MCSQuestions6.24.doc

DOC document 41 KB Posted

Attached to
Replace Command Post Generator Federal contract opportunity
Solicitation number
FA252119BA015
Issued by
Department of the Air Force Space Command

About this file

Questions answered

View the file

Other files for this federal contract opportunity

Other files attached to Replace Command Post Generator, newest first.
File Type Posted
FA252119BA015_Bid_Abstract.pdf PDF
ETIDCustomerUserGuide.pdf PDF
DRAINED_AND_PURGED_Checklist.pdf PDF
Solicitation_Amendment_FA252119BA0150002_SF_30.pdf PDF
Attachment_4_GPP_Certification.pdf PDF
Attachment_5_Q&A_Template.doc DOC document
Solicitation_-_FA252119BA015.pdf PDF
Attachment_5_ODS_Statement.pdf PDF
Solicitation_Amendment_FA252119BA0150001_SF_30.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_3_Construction_Wage_Determination_FL190001.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Command Post Generator (SXHT13-1050) Patrick AFB, FL Question and Answer Template Contractor Name: Martinez Construction Services POC: Angie Goral, angiegoral@martinezconstruction.com, 321-349-2000 IFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) E-001, under sequence of construction for generator and transfer switch replacement Question:

Do we need to test the new generator and ATS on site? Or will the paperwork from the factory that everything has been tested be adequate to meet this requirement?

Response:

Generator and ATS shall be tested after installation.

IFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) ED-101, under flag notes Question:

Can the old ATS be used as a part of the temporary system until the new ATS is in place?

Response:

Existing ATS can be used as part of the temporary system. Do not damage or modify old ATS.

IFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) ED-101, under flag notes Question:

Does the old 50KW generator need to be shipped to Jacksonville by a certain date?

Response:

Deliver generator to Cape Canaveral AFS, Building 1623. Drain & purge all fuels, and liquids. See attached Electronic Turn in Document instructions and Drain & Purge checklist.

IFP Section __________ Paragraph _________

SOW Paragraph ___________

Other (Specify) E-001, under sequence of construction for generator and transfer switch replacement Question:

Is the maximum power outage of 4 hours for both the removal (4 hours) and the install (4 hours)?

Response:

Each outage is limited to 4 hours.