ATTACHMENT_A_SOW_26_Jan_2016_FTFA_11-1058.pdf
PDF 17 KB Posted
- Attached to
- Replace Approach Lighting Duke Field Federal contract opportunity
- Solicitation number
- FA2823-16-R-4007
About this file
ATTACHMENT A SOW 26 Jan 2016 FTFA 11-1058
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA2823-16-R-4007_Proposal_Hand_Carry_Base_Access_Instructions_for_Offerors.docx | DOCX document | |
| RFIs_FA2823-16-C-4007_Approach_Lights_Duke.docx | DOCX document | |
| FA282316R4007_Q A_1__20160412.docx | DOCX document | |
| FA2823-16-R-4007_Replace_Approach_Lighting_Duke_Field.pdf | ||
| ATTACHMENT_G_Financial_Responsibility_Questionaire.docx | DOCX document | |
| ATTACHMENT_H_HOLD_HARMLESS_AGREEMENT.doc | DOC document | |
| ATTACHMENT_E_Past_Performance_Project_Information.docx | DOCX document | |
| ATTACHMENT_B_FTFA_11-1058_Drawings_14AI.pdf | ||
| ATTACHMENT_C_FTFA11-1058_Specifications_14AI.pdf | ||
| ATTACHMENT_I_Base_Access_Affidavit_and_letter.pdf | ||
| ATTACHMENT_D_WD_FL160222_08Jan2016.pdf | ||
| ATTACHMENT_F_Past_Performance_Questionnaire.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR CONSTRUCTION
FTFA 11-1058
REPLACE APPROACH LIGHT STRUCTURES AT RUNWAY 18
FIELD 3, DUKE FIELD, EGLIN AFB
26 January 2016
1. STATEMENT OF WORK: The Contractor shall perform all construction services for subject project, located at Duke Field (Field 3) on Eglin Air Force Base, Florida. The primary purpose of this work is to replace the Approach Runway Lighting System at the north end of Runway 18, per the drawings, specifications, and contract documents.
2. PROJECT DESCRIPTION: The existing timber airfield lighting structures at the north end of runway 18 are severely deteriorated, do not provide a safe platform for maintenance, do not comply with UFC requirements to be of frangible or semi-frangible type construction per UFC 3-260-01 Airfield and Heliport Planning and Design, and do not meet the overrun length for airfield lighting structures per UFC 3-535-01 Visual Air Navigation Facilities.
The work includes replacing the existing approach lighting system on Runway 18 at Duke Field and incidental related work, as indicated in the contract documents.
The Base Bid shall consist of installing new approach lights and sequenced flashing lights, low impact resistant structures, cabling and associated equipment and ducts on approach to Runway 18. Bid Option 1 shall consist of installing additional duct runs on airfield where no spare ducts exist.
Refer to projects drawings and specifications for additional project requirements.
Provide (2) hardcopy sets, and one (1) Mylar set of As-Built drawings upon completion of the construction of the project. As builts are also to be provided in .pdf format and .dwg format (AutoCAD). Electronic Design Deliverables are to comply with UFC 1-300-10, Electronic Design Deliverables (EDD) Manual of Policies and Procedures. All drawings are to be produced in Autodesk, AutoCAD, Minimum Release 2014 .dwg electronic files.
Files from previous version releases are not authorized to be incorporated or utilized in creation of any new drawings for this project.
3. SUBMITTALS: To be discussed at the preconstruction meeting include, but may not be limited to: Material Submittals, Work permits, Utility Outage Requests, Utility Connection Requests, Welding Permits, and Burning permits.
- The contractor is responsible for marking and verifying all utilities not marked.
4. PRE-PROPOSAL CONFERENCE: The Contracting Officer will establish a conference date/time to conduct a site visit upon receipt of the solicitation document.
5. LOCATION: The work is located at Duke Field (Field 3) on Eglin Air Force Base, FL. The exact location of the work is the North End of Runway 18. Refer to Project Drawings for site plans.
6. GOVERNMENT PERSONEL: The Project Engineer for this project is David Wolfson, 883-1350 and the Project Inspector is Mr. Brian Dwyer, 883-1360.
7. COMPLETION DATE: All construction work under this delivery order shall be completed within 10 months after Notice to Proceed is issued.
END OF STATEMENT OF WORK
| STATEMENT OF WORK (SOW) |
| REPLACE APPROACH LIGHT STRUCTURES AT RUNWAY 18 |
| FIELD 3, DUKE FIELD, EGLIN AFB |
| 26 January 2016 |