Atch 4 CECC Form 3052.xls
XLS spreadsheet 39 KB Posted
- Attached to
- Repair Cracks, Joints, Slabs, Airfield Federal contract opportunity
- Solicitation number
- FA252120B0004
About this file
This document contains a construction cost estimate breakdown template and a solicitation for repair of cracks, joints, slabs, and airfields at Patrick Air Force Base in Florida.
The construction cost estimate breakdown template provides a standard format for contractors to submit cost and pricing data, including itemized direct costs for materials, labor, equipment, and other expenses. Contractors must disclose their entire estimating process using this template along with any necessary supporting documentation. The solicitation seeks offers for repair of concrete and asphalt pavements and airfield markings between $1-5 million. Offerors must be small businesses. Proposed prices will be valid until August 2020, though funds are presently unavailable and no award will be made until funding is obtained. The Department of the Air Force Space Command is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice of Award (Advon).pdf | ||
| FA252120B00040002 SF 30.pdf | ||
| FA252120B00040002.pdf | ||
| Solicitation Amendment FA252120B00040001.pdf | ||
| Atch 5 WD FL20200001 (21 Feb 2020).pdf | ||
| Site Visit Attendee 26 Feb 2020.pdf | ||
| zzSite Visit Questions.pdf | ||
| Class_Deviation_2020-O0005_Attachment.pdf | ||
| Solicitation Amendment FA252120B00040001 SF 30.pdf | ||
| Atch 5 WD FL20200001 (31 Jan 2020).pdf | ||
| Atch 6 Badge Request (45 SFS).pdf | ||
| Atch 1 SOW.pdf | ||
| Atch 3 Drawings.pdf | ||
| Attch 9 Q & A Template.doc | DOC document | |
| Atch 7 GPP.pdf | ||
| Solicitation - FA252120B0004.pdf | ||
| Atch 2 Tech Spec..pdf | ||
| Atch 5 WD FL20200001 (31 Jan 2020).pdf | ||
| Atch 8 Hazardous Waste Form.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| PURCHASE REQUEST FORM | PROJECT NUMBER | WORK LOCATION | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | MANDAYS | RATE | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 0.00 | 0.00 | 0.00 | 0.00 | |||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | ||||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| CECC FORM 3052 | PAGE 1 | |||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | ||||||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient | ||||||||||
| detail to permit itemizing of all direct costs. | ||||||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards-- | ||||||||||
| CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB). | ||||||||||
| Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will | ||||||||||
| be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price | ||||||||||
| contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1. | ||||||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in | ||||||||||
| column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost. | ||||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the | ||||||||||
| contract and of significant dollar value. | ||||||||||
| Col 10 Line Total. Self-explanatory. | ||||||||||
| NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on | ||||||||||
| the last page as follows. | ||||||||||
| TOTAL MATERIAL COSTS | $ | |||||||||
| TOTAL LABOR COSTS | $ | |||||||||
| TOTAL OTHER DIRECT COSTS | $ | |||||||||
| TOAL DIRECT COSTS | $ | |||||||||
| OVERHEAD | $ | |||||||||
| SUBTOTAL | $ | |||||||||
| PROFIT | $ | |||||||||
| TOTAL PRICE | $ | |||||||||
| DATE | FIRM NAME | |||||||||
| TITLE | BY | |||||||||
| (Signature) | ||||||||||
| INSTRUCTIONS TO OFFERORS | ||||||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of | ||||||||||
| incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award | ||||||||||
| of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a | ||||||||||
| certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4). | ||||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit | ||||||||||
| with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an | ||||||||||
| appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that | ||||||||||
| there be a clear understanding of | ||||||||||
| a. The existing, verifiable data | ||||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as | ||||||||||
| appropriate), and made available to the contracting officer or his authorized representative on request. | ||||||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, | ||||||||||
| for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which | ||||||||||
| will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right | ||||||||||
| may be exercised in connection with any negotiations prior to contract award. | ||||||||||
| (Reverse of AF Form 3052, Jan 88) | ||||||||||
| *U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319 |
Page &P of &N
File details come from the government source that posted it. Updated .