Attachment_4_-_Technical_Evaluation_Factors.docx

DOCX document 24 KB Posted

Attached to
Roller Drum Chopping Services Federal contract opportunity
Solicitation number
FA2823-15-R-4012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Attachment 4 - Technical Evaluation Factors

View the file

Other files for this federal contract opportunity

Other files attached to Roller Drum Chopping Services, newest first.
File Type Posted
Attachment_02_-_Clauses_and_Provisions.docx DOCX document
Attachment_04_-_Affidavit.pdf PDF
Attachment_05_-Memorandum_Letter.doc DOC document
Attachment_03_-_Bid_Schedule.docx DOCX document
Attachment_01_-_SOW_FY15_Roller_Drum_Chopping_REV_A_-_22_July_2015.doc DOC document
RFP_Combo_Amendment__01.docx DOCX document
Attachment_1_-_SOW_FY15_Roller_Drum_Chopping_23_June_2015.pdf PDF
Attachment_3_-_Bid_Schedule.docx DOCX document
Attachment_2_-_Clauses_and_Provisions.docx DOCX document
Attachment_5_-_Bid_Schedule.docx DOCX document
Attachment_1_-_SOW_FY15_Roller_Drum_Chopping_23_June_2015.pdf PDF
Attachment_2_-_Clauses_and_Provisions.docx DOCX document
Attachment_3_-_Addendums_to_FAR_52.212-1_and_FAR_52.212-2.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 Technical Evaluation FA2823-15-R-4012 Roller-Drum Chopping, Eglin AFB, FL

INDIVIDUAL RATING TEAM WORKSHEET

Requirement: Roller-Drum Chopping Date: ___________ Solicitation Number: FA2823-15-R-4012

OFFEROR:

INITIAL EVALUATION FINAL EVALUATION

TECHNICAL ACCEPTABILITY

***THIS DOCUMENT IS NOT TO BE RETURNED WITH PROPOSALS***

Acceptable Unacceptable

FACTOR 1: MANAGEMENT CAPABILITY

Subfactor (1): Provide an organization structure – chain of Acceptable Unacceptable responsibility clearly shows capability of meeting all the SOW requirements.

Subfactor (2): Description of on-site organization showing Acceptable Unacceptable the capability to manage day-to-day operations.

FACTOR 2: REQUIREMENT SPECIFIC ABILITIES

Subfactor (1): CREW MAKEUP: Number and suitability to Acceptable Unacceptable perform quality work at the required pace of production.

Subfactor (2): Personal Protective Equipment Acceptable Unacceptable and Safety Practices Subfactor (3): List experience with work on a military Acceptable Unacceptable reservation or area with restricted access.

Subfactor (4): Describe care of natural resources, including Acceptable Unacceptable disposal of trash/debris, and care for improve-ments.

Subfactor (5): Equipment suitability: The number, Acceptable Unacceptable maintenance, and condition of equipment needed to perform the job efficiently

STRENGTHS: (If needed, Use the continuation sheet)

DEFICIENCIES: (If needed, Use the continuation sheet )

NARRATIVE (Explain how proposal exceeds or fails to meet the requirements. If exceeds, explain how it benefits the Air Force.) (If needed, use the continuation sheet)

Evaluator’s Name _______________________ Office symbol: _________________________ E-mail address: _________________________

SIGNATURE SIGNATURE (Lead Technical Evaluator)

When filled in, this document is Source Selection Sensitive Information IAW FAR 3.104

File details come from the government source that posted it. Updated .