: http://www.csa-america.org
DOOR AND HARDWARE INSTITUTE (DHI)
14150 Newbrook Dr.
Chantilly, VA 20151-2232 Ph: 703-222-2010 Fax: 703-222-2410 E-mail: infor@dhi.org Internet: http://www.dhi.org
DISTRICT OF COLUMBIA MUNICIPAL REGULATIONS (DCMR)
1350 Pennsylvania Avenue, NW, Room 419 Washington DC 20004 Ph: 202-727-6306 8:30 a.m. to 5:00 p.m.
Fax: 202-727-3582 E-mail: secretary@dc.gov Internet: http://os.dc.gov/info/odai/odai.shtm
DOOR AND ACCESS SYSTEM MANUFACTURERS ASSOCIATION (DASMA)
1300 Sumner Avenue Cleveland, OH 44115-2851 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: dasma@dasma.com Internet: http://www.dasma.com
DUCTILE IRON PIPE RESEARCH ASSOCIATION (DIPRA)
245 Riverchase Parkway East, Suite O Birmingham, AL 35244 Ph: 205-402-8700 Fax: 205-402-8730 E-mail: info@dipra.org Internet: http://www.dipra.org
ELECTRICAL GENERATING SYSTEMS ASSOCIATION (EGSA)
1650 South Dixie Highway, Suite 400 Boca Raton, FL 33432-7462 Ph: 561-750-5575 Fax: 561-395-8557 E-mail: e-mail@egsa.org Internet: http://www.egsa.org
ELECTRONIC COMPONENTS ASSOCIATION (ECA)
2214 Rock Hill Rd., Suite 170 Herndon, VA 20170 Ph: 571-323-0294 Fax: 571-323-0245 E-mail: emikoski@ecaus.org
SECTION 01 42 00 Page 12
Internet: http://www.ecaus.org
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
2214 Rock Hill Rd., Suite 170 Herndon, VA 20170 Ph: 571-323-0294 Fax: 571-323-0245 E-mail: infor@ecaus.org Internet: http://www.eia.org
ELECTROSTATIC DISCHARGE ASSOCIATION (ESD)
7900 Turin Road, Building 3 Rome, NY 13440-2069 Ph: 315-339-6937 Fax: 315-339-6793 E-mail: info@esda.org http://www.esda.org/
ENERGY INSTITUTE (EI)
Publications Team Energy Institute 61 New Cavendish Street London
W1G 7AR, UK
Ph: +44 (0)20 7467 7100 Fax: +44 (0)20 7255 1472 Internet:
http://www.energyinstpubs.org.uk/cgi-bin/open.cgi?page=index
ETL TESTING LABORATORIES (ETL)
Intertek Testing Services, ETL SEMKO 70 Codman Hill Road Boxborough, MA 01719 Ph: 978-263-2662 Fax: 978-263-7086 E-mail: info@etlsemko.com Internet: http://www.intertek-etlsemko.com
EUROPEAN COMMITTEE FOR STANDARDIZATION (CEN/CENELEC)
CEN
Avenue Marnix 17 B-1000 Brussels Ph: 32-2-550-08-11 Fax: 32-2-550-08-19 E-mail: infodesk@cenorm.be Internet: http://www.cenorm.be
EXPANSION JOINT MANUFACTURERS ASSOCIATION (EJMA)
25 North Broadway Tarrytown, NY 10591 Ph: 914-332-0040 Fax: 914-332-1541 E-mail: inquiries@ejma.org Internet: http://www.ejma.org
FLUID CONTROLS INSTITUTE (FCI)
3916 Ranchero Drive Ann Arbor, MI 48108 Ph: 734-780-8000
SECTION 01 42 00 Page 13
Fax: 734-780-2046 E-mail: fci@fluidcontrolsinstitute.org Internet: www.fluidcontrolsinstitute.org
FLUID SEALING ASSOCIATION (FSA)
994 Old Eagle School Rd. #1019 Wayne, PA 19087 Ph: 610-971-4850 E-mail: info@fluidsealing.com Internet: www.fluidsealing.com
FM GLOBAL (FM)
270 Central Avenue P.O. Box 7500 Johnston, RI 02919 Ph: 401-275-3000 ext. 1945 Fax: 401-275-3029 E-mail: servicedesk.myrisk@fmglobal.com Internet: http://www.fmglobal.com
FOREST STEWARDSHIP COUNCIL (FSC)
212 Third Avenue North Suite 280 Minneapolis, MN 55401 Ph: 612-353-4511 Fax: 612-208-1565 E-mail: info@fscus.org Internet: http://www.fscus.org
FORESTRY SUPPLIERS INC. (FSUP)
205 West Rankin Street P.O. Box 8397 Jackson, MS 39284-8397 Ph: 800-752-8460 Fax: 601-292-0165 E-mail: cs@forestry-suppliers.com Internet: http://www.forestry-suppliers.com
FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH
(FCCCHR)
University of South California Kaprielian Hall 200 Los Angeles, CA 90089-2531 Ph: 213-740-2032 or 866-545-6340 Fax: 213-740-8399 E-mail: fccchr@usc.edu Internet: http://www.usc.edu/dept/fccchr
GEOLOGICAL SOCIETY OF AMERICA (GeoSA) P.O. Box 9140 Boulder, CO 80301-9140 Ph: 303-447-2020 Fax: 303-357-1070 E-mail: gsaservice@geosociety.org Internet: http://www.geosociety.org Publication available from: http://www.munsellstore.com/
GEOSYNTHETIC INSTITUTE (GSI)
475 Kedron Avenue
SECTION 01 42 00 Page 14
Folsom, PA 19033 1208 Ph: 610-522-8440 Fax: 610-522-8441 E-mail: mvashley@verizon.net Internet: http://www.geosynthetic-institute.org
GLASS ASSOCIATION OF NORTH AMERICA (GANA)
2945 SW Wanamaker Drive, Suite A Topeka, KS 66614 Ph: 785-271-0208 Fax: 785-271-0166 E-mail: gana@glasswebsite.com Internet: http://www.glasswebsite.com
GREEN BUILDING INITIATIVE (GBI)
2104 SE Morrison Portland, Oregon 97214 Ph: 877-424-4241 Fax: 503.961.8991 Email: info@thegbi.org Internet: http://www.thegbi.org/gbi/
GREEN SEAL (GS)
1001 Connecticut Avenue, NW Suite 827 Washington, DC 20036-5525 Ph: 202-872-6400 Fax: 202-872-4324 E-mail: greenseal@greenseal.org Internet: http://www.greenseal.org
GYPSUM ASSOCIATION (GA)
6525 Belcrest Road, Suite 480 Hyattsville, MD 20782 Ph: 301-277-8686 Fax: 301-277-8747 E-mail: info@gypsum.org Internet: http://www.gypsum.org
HARDWOOD PLYWOOD AND VENEER ASSOCIATION (HPVA)
1825 Michael Faraday Dr.
Reston, VA 20190 Ph: 703-435-2900 Fax: 703-435-2537 E-mail: hpva@hpva.org Internet: http://www.hpva.org
HEAT EXCHANGE INSTITUTE (HEI)
1300 Sumner Avenue Cleveland, OH 44115-2851 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: hei@heatexchange.org Internet: http://www.heatexchange.org
H.P. WHITE LABORATORY (HPW)
3114 Scarboro Road Street, MD 21154 Ph: 410-838-6550
SECTION 01 42 00 Page 15
Fax: 410-838-2802 E-mail: info@hpwhite.com Internet: http://www.hpwhite.com
HYDRAULIC INSTITUTE (HI)
6 Campus Drive, First Floor North Parsippany, NJ 07054-4406 Ph: 973-267-9700 Fax: 973-267-9055 E-mail: webmaster@pumps.org Internet: http://www.pumps.org
HYDRONICS INSTITUTE DIVISION OF GAMA (HYI)
35 Russo Place P.O. Box 218 Berkeley Heights, NJ 07922-0218 Ph: 908-464-8200 Fax: 908-464-7818 E-mail: information@gamanet.org Internet: http://www.gamanet.org
ICC EVALUATION SERVICE, INC. (ICC-ES)
5360 Workman Mill Road Whitier, CA 90601 Ph: 562-699-0543 Fax: 562-695-4694 E-mail: es@icc-es.org Internet: http://www.icc-es.org
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IES)
120 Wall Street, 17th Floor New York, NY 10005 Ph: 212-248-5000 Fax: 212-248-5018 E-mail: IES@IES.org Internet: http://www.IES.org
INDUSTRIAL FASTENERS INSTITUTE (IFI)
6363 Oak Tree Boulevard Independance, OH 44131 Ph: 216-241-1482 Fax: 216-241-5901 E-mail: IFI-orders@indfast.org Internet: http://www.industrial-fasteners.org
INSTITUTE OF INSPECTION, CLEANING, AND RESTORATION CERTIFICATION
(IICRC)
IICRC Administrative Office 2715 E Mill Plain Blvd.
Vancouver, WA 98661 Ph: 360-693-5675 Fax: 360-693-4858 Internet: http://www.iicrc.org/home
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
1901 North Moore Street Arlington, VA 22209-1762 Ph: 703-525-1695 Fax: 703-528-2148
SECTION 01 42 00 Page 16
E-mail: isea@safety equipment.org Internet: http://www.safetyequipment.org/
INSTITUTE OF TRANSPORTATION ENGINEERS (ITE)
1099 14th Street, Suite 300 West Washington, DC 20005-3438 Ph: 202-289-0222 Fax: 202-289-7722 E-mail: ite_staff@ite.org Internet: http://www.ite.org
INTERNATIONAL AIR TRANSPORT ASSOCIATION (IATA)
703 Waterford Way (NW 62nd Avenue), Suite 600 Miami, FL 33126 Ph: 305-264-7772 Fax: 305-264-8088 Internet: http://www.iata.org
INSTITUTE OF CLEAN AIR COMPANIES (ICAC)
2025 M Street NW, Suite 800 Washington, DC 20036 Ph: 202-367-1114 Fax: 202-367-2114 E-mail: icacinfo@icac.com Internet: http://www.icac.com
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
445 Hoes Lane or 2001 L Street, NW. Suite 700 Piscataway, NJ 08855-1331 or Washington, DC 20036-4910 USA Ph: 732-981-0060 or 800-701-4333 Fax: 732-562-6380 E-mail: onlinesupport@ieee.org or ieeeusa@ieee.org Internet: http://www.ieee.org
INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY (IEST)
2340 South Arlington Heights Rd.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .