Attachment_4_GPP_Certification.pdf
PDF 125 KB Posted
- Attached to
- Replace Command Post Generator Federal contract opportunity
- Solicitation number
- FA252119BA015
About this file
GPP Cert
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA252119BA015_Bid_Abstract.pdf | ||
| MCSQuestions6.24.doc | DOC document | |
| ETIDCustomerUserGuide.pdf | ||
| DRAINED_AND_PURGED_Checklist.pdf | ||
| Solicitation_Amendment_FA252119BA0150002_SF_30.pdf | ||
| Attachment_5_Q&A_Template.doc | DOC document | |
| Solicitation_-_FA252119BA015.pdf | ||
| Attachment_5_ODS_Statement.pdf | ||
| Solicitation_Amendment_FA252119BA0150001_SF_30.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_3_Construction_Wage_Determination_FL190001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREEN PURCHASING PROGRAM CERTIFICATION DETERMINATION
INSTRUCTIONS
This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products. This form is not required for construction item purchases less than $2,000, or for other purchases less than $2,500. The completed form becomes part of the contracting office contract file.
PROCUREMENT TITLE: Replace Generator, Alternate Command Post, Building 603
PROCUREMENT REQUEST NO.
PART 1: RECOVERED MATERIALS DETERMINATION
Part 1 shall be completed by the specifying authority when requesting a procurement action.
EPA-DESIGNATED ITEMS
(Place a check mark next to each product that applies to this procurement)
Construction Products:
Building insulation Polyester carpet Carpet Cushion
Cement & concrete containing:
Coal fly ash Ground granulated blast furnace slag Cenospheres Silica fume Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/ surfaces Roofing materials Shower & restroom dividers/partitions Structural fiberboard
Landscaping Products
Compost from yard trimmings or food waste
Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts
Park & Recreation Products:
Park and recreational furniture
Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safety barriers)
Non-paper Office Products
Binders (paper, solid plastic or plastic covered)
Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges
Paper & Paper Products
Commercial/industrial sanitary tissue products
Miscellaneous papers Newsprint Paperboard and packaging Printing and writing papers Tray liners
Vehicular Products:
Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires
Transportation Products
Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones
Miscellaneous Products:
Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping http://www.epa.gov/cpg/products
PART 1: RECOVERED MATERIALS DETERMINATION (CONT’D)
FAR 11.002(d) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.
If no EPA designated items were checked on page 1, than check box A:
A. I hereby certify that no EPA designated guideline items are included in this procurement action
If any EPA designated items are checked on page 1, than mark box B or C:
B. I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action
OR
C. I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable.
If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
The exemption being claimed for this purchase is:
1. The product does not meet appropriate performance standards (in accordance with National
Institute of Standards and Technology (NIST) guidelines
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).
Designated Item Justification #
1.
2.
3.
4.
5.
Design/Specifying Agent Signature Date
Requiring Organization’s Technical Representative Signature Date
1229014770C Typewritten Text 6 Mar 2019
1229014770C Typewritten Text 6 Mar 2019
PART 2: GREEN PROCUREMENT CERTIFICATION
Part 2 of this certification is to be completed upon receipt of the purchase goods and services. If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services. Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.
Check the appropriate box:
A. EPA recycled content requirements have been met for all designated items specified in this procurement action.
OR
B. EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.
If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
Institute of Standards and Technology (NIST) guidelines.)
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).
Designated Item Justification #
1.
2.
3.
4.
5.
Contractor/Supplying Agent Signature Date
GREEN PURCHASING PROGRAM
EPA CPG DESIGNATED ITEM PURCHASE EXEMPTION
The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:
The following item does not comply with EPA standards for recycled/recovered materials:
Institute of Standards and Technology (NIST) guidelines)
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per
This written justification is made in accordance with 42USC 6962(c)(1):
Design/specifying Agent’s Signature Date
Contracting Officer’s Signature Date
Rationale for exemption: (Please provide the rationale upon which this justification was based. Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.
| INSTRUCTIONS |
| PROCUREMENT REQUEST NO. |
| PART 1: RECOVERED MATERIALS DETERMINATION |
| EPA-DESIGNATED ITEMS |
| Construction Products: |
| Landscaping Products |
| Non-paper Office Products |
| Paper & Paper Products |
| Retread tires |
| Transportation Products |
| PROCUREMENT REQUEST NO. |
| Designated Item Justification # |
| PROCUREMENT REQUEST NO. |
| PART 2: GREEN PROCUREMENT CERTIFICATION |
| Designated Item Justification # |
| PROCUREMENT REQUEST NO. |
| Requiring Organization’s Technical Representative Signature Date |
| Contracting Officer’s Signature Date |
| 2019-03-06T15:50:40-0500 | |
| SKUPIEN.JEFFREY.J.1229014770 |
| 2019-03-06T15:51:04-0500 | |
| SKUPIEN.JEFFREY.J.1229014770 |
File details come from the government source that posted it.