FTFA_14-1128_Final_SOW_Rev_1_Aug_16.docx
DOCX document 29 KB Posted
- Attached to
- Renovate Hangar 421 Federal contract opportunity
- Solicitation number
- FA2823-16-R-4028
About this file
Revised Statement of Work dated 01 August 2016.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR CONSTRUCTION
FTFA 14-1128
RENOVATE BUILDING #421 (AFRL)
Revision #1 01 Aug 16
1. STATEMENT OF WORK: The Contractor shall perform all construction services for subject project, located on Eglin Air Force Base, Florida. The intent of this project is to renovate the two lean-tos on the north and south sides of Hangar #421, as well as portions of the existing machine shop and exteriors.
2. PROJECT DESCRIPTION: The contractor shall furnish all parts, labor, tools, materials, plant, and transportation necessary to perform work required in this contract. Work will include removal of existing exterior, interior, and structural components, mechanical system components, electrical and communications components, finishes, ceilings, walls, doors, associated hardware and the installation of upgraded components as shown on the construction documents. Work shall be performed in accordance with the requirements and regulations set forth in the plans, specifications, and the contract documents, as well as the Eglin AFB Architectural Standards, and the Eglin Wire and Communications Specifications and Standards. It is the contractor’s responsibility to ensure the finished product meets all applicable current codes, regulations, guidelines, manuals, acts, laws, and standards.
a. There are no bid options associated with this construction project; any references to bid options in the specifications or drawings shall be included in CLIN 0001.
3. DRAWINGS: All drawings are to be produced in Autodesk, AutoCAD Minimum Release 2014 .dwg electronic files. Files from previous version releases are not authorized to be incorporated or utilized in creation of any new drawings for this project.
4. COMPLETION DATE: All construction work under this delivery order shall be completed within 365 calendar days after Notice to Proceed is issued.
END OF STATEMENT OF WORK