FTFA_14-1128_RFIs.docx
DOCX document 19 KB Posted
- Attached to
- Renovate Hangar 421 Federal contract opportunity
- Solicitation number
- FA2823-16-R-4028
About this file
Requests for Information and Responses as of 05 August 2016.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information & Responses FA2823-16-C-4028, Renovate Hangar 421 (FTFA 14-1128) 05 Aug 2016
Q1. In the sow it says they are no bid options, but bid option 1 is listed on numerous pages, but a bid option is not listed on page 3 of 53 in solicitation. Please advise.
A1. Per Statement of Work dated 21 April 2016 paragraph 2(a): There are no bid options associated with this construction project; any references to bid options in the specifications or drawings shall be included in the single base CLIN that will be awarded on this contract (information to be updated in Amendment 1 to state that any references to bid options shall be included on CLIN 0001 of this contract since CLIN 0002 for fire suppression system was created after SOW).
Q2. I see the specification section for long term base access, but no specific needs for the site visit at 52.236-27. Do I need to only gather the affidavits for base access or are there other requirements for you?
A2. The forms that are required are the affidavit (Attachment K of the solicitation) and the memorandum template (Attachment L of the solicitation). This can be found in section 2.9 of the Section L
Q3. On page A-201, note 11 it shows new led fixtures above the doors, but on the electrical drawings E-5,6 it does not reference any fixtures, nor is it listed in the fixture schedule on page E-6. Please advise.
A3. Approved drawings indicate light fixtures types D & E at exits. These are included on the fixture schedule on page E-6. Please refer to the approved drawings.
Q4. Also on page E-6 top right it references fixture L and M, but these are not in the schedule or on the prints. Please advise.
A4. References to fixtures L and M are incorrect. The correct type of fixtures will be indicated in an amendment once the RFI period has closed.
Q5. Also on page E-6 on the fixture schedule it shows a triangle with no letter? But on page E-5 room 111 it shows 5 of these symbols?
A5. The approved drawings clearing indicate the items as answered. Please refer to approved drawings.
Q6. On page E-5 top left note 4 it calls for dimming ballast in fixtures A,B,F,and G, but nowhere on the prints are there any dimmers shown?
A6. Location of dimmers will be corrected and indicated in an amendment once the RFI period has closed.
Q7. On page E-17 panel schedule H2N and H2S it does not show the aic ratings of the panels?
A7. Panel H2N: 25 KAIC Panel H2S: 25 KAIC
Q8. On page E-5 room 118 janitor and on page E-6 room 224 janitor shows no light fixtures?
A8. Janitor Rooms 118 and 224 will be fixture type C unless noted otherwise.
Q9. On page FP-2, re: notes 5,6,11 it shows 2 sizes of hand holes 1 for communications and 1 for electric as shown on details on page FP-9. I only see 1-4” pvc conduit but two different types of work, communications and electrical. Typically you don’t put these two different types of work in same handhole. Are there supposed to be 2 conduits? One for electrical and one for communications. Please clarify. Also the prints read that this work is to be in base bid? Is this correct?
A9. There should be two conduits. Ignore all references to base bid or options. All work is to be done at one time, under one single bid.
File details come from the government source that posted it. Updated .