Atch 8 Hazardous Waste Form.doc
DOC document 39 KB Posted
- Attached to
- Repair Cracks, Joints, Slabs, Airfield Federal contract opportunity
- Solicitation number
- FA252120B0004
About this file
This document contains a hazardous waste forecast form and details of a related federal contract opportunity for repair work at Patrick Air Force Base in Florida. The hazardous waste forecast form requires contractors to identify any hazardous materials that will be used on the project, the processes where each material will be used, and the description and estimated quantity of any anticipated hazardous waste. The federal contract opportunity is a firm-fixed-price construction contract between $1 million to $5 million to repair cracks, joints and slabs in airfield pavements at Patrick Air Force Base. The work includes localized concrete and asphalt patching and repairs as well as airfield marking replacement. The solicitation number is FA252120B0004 and responses are due by August 5, 2020, though funds are not presently available and no award will be made until funding is in place. This is an opportunity set aside exclusively for small businesses as defined by NAICS code 237310 with a size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice of Award (Advon).pdf | ||
| FA252120B00040002 SF 30.pdf | ||
| FA252120B00040002.pdf | ||
| Solicitation Amendment FA252120B00040001.pdf | ||
| Atch 5 WD FL20200001 (21 Feb 2020).pdf | ||
| Class_Deviation_2020-O0005_Attachment.pdf | ||
| Site Visit Attendee 26 Feb 2020.pdf | ||
| zzSite Visit Questions.pdf | ||
| Solicitation Amendment FA252120B00040001 SF 30.pdf | ||
| Atch 5 WD FL20200001 (31 Jan 2020).pdf | ||
| Atch 3 Drawings.pdf | ||
| Attch 9 Q & A Template.doc | DOC document | |
| Atch 6 Badge Request (45 SFS).pdf | ||
| Atch 1 SOW.pdf | ||
| Atch 4 CECC Form 3052.xls | XLS spreadsheet | |
| Atch 7 GPP.pdf | ||
| Solicitation - FA252120B0004.pdf | ||
| Atch 2 Tech Spec..pdf | ||
| Atch 5 WD FL20200001 (31 Jan 2020).pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION
| PROJECT #: |
| SXHT 15-1035 |
| PROJECT TITLE: |
| Repair Cracks/Joints/Slabs, Airfield Pavement |
CONTRACTOR:
POINT OF CONTACT:
PHONE:
FAX:
| HAZARDOUS MATERIAL: |
| DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL |
(INCLUDE METHOD OF APPLICATION)
| DESCRIPTION OF WASTE: |
| QUANTITY: |
Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.
Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:
1) Must remove and dispose of paints, building components, or equipment containing hazardous materials (lead, mercury, etc.)
2) Submits an MSDS for approval of use of a material known to be hazardous.
On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.
1. Project #: Provide installation project number.
2. Project Title: Provide installation project title.
3. Contractor: Enter complete name of contractor performing process.
4. Point of Contact: Provide name of individual knowledgeable on requirements of materials listed.
5. Phone/Fax: Provide phone and fax numbers for point of contact.
6. Hazardous Material: Provide common name of each hazardous material
7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).
8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.
9. Quantity: Estimate quantity of waste to be generated
10. Sign and date each form at bottom
CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________
File details come from the government source that posted it. Updated .