MCSQuestions6.24.doc
DOC document 41 KB Posted
- Attached to
- Replace Command Post Generator Federal contract opportunity
- Solicitation number
- FA252119BA015
About this file
Questions answered
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA252119BA015_Bid_Abstract.pdf | ||
| ETIDCustomerUserGuide.pdf | ||
| DRAINED_AND_PURGED_Checklist.pdf | ||
| Solicitation_Amendment_FA252119BA0150002_SF_30.pdf | ||
| Attachment_4_GPP_Certification.pdf | ||
| Attachment_5_Q&A_Template.doc | DOC document | |
| Solicitation_-_FA252119BA015.pdf | ||
| Attachment_5_ODS_Statement.pdf | ||
| Solicitation_Amendment_FA252119BA0150001_SF_30.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_3_Construction_Wage_Determination_FL190001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Command Post Generator (SXHT13-1050) Patrick AFB, FL Question and Answer Template Contractor Name: Martinez Construction Services POC: Angie Goral, angiegoral@martinezconstruction.com, 321-349-2000 IFP Section __________ Paragraph _________
SOW Paragraph ___________
Other (Specify) E-001, under sequence of construction for generator and transfer switch replacement Question:
Do we need to test the new generator and ATS on site? Or will the paperwork from the factory that everything has been tested be adequate to meet this requirement?
Response:
Generator and ATS shall be tested after installation.
IFP Section __________ Paragraph _________
SOW Paragraph ___________
Other (Specify) ED-101, under flag notes Question:
Can the old ATS be used as a part of the temporary system until the new ATS is in place?
Response:
Existing ATS can be used as part of the temporary system. Do not damage or modify old ATS.
IFP Section __________ Paragraph _________
SOW Paragraph ___________
Other (Specify) ED-101, under flag notes Question:
Does the old 50KW generator need to be shipped to Jacksonville by a certain date?
Response:
Deliver generator to Cape Canaveral AFS, Building 1623. Drain & purge all fuels, and liquids. See attached Electronic Turn in Document instructions and Drain & Purge checklist.
IFP Section __________ Paragraph _________
SOW Paragraph ___________
Other (Specify) E-001, under sequence of construction for generator and transfer switch replacement Question:
Is the maximum power outage of 4 hours for both the removal (4 hours) and the install (4 hours)?
Response:
Each outage is limited to 4 hours.