Solicitation no. FA2521-15-B-0005 Amendment 01 Attachment 10 - Operations and Maintenance Instruction Q6880 43 pages 05 Apr 2005
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMI Q6880
REV BASIC
04/05/05
HAZARDOUS
OPERATIONS AND MAINTENANCE INSTRUCTION
TOWER INSPECTION AND REPAIR
CCAFS, KSC, PAFB, AND AIR FORCE MAINLAND SITES
PERSONNEL PERFORMING THESE INSTRUCTIONS SHALL HAVE A COPY OF
THIS OMI IN THEIR POSSESSION AND SHALL FOLLOW THE INSTRUCTIONS
WHILE THE PROCEDURAL ACTIVITIES ARE BEING PERFORMED. PERSONNEL
PERFORMING THESE INSTRUCTIONS MUST HAVE ALL REQUIRED CURRENT
MEDICAL AND OPERATIONAL CERTIFICATION CARDS IN THEIR
POSSESSION.
THIS DOCUMENT CONTAINS
HAZARDOUS OPERATIONS
Space Gateway Support Inc.
JBOSC
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
S P A C E G A T E W A Y S U P P O R T
: TOWER INSPECTION AND REPAIR : No. of Pages: 40
: CCAFS, KSC, PAFB, AND AIR FORCE :
: MAINLAND SITES : Category: H
SIGNATURE & DATE SIGNATURE & DATE
CHANGE/
REVISION DATE DESCRIPTION/PAGES AFFECTED
Q6880 :04/05/05 : PP. - ALL - BASIC ISSUE. VALIDATED 11/10/2004.
BASIC : :
THIS OMI CONTAINS HAZARDOUS OPERATIONS
AFM
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
TABLE OF CONTENTS
SECTION TITLE PAGE
1.0 INTRODUCTION
1.1 PURPOSE AND SCOPE
1.2 DESCRIPTION
1.3 LOCATION
1.4 SPECIFICATIONS
1.5 VALIDATION OF INSTRUCTIONS
1.6 INSPECTION FREQUENCY
2.0 REFERENCES
2.1 GENERAL REFERENCES
2.2 OPERATIONAL REFERENCES
3.0 SAFETY INFORMATION
3.1 SPECIFIC HAZARDS
3.2 SAFETY EQUIPMENT
3.2.1 PERSONAL PROTECTIVE EQUIPMENT (PPE)
3.2.2 NONPERSONAL PROTECTIVE EQUIPMENT
4.0 SUPPORT REQUIREMENTS
4.1 ESSENTIAL PERSONNEL
4.1.1 OPERATING PERSONNEL
4.1.2 MONITORING PERSONNEL
4.2 OPERATING EQUIPMENT AND MATERIALS
4.3 OPERATING ORGANIZATION INSTRUCTIONS
4.4 QUALITY INSPECTION REQUIREMENTS
4.5 TOWER INSPECTION REQUIREMENTS
5.0 PRE-OPERATIONS INSTRUCTIONS
5.1 PREPARATIONS
5.2 NOTIFICATIONS
5.3 GENERAL WARNINGS, CAUTIONS, AND NOTES
6.0 INSPECTION AND MAINTENANCE PROCEDURES
6.1 GUYED AND SELF-SUPPORTING TOWERS
6.2 GUYED TOWERS
7.0 POST-OPERATIONS INSTRUCTIONS
LIST OF ILLUSTRATIONS
FIGURE 1 TOWER GEOMETRY
FIGURE 2 TOWER PLOT PLAN
FIGURE 3 TOWER LEG VERTICAL ALIGNMENT
FIGURE 4 DISTANCE OF EACH GUY ANCHOR FROM CENTER OF TOWER
FIGURE 5 3-WAY GUYED TOWER CABLE GUY DATA
FIGURE 6 4-WAY GUYED TOWER CABLE GUY DATA
LIST OF APPENDICES
APPENDIX A DAILY TOWER CLIMBING CHECKLIST FORM FAM-F-0185 .............A-1
APPENDIX B TOWER INSPECTION CHECKLIST FORM FAM-F-0190..................B-1
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
APPENDIX Z EMERGENCY INSTRUCTIONS .....................................Z-1
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
HAZARDOUS
SUBJECT: TOWER INSPECTION AND REPAIR, CCAFS, KSC, PAFB, AND AIR FORCE
MAINLAND SITES
1.0 INTRODUCTION
1.1 PURPOSE AND SCOPE
THIS DOCUMENT DESCRIBES INITIAL AND PERIODIC TOWER INSPECTION AND
MAINTENANCE PROCEDURES.
1.2 DESCRIPTION
THE PROCEDURES IN THIS DOCUMENT ARE PERFORMED ON TOWERS OF
VARIOUS TYPES AND SIZES.
1.3 LOCATION
THIS PROCEDURE WILL BE PERFORMED AT VARIOUS LOCATIONS THROUGHOUT
CCAFS, KSC AND PAFB, AND AIR FORCE MAINLAND SITES.
1.4 SPECIFICATIONS
ALL SPECIFICATIONS THAT ARE AVAILABLE ARE INCLUDED IN MAXIMO.
1.5 VALIDATION OF INSTRUCTIONS
OMI VALIDATION WAS COMPLETED ON 12/22/2004 BY ANNUAL MAINTENANCE
AND TABLETOP REVIEW.
1.6 INSPECTION FREQUENCY
AS A MINIMUM, INSPECT EACH TOWER EVERY 3 YEARS, AFTER HURRICANE-
FORCE WINDS (75 MPH), OR AFTER AN EVENT THAT COULD HAVE DAMAGED
TOWER.
2.0 REFERENCES
2.1 GENERAL REFERENCES
DOCUMENT REVISION TITLE______________
O KNPR 8715.3 LI KSC SAFETY PRACTICES PROCEDURAL
REQUIREMENTS
O OSH-P-0100 LI SGS SAFETY AND HEALTH PROGRAM
O OSH-P-0106 LI MISHAP REPORTING AND INVESTIGATION
O OSH-P-0202 LI PERSONAL PROTECTIVE EQUIPMENT
PROGRAM
O OSH-P-0201 LI HAZARDOUS ENERGY CONTROL PROGRAM
(LOCKOUT/TAGOUT)
O AFSPCM 91-710 LI RANGE SAFETY REQUIREMENTS
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
2.2 OPERATIONAL REFERENCES
DOCUMENT REVISION TITLE______________
O OSH-P-0203 LI FALL PROTECTION
O FAM-F-0190 LI TOWER INSPECTION CHECKLIST
O FAM-F-0185 LI DAILY TOWER CLIMBING CHECKLIST
O TIA/EIA-222 F STRUCTURAL STANDARDS FOR STEEL
ANTENNA TOWERS AND ANTENNA
SUPPORTING STRUCTURES
3.0 SAFETY INFORMATION
3.1 SPECIFIC HAZARDS
O WORKING AT UNPROTECTED HEIGHTS (STEPS 6.0.2 THROUGH 6.2)
O WORKING NEAR RADIO AND MICROWAVE TRANSMITTER RADIATION
SOURCES
O WORKING NEAR ELECTRICAL POWER SYSTEMS
O WORKING AROUND DAMAGED AND/OR CORRODED STRUCTURAL MEMBERS
THAT CAN BREAK AND FALL
O WORKING AROUND GUY CABLES THAT CAN BREAK AND RELEASE STORED
ENERGY
O WORKING AROUND TRIPPING HAZARDS
O WORKING UNDER TOOLS THAT CAN FALL IF DAMAGED TETHER LINES
BREAK
O WORKING AROUND SHARP EDGES THAT CAN CAUSE CUTS AND SCRATCHES
O WORKING AROUND LOOSE COATINGS AND CORRODED SURFACES THAT
COULD CAUSE DEBRIS TO ENTER EYES
3.2 SAFETY EQUIPMENT
3.2.1 PERSONAL PROTECTIVE EQUIPMENT (PPE)
PERSONNEL PERFORMING THE OPERATION SHALL WEAR THE FOLLOWING PPE AS
INDICATED:
O FOOTWEAR – LOW-HEELED, CLOSED TOE, NONPOROUS SHOES MADE OF
LEATHER OR EQUIVALENT, WITH SOLES HEAVY ENOUGH AND OF
APPROPRIATE COMPOSITION, TO PROVIDE ADEQUATE FOOT PROTECTION
IN ACCORDANCE WITH ALL COMMODITY MATERIAL SAFETY DATA SHEETS
(MSDS) AND WORK ENVIRONMENT. SAFETY TOE SHOES WITH INSTEP
SUPPORT REINFORCEMENT (TOWER CLIMBING BOOTS) ARE REQUIRED.
O GLOVES, LEATHER – WHEN HANDLING ABRASIVE MATERIALS, WIRE
ROPE, BRAIDED FLEXIBLE HOSES, OR MATERIALS PRONE TO SHARP
EDGES OR SPLINTERING. REQUIRED WHEN CLIMBING TOWERS.
O EYE/FACE PROTECTION - GOGGLES/SAFETY GLASSES, IMPACT
RESISTANT, WRAP-AROUND TYPE OR WITH SIDE SHIELDS – WHEN
OPERATING VALVES OR COMPONENTS UNDER PRESSURE (NON-
CRYOGENIC, NON-CAUSTIC FLUIDS), WHEN DISCONNECTING LINES OR
COMPONENTS, WHEN VENTING SYSTEMS (EXCEPT WHERE VENT SYSTEM
IS DESIGNED TO RELEASE FLUIDS AWAY FROM ALL PERSONNEL) AND
IN AREAS OR OPERATIONS INVOLVING HAZARDS TO THE EYE/FACE
FROM BLOWN PARTICULATE MATERIALS.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
O SAFETY GLASSES - WHEN TOWER REPAIR OPERATIONS CREATE LOOSE
DEBRIS.
O HARDHAT WITH CHIN STRAP – ANY TIME THERE IS A HAZARD TO THE
HEAD FROM FALLING DEBRIS, SUCH AS WHEN A TASK IS BEING
PERFORMED WITH AN OVERHEAD, OPEN-TYPE STRUCTURE ABOVE THE
WORK AREA OR THE WORK AREA IS CONGESTED WITH BUMPING
HAZARDS. REQUIRED WHEN CLIMBING TOWERS.
O BODY HARNESS, SUITABLE FOR POSITIONING AND WORKING ON
TOWERS, POSITIONING LANYARDS, AND SHOCK-ABSORBING LANYARDS –
REQUIRED FOR ALL TOWER CLIMBING OPERATIONS.
O TOOL TETHERS – WHEN THE POSSIBILITY EXISTS THAT PERSONNEL
INJURY OR EQUIPMENT DAMAGE COULD RESULT FROM LOSS OF OR
DROPPED TOOLS.
O RADIOS – REQUIRED FOR COMMUNICATION AT ALL TIMES WHEN
CLIMBING IS BEING PERFORMED AND VOICE COMMUNICATION IS NOT
FEASIBLE.
WHEN NOT INVOLVED IN TOWER CLIMBING OPERATIONS, PERSONNEL SHALL
WEAR PERSONAL PROTECTIVE EQUIPMENT (PPE) AS DIRECTED BY
SUPERVISION.
NON-ESSENTIAL PERSONNEL SHALL REMAIN OUTSIDE THE CONTROL AREA OF
25 FEET OR 1/3 OF TOWER HEIGHT, WHICHEVER IS GREATER. PERSONNEL
WITHIN THE CONTROL AREA OF A HAZARDOUS OPERATION SHALL WEAR PPE AS
DIRECTED BY THE OPERATIONAL SUPERVISOR, TASK LEADER, OR SAFETY
REPRESENTATIVE. IF THE OPERATION REQUIRES SPECIALIZED PPE,
OBSERVERS WITHIN THE CONTROLLED AREA MUST ALSO WEAR THAT EQUIPMENT
AND BE TRAINED/CERTIFIED IN ITS USE.
3.2.2 NONPERSONAL PROTECTIVE EQUIPMENT
O BARRICADE EQUIPMENT
O SIGNS: “CAUTION” AND “WARNING”
O TAGS: “LOCKOUT/TAGOUT”
4.0 SUPPORT REQUIREMENTS
4.1 ESSENTIAL PERSONNEL
NOTE
SUPERVISION WILL ENSURE THAT PERSONNEL ARE
PROPERLY TRAINED AND QUALIFIED AND THAT ONLY
PROPERLY TRAINED AND QUALIFIED PERSONNEL
PARTICIPATE IN POTENTIALLY HAZARDOUS
OPERATIONS. SUPERVISION IS RESPONSIBLE FOR THE
SAFETY OF BOTH PERSONNEL AND EQUIPMENT AND
SHALL ENSURE OPERATIONS ARE PERFORMED SAFELY
ACCORDING TO APPROVED PROCEDURES.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
ESTABLISHING THE NUMBER OF ESSENTIAL PERSONNEL
IS THE RESPONSIBILITY OF SUPERVISION. THE
MAXIMUM NUMBER OF PERSONNEL AUTHORIZED IN THE
CONTROL AREA ARE THOSE LISTED AS OPERATING
PERSONNEL AND MONITORING PERSONNEL. ANY
INCREASE IN THIS NUMBER MUST BE APPROVED PRIOR
TO THE START OF THE OPERATION BY BOTH
TECHNICAL OPERATIONS AND THE APPROPRIATE
SAFETY REPRESENTATIVE/OFFICE.
4.1.1 OPERATING PERSONNEL
O TWO (2) PERSONNEL, MINIMUM
O ELECTRICIANS/MECHANICS/TECHNICIANS/MILLWRIGHTS/PAINTERS/
LABORERS/EQUIPMENT OPERATORS - AS REQUIRED.
O SUPERVISOR/LEAD/ENGINEER - AS REQUIRED
O AS A MINIMUM, TWO OF THE PERSONNEL CITED IN THIS SECTION
MUST BE QUALIFIED AND CERTIFIED FOR TOWER CLIMBING WORK IN
ACCORDANCE WITH TET-P-0200, EMPLOYEE TRAINING CERTIFICATION,
AS MAINTAINED IN ELECTRONIC MEDIA.
O HAZARDOUS OPERATIONS REQUIRE THE USE OF THE BUDDY SYSTEM.
THE BUDDY SYSTEM REQUIRES TWO PEOPLE BE DESIGNATED TO BE
CONCERNED WITH EACH OTHER’S SAFETY IN A HAZARDOUS SITUATION.
THE SECOND PERSON MAY BE AN OPERATOR OF OTHER EQUIPMENT,
DESIGNATED MONITOR, SUPERVISOR, OR OTHER IDENTIFIED PERSON
WHO ACKNOWLEDGES HIS “BUDDY” RESPONSIBILITIES AND IS IN BOTH
VISUAL CONTACT AND IN PROXIMITY TO ALLOW EACH TO HELP THE
OTHER IN AN EMERGENCY.
4.1.2 MONITORING PERSONNEL
O SUPERVISORY – 1 (OPTIONAL)
O ENGINEER - 1 (OPTIONAL)
O CERTIFIED CLIMBER ON GROUND – (OPTIONAL WHEN INSPECTION ONLY
IS BEING PERFORMED, REQUIRED FOR REPAIR WORK)
O SGS SAFETY - 1 (OPTIONAL)
4.2 OPERATING EQUIPMENT AND MATERIALS
O CHIPPING HAMMER
O PERSONNEL LIFT
O CAMERA
O TOWER RESCUE ROPE AND EQUIPMENT KIT
O TENSIONMETER
O DYNAMOMETER
O COME-A-LONG
O MEASURING INSTRUMENTS (TAPES, CALIPERS)
O SURVEY INSTRUMENTS
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
4.3 OPERATING ORGANIZATION INSTRUCTIONS
O FOR HAZARDOUS OPERATIONS, NON-ROUTINE OPERATIONS, OR
OPERATIONS THAT INVOLVE FLIGHT HARDWARE, ENSURE THAT A PRE-
OPERATIONS BRIEFING HAS BEEN PERFORMED WITH OPERATING
MECHANICS/TECHNICIANS. ALSO, ASSURE THAT THE REQUIRED
CLOSEOUT DOCUMENTATION IS COMPLETED AND SIGNED/INITIALED.
FOR ROUTINE NONHAZARDOUS INDUSTRIAL OPERATIONS, VERIFY A
BRIEFING HAS BEEN GIVEN AT LEAST ONCE PER SHIFT BY
SUPERVISION OR DESIGNATED PERSONNEL THAT DISCUSSES
OBJECTIVES OF TASKS TO BE PERFORMED, SAFETY ASPECTS OF EACH,
POTENTIAL HAZARDS, OUTAGES AND LOCKOUT/TAGOUT REQUIREMENTS,
COMMUNICATION MEANS/INTERFACES, AND CONTINGENCY RESPONSES.
O A PRE-TASK BRIEFING AND WALKDOWN SHALL BE CONDUCTED EACH DAY
WITH ALL WORKERS INVOLVED FOR TOWER REPAIR OPERATIONS.
DOCUMENTATION OF BRIEFING IS NOT REQUIRED.
O A SAFETY REPRESENTATIVE IS NOT REQUIRED FOR SAFETY
SURVEILLANCE OF THIS OPERATION.
O REPORT EQUIPMENT/SYSTEM FAILURES OR ANOMALIES ACCORDING TO
OSH-P-0106, MISHAP REPORTING AND INVESTIGATION.
O MEASURING AND MONITORING DEVICES USED TO DEMONSTRATE
CONFORMANCE OF PRODUCTS AND/OR SERVICE TO SPECIFIED
REQUIREMENTS SHALL BE IN CURRENT CALIBRATION. FIELD
CALIBRATION METHODS MAY BE USED IF APPROVED BY SIGNATURE OF
A PROFESSIONAL ENGINEER.
4.4 QUALITY INSPECTION REQUIREMENTS
NOT APPLICABLE
4.5 TOWER INSPECTION REQUIREMENTS
O AFTER TOWER REPAIRS AND MODIFICATIONS HAVE BEEN COMPLETED,
ENGINEER SHALL PERFORM FINAL CLIMBING INSPECTION FOR
APPROVAL OF COMPLETED WORK.
5.0 PRE-OPERATIONS INSTRUCTIONS
5.1 PREPARATIONS
O OBTAIN COPIES OF FAM-F-0185 AND FAM-F-0190.
O ENSURE A PRE-OPERATIONAL INSPECTION AND/OR AN OPERATIONAL
SAFETY INSPECTION FOR ALL HAZARDOUS OPERATIONS OF THE AREA
HAS BEEN PERFORMED.
O VERIFY THE REQUIRED PERSONNEL ARE CERTIFIED, EQUIPPED,
BRIEFED, AND READY TO PROCEED.
O VERIFY SPECIFIED SAFETY EQUIPMENT IS AVAILABLE AND
OPERATIONAL BY CHECKING DATE OF INSPECTION TAG AND BY
PERFORMING VISUAL INSPECTIONS BEFORE EACH USE.
O VERIFY ALL PERSONNEL INVOLVED IN THE OPERATION ARE WEARING
SPECIFIED PPE.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
O ENSURE THAT ALL PERSONNEL ARE FAMILIAR WITH THE WORK SITE.
O WHERE EQUIPMENT IS TO BE TRANSPORTED AND THE EQUIPMENT
PRESENTS LENGTH, HEIGHT, OR WIDTH INTERFERENCE CONCERNS,
VERIFY A PRE-ROUTE SURVEY HAS BEEN PERFORMED AND THAT NO
INTERFERENCE PROBLEMS OR HAZARDS EXIST ENROUTE TO
DESTINATION.
O AREA SUPERVISOR, OR OPERATING PERSONNEL SHALL ESTABLISH A
CONTROL AREA OF 25 FEET OR 1/3 OF TOWER HEIGHT, WHICHEVER IS
GREATER, AND CLEAR IT OF NONESSENTIAL PERSONNEL.
5.2 NOTIFICATIONS
THE FOLLOWING SUPPORT AGENCIES SHALL BE NOTIFIED PRIOR TO
OPERATIONS AS INDICATED:
O DUTY OFFICE (WHICH NOTIFIES FIRE/RESCUE) – NOTIFICATION IS
REQUIRED AND PRESENCE IS OPTIONAL.
O SGS SAFETY - NOTIFICATION IS REQUIRED AND PRESENCE IS
OPTIONAL.
O IF RADIATION HAZARDS ARE SUSPECTED/UNKNOWN, OBTAIN OUTAGE,
THAT WILL NOTIFY ALL USERS (SOME TOWERS HAVE 30 PLUS USERS),
AND LOCK OUT AND TAG OUT ALL ELECTRICAL SUPPLIES TO TOWER
BEFORE STARTING TOWER CLIMBING OPERATIONS. WHERE POWERFUL
TRANSMITTERS ARE PRESENT, SUCH AS MALABAR TRANSMITTER ANNEX,
ADJACENT TOWER TRANSMITTERS SHALL ALSO BE SHUT DOWN (LOCKED
OUT TAGGED OUT). CHECK WITH SITE MANAGER. WHEN IN
QUESTION, LOCK IT OUT AND TAG IT OUT!
5.3 GENERAL WARNINGS, CAUTIONS, AND NOTES
CAUTION
CALL CAPE WEATHER OFFICE TO VERIFY THAT NO
ELECTRICAL STORMS ARE WITHIN 5 MILES OF TOWER
SITE. WHEN LIGHTNING PROTECTION PLAN (LPP),
PHASE II, IS INITIATED DURING AN OPERATION,
STOP OPERATION AND SEEK SHELTER IMMEDIATELY
UNTIL THE LPP HAS BEEN TERMINATED.
WHEN WORKING AT HEIGHTS, WEAR APPROVED BODY
HARNESS WITH SHOCK-ABSORBING LANYARD ATTACHED
TO A SUBSTANTIAL STRUCTURAL MEMBER (HANDRAIL
IS NOT AN ACCEPTABLE ATTACHMENT POINT).
USE TOOL TETHERS.
ESTABLISH AND MAINTAIN A CONTROLLED AREA
AROUND OPERATION, USING WARNING SIGNS, CONES,
ROPES OR BARRICADES. CLEAR ALL NONESSENTIAL
PERSONNEL FROM THE AREA.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
BEFORE WORKING ON MOVING PARTS/ELECTRICAL
EQUIPMENT, LOCK DISCONNECTS/CIRCUIT BREAKERS
IN THE "OFF" POSITION AND PLACE "DANGER" -
LOCKOUT/TAGOUT" TAG, KSC FORM 20-195, ON THEM
UNLESS WORK INVOLVED IS AN OPERATIONAL CHECK.
PERFORM LOCKOUT/TAGOUT ACCORDING TO
OSH-P-0201.
ONLY CERTIFIED/AUTHORIZED PERSONNEL,
EXPERIENCED IN CLIMBING AND TOWER ADJUSTMENTS,
SHALL PERFORM GROUND AND AERIAL PROCEDURES.
6.0 INSPECTION AND MAINTENANCE PROCEDURES
1. INSPECT ALL HARNESSES, FALL-PROTECTION ACCESSORIES, METHOD
OF SECURING RADIOS, METHOD OF SECURING TOOLS, ETC.
WARNING
HAZARDOUS STEPS FOLLOW (WORKING AT UNPROTECTED
HEIGHTS; WORKING NEAR RADIO AND MICROWAVE
TRANSMITTER RADIATION SOURCES; WORKING NEAR
ELECTRICAL POWER SYSTEMS; WORKING AROUND
DAMAGED AND/OR CORRODED STRUCTURAL MEMBERS
THAT CAN BREAK AND FALL; WORKING AROUND GUY
CABLES THAT CAN BREAK AND RELEASE STORED
ENERGY; WORKING AROUND TRIPPING HAZARDS;
WORKING UNDER TOOLS THAT CAN FALL IF DAMAGED
TETHER LINES BREAK; WORKING AROUND SHARP EDGES
THAT CAN CAUSE CUTS AND SCRATCHES; WORKING
AROUND LOOSE COATINGS AND CORRODED SURFACES
THAT COULD CAUSE DEBRIS TO ENTER EYES).
2. VERIFY THAT APPLICABLE PRE-OPERATIONS INSTRUCTIONS PER
SECTION 5.0 HAVE BEEN IMPLEMENTED.
H 3. IF RADIATION HAZARDS ARE SUSPECTED/UNKNOWN, OBTAIN OUTAGE,
THAT WILL NOTIFY ALL USERS (SOME TOWERS HAVE 30 PLUS USERS),
AND LOCK OUT AND TAG OUT ALL ELECTRICAL SUPPLIES TO TOWER
BEFORE STARTING TOWER CLIMBING OPERATIONS. WHERE POWERFUL
TRANSMITTERS ARE PRESENT, SUCH AS MALABAR TRANSMITTER ANNEX,
ADJACENT TOWER TRANSMITTERS SHALL ALSO BE SHUT DOWN (LOCKED
OUT TAGGED OUT). CHECK WITH SITE MANAGER. WHEN IN
QUESTION, LOCK IT OUT AND TAG IT OUT!
H 4. AT THE BEGINNING OF EACH DAY AN INSPECTION IS TO BE
PERFORMED, VISUALLY INSPECT, USING BINOCULARS OR SURVEY
INSTRUMENTS, (WALK-AROUND FROM THE GROUND) THE TOWER
STRUCTURE, GUY CABLE ASSEMBLIES, ALL GUY CONNECTION
HARDWARE, ALL CONNECTION SAFETY PINS, ALL CONNECTION SAFETY
WIRES, AND GUY ANCHORS. CHECK FOR VEHICLE IMPACT DAMAGE,
CORROSION DAMAGE, LOOSE GUY CABLES, TOWER STRUCTURES THAT
ARE OUT OF ALIGNMENT, MISSING CONNECTION HARDWARE COTTER
PINS, ETC.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
H 5. SET UP WARNING SIGNS AND CONES TO RESTRICT ACCESS TO AREA.
FORM NUMBER FAM-F-0185 AND FAM-F-0190 SHOULD
BE COMPLETED WHILE PERFORMING THE STEPS IN
THIS PROCEDURE.
6.1 GUYED AND SELF-SUPPORTING TOWERS
A SAFETY REPRESENTATIVE IS NOT REQUIRED FOR
SAFETY SURVEILLANCE OF THE FOLLOWING
OPERATION.
H 1. NOTE THE FOLLOWING TOWER CONDITIONS.
A. TOWER MEMBERS
O BENT MEMBERS (LEGS AND LACING)
O LOOSE MEMBERS
O MISSING MEMBERS
O CORROSION DAMAGE TO MEMBERS
O SECURENESS OF LADDERS, FALL-PROTECTION SYSTEM,
PLATFORMS, CATWALKS, ETC.
O TYPE OF FALL-PROTECTION SYSTEM
O LOOSE, MISSING, OR CORRODED BOLTS
B. FINISH
O PAINT AND/OR GALVANIZING CONDITION
O RUST AND/OR CORROSION CONDITIONS
O FEDERAL AVIATION ADMINISTRATION (FAA) OR
INTERNATIONAL CIVIL AVIATION ORGANIZATION (ICAO)
COLOR MARKING CONDITIONS
O WATER COLLECTION IN MEMBERS (TO BE REMEDIED,
E.G., UNPLUG DRAIN HOLES, ETC.)
C. WARNING LIGHTS
O CONDUIT, JUNCTION BOXES, AND FASTENERS WEATHER
TIGHT AND SECURE
O CONDUIT CONNECTED TO TOWER AT A MAXIMUM SPACING
OF 6 FEET ON CENTER AND ABOVE AND BELOW EACH
JUNCTION BOX
O DRAINS AND VENTS OPEN WITH INSECT SCREENS IN
PLACE
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
O WIRING CONDITION
O CONTROLLERS FUNCTIONING
1) FLASHER
2) PHOTO CONTROL
3) ALARMS
O LIGHT LENSES
O BULB CONDITION (OPTION: CHANGE ALL BULBS DURING
INSPECTION)
D. GROUNDING
O CONNECTIONS CHECKED AND SECURE
O OPEN GROUNDING CONNECTIONS ON GUY CABLES AND
CHECK FOR CORROSION OR OTHER DAMAGE TO GUY
CABLE. CLEAN AND GREASE FITTINGS BEFORE RE-
CONNECTING TO GUY CABLES.
O LIGHTNING PROTECTION SECURE (AS REQUIRED)
O CONTINUITY OF GROUNDS (REFER TO ELECTRICAL
GROUNDING OMI Q6842)
O DOWN CONDUCTOR RUNS SHOULD BE CONNECTED TO TOWER
AT A MAXIMUM SPACING OF 3 FEET ON CENTER
E. TOWER BASE FOUNDATION
O GROUND CONDITIONS
1) SETTLEMENTS OR MOVEMENTS
2) EROSION
3) SITE CONDITION (STANDING WATER, DRAINAGE,
TREES, VEGETATION IN CONTACT WITH TOWER,
ETC.)
O BASE CONDITION
1) NUTS AND LOCK NUTS TIGHT
2) GROUT CONDITION
O CONCRETE CONDITION
1) CRACKING, SPALLING, OR SPLITTING
2) CHIPPED OR BROKEN CONCRETE
3) HONEYCOMBING
4) LOW SPOTS TO COLLECT MOISTURE
5) ANCHOR-BOLT CORROSION
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
F. TOWER ASSEMBLY PROFILE (SEE FIGURES 1 THROUGH 4)
O OPTIONAL APPURTENANCES (WALKWAYS, PLATFORMS,
LADDERS, FALL-PROTECTION SYSTEM, SENSORS,
FLOODLIGHTS, AIRCRAFT WARNING LIGHT SYSTEM,
GROUNDING SYSTEM, ETC.)
1) ELEVATION
2) ARRANGEMENT
3) DRAWINGS OR SKETCHES
G. TOWER ALIGNMENT (SEE FIGURES 3 AND 4)
O TOWER PLUMB – THE HORIZONTAL DISTANCE BETWEEN
THE VERTICAL CENTERLINES AT ANY TWO ELEVATIONS
SHALL NOT EXCEED 0.25 PERCENT OF THE VERTICAL
DISTANCE BETWEEN THE TWO ELEVATIONS.
O TOWER TWIST – THE TWIST (ANGULAR ROTATION IN THE
HORIZONTAL PLANE) BETWEEN ANY TWO ELEVATIONS
SHALL NOT EXCEED 0.5 DEGREES IN 10 FEET AND THE
TOTAL TWIST IN THE STRUCTURE SHALL NOT EXCEED 5
DEGREES. IF EXCESSIVE TOWER TWIST IS SUSPECTED,
HAVE SGS SURVEY CREW DETERMINE DEGREE OF TWIST.
6.2 GUYED TOWERS
A SAFETY REPRESENTATIVE IS NOT REQUIRED FOR
SAFETY SURVEILLANCE OF THE FOLLOWING
OPERATION.
H 1. NOTE THE FOLLOWING TOWER CONDITIONS
A. ANCHORS
O SETTLEMENT, MOVEMENT OR EARTH CRACKS
O BACKFILL HEAPED OVER CONCRETE FOR WATER SHEDDING
O WATER PONDING AT ANCHOR
O ANCHOR ROD CONDITION BELOW EARTH AND ABOVE
EARTH. MAINTAIN REQUIRED STRUCTURAL CAPACITY OF
ANCHOR DURING EXPLORATION, INSPECTION AND
MAINTENANCE. EXCAVATE 2 FEET DEEP AND CHECK FOR
CORROSION DAMAGE.
O CORROSION CONTROL MEASURES (GALVANIZING,
COATINGS, CONCRETE ENCASEMENT, CATHODIC
PROTECTION SYSTEMS, ETC.)
O GROUNDING
1) CONNECTIONS CHECKED AND SECURE
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
2) OPEN GROUNDING CONNECTIONS ON GUY CABLES
AND CHECK FOR CORROSION OR OTHER DAMAGE TO
GUY CABLE
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
3) PERFORM GROUNDING CHECKS PER OMI Q6842
O ANCHOR HEAD CLEAR OF EARTH
B. TOWER GUYS (SEE FIGURES 1 THROUGH 5)
O STRAND
1) TYPE (1X7 EHS, 1X19 BRIDGE STRAND,
GALVANIZED, ALUMOWELD, STAINLESS STEEL,
ETC.)
2) SIZE
3) BREAKING STRENGTH
4) ELEVATION
5) CONDITION (CORROSION, BROKEN STRANDS,
NICKS, KINKS, ETC.)
O GUY HARDWARE
1) TURNBUCKLES (OR EQUIVALENT) SECURE WITH
FIGURE-8 SAFETY CABLES PROPERLY APPLIED
2) CABLE THIMBLES PROPERLY IN PLACE (IF
REQUIRED)
3) CABLE CONNECTORS (END FITTINGS)
O CABLE CLAMPS APPLIED PROPERLY
(NUMBER AND SPACING) AND BOLTS TIGHT
O PERFORMED WRAPS PROPERLY APPLIED,
FULLY WRAPPED
O WIRE SERVING PROPERLY APPLIED
O STRANDVICES SECURE
O POURED SOCKETS SECURE AND SHOWING NO
SEPARATION (NOTE: CONNECTORS SHOULD
SHOW NO SIGNS OF DAMAGED CABLE OR
SLIPPAGE)
O SHACKLES, BOLTS, PINS AND COTTER
PINS SECURE AND IN GOOD CONDITION
ALL SECURED WITH COTTER PINS, SAFETY
WIRE, PEENED THREADS, ETC.
O GUY TENSIONS
1) TENSION SHOULD BE COMPARED TO DESIGN
REQUIREMENTS, IF AVAILABLE, OTHERWISE
TENSION SHOULD 8% OF BREAKING STRENGTH
MINIMUM, 10% OF BREAKING STRENGTH IDEAL,
AND 15% OF BREAKING STRENGTH MAXIMUM.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
2) TENSIONS SHALL BE CHECKED WITH TENSIOMETER
INSTRUMENT OR DYNAMOMETERS.
3) RECORD TENSIONS AND WIND AND TEMPERATURE
CONDITIONS ON ATTACHED FIGURES (SEE
FIGURES 1 THROUGH 6)
VARIATION IN GUY TENSIONS ARE TO BE EXPECTED
DUE TO TEMPERATURE AND WIND. THESE ARE MINOR
VARIATIONS. SHOULD THERE BE SIGNIFICANT
TENSION CHANGES, THE CAUSE SHOULD BE
DETERMINED IMMEDIATELY AND PROPER REMEDIAL
ACTION TAKEN. POSSIBLE CAUSES MAY BE INITIAL
CONSTRUCTION LOOSENING, EXTREME WIND, ANCHOR
MOVEMENTS, BASE SETTLEMENT, VEHICLE IMPACT
DAMAGE, OR CONNECTION SLIPPAGE.
VARIATIONS AT A SINGLE LEVEL ARE TO BE
EXPECTED BECAUSE OF ANCHOR ELEVATION
DIFFERENCES, CONSTRUCTION DEVIATIONS AND WIND
EFFECTS.
C. INSULATORS IN GUY CABLE ASSEMBLIES
O INSULATOR CONDITION
1) CRACKING AND CHIPPING
2) CLEANLINESS OF INSULATORS
3) BOLTS AND CONNECTIONS SECURE
4) MANUFACTURER TYPE AND PART NUMBERS FOR
FUTURE REPLACEMENTS
HAZARDOUS STEPS COMPLETE
7.0 POST-OPERATIONS INSTRUCTIONS
O AFTER TOWER REPAIRS AND MODIFICATIONS HAVE BEEN COMPLETED,
ENGINEER SHALL PERFORM FINAL CLIMBING INSPECTION FOR
APPROVAL OF COMPLETED WORK.
O NOTIFY SUPERVISION OF ALL DEFICIENCIES NOT CORRECTED AND
ENSURE THEY ARE LISTED ON THE PM WORK ORDER.
O ENSURE WORK AREA IS CLEANED OF ALL DEBRIS PRIOR TO LEAVING
SITE.
O NOTIFY CAPE SUPPORT (DUTY OFFICE) AS SOON AS TOWER CLIMBING
OPERATIONS HAVE BEEN COMPLETED.
O REMOVE BARRICADES, CONES, WARNING SIGNS, ETC..
O MAINTAIN EQUIPMENT LOGBOOK.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
SHOW THE FOLLOWING ON CHECKLIST FAM-F-0190:
- TOWER HEIGHT ABOVE GROUND
- FACE WIDTH OF TOWER
- VERTICAL ARRANGEMENT OF GUYS
- TYPE OF FALL PROTECTION SYSTEM
- LOCATIONS OF GROUNDING RUNS AND AIRCRAFT WARNING LIGHT CONDUIT RUNS
- TYPE OF TOWER STRUCTURAL MATERIAL
- LOCATION OF PLATFORMS, LADDERS, ETC.
Elevation
Grounding Run
Grounding Run
Air Craft Warning Light Conduit Run
Fall Protection Rail
Ladder
Plan
Grounding Run
Grounding Run
Air Craft Warning Light Conduit Run
Fall Protection Rail
Ladder
Plan
FIGURE 1: TOWER GEOMETRY
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
- TOWER LAYOUT RELATIVE TO NORTHERN DIRECTION AND INDICATE NORTH
- HORIZONTAL ARRANGEMENT OF GUYS
- ACCESS ROADS AND BUILDINGS
- ANCHORS AND ASSIGN LETTER DIRECTION DESIGNATION
- POWER LINES, POLES, AND FENCES
- TRANSIT LOCATIONS #1 AND #2
CD
BA
BLDG
Pole Line
Access Road
Guy
N
Transit # 1
Transit # 2
A
C B
Guy
Transit #2
Transit #1 x x x x x x
Fence
FIGURE 2: TOWER PLOT PLAN
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
CHECK WITH TRANSIT. TWO TRANSIT SETUPS ARE REQUIRED. LINE TRANSIT PARALLEL TO
ONE FACE AND CENTER ON LEG. SECOND SETUP SHOULD BE AT 900 ON SAME LEG. SHOW
ON SKETCH ON FIGURE 2 THE LOCATIONS USED FOR TRANSIT SETUP.
RECORD APPROXIMATE WIND SPEED AND TEMPERATURE DURING MEASUREMENTS
MPH DEGREES F
NOTE: THIS PROCEDURE IS NOT SUFFICIENT TO DETERMINE BOTH TWIST AND OUT OF
PLUMB.
FIGURE 3: TOWER LEG VERTICAL ALIGNMENT
Guy Transit #1
Tower Lays Transit #2
Tower Lays Elevations Level Left O Right Left O Right
_______ ft 10 (top) _______ _______ _______ _______ _______ _______
_______ ft 9 _______ _______ _______ _______ _______ _______
_______ ft 8 _______ _______ _______ _______ _______ _______
_______ ft 7 _______ _______ _______ _______ _______ _______
_______ ft 6 _______ _______ _______ _______ _______ _______
_______ ft 5 _______ _______ _______ _______ _______ _______
_______ ft 4 _______ _______ _______ _______ _______ _______
_______ ft 3 _______ _______ _______ _______ _______ _______
_______ ft 2 _______ _______ _______ _______ _______ _______
_______ ft 1 (bottom) _______ _______ _______ _______ _______ _______
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Guy Anchors Level A B C D
10 (top) _______ _______ _______ _______
9 _______ _______ _______ _______
8 _______ _______ _______ _______
7 _______ _______ _______ _______
6 _______ _______ _______ _______
5 _______ _______ _______ _______
4 _______ _______ _______ _______
3 _______ _______ _______ _______
2 _______ _______ _______ _______
1 (bottom) _______ _______ _______ _______
FIGURE 4: DISTANCE OF EACH GUY ANCHOR FROM CENTER OF TOWER
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Guy Leg B
Guy Leg C
Guy Leg A
No.
Guy Size
Guy Tension
Guy Material
Guy Size
Guy Tension
Guy Material
Guy No.
Guy Size
Guy Tension
Guy Material
FIGURE 5: 3-WAY GUYED TOWER CABLE GUY DATA
Guy Leg A
Guy Leg C Guy Leg B
1) Take 7 tensiometer readings on each guy.
2) Drop high and low readings and calculate average.
3) Determine guy tension from calibrated charts.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Guy Size
Guy Tension
Guy Material
Guy No.
Guy Size
Guy Tension
Guy Material
FIGURE 6: 4-WAY GUYED TOWER CABLE GUY DATA
(PAGE 1 OF 2)
Guy Leg C
Guy Leg B
Guy Leg D
Guy Leg A
Guy Leg A Guy Leg B
1) Take 7 tensiometer readings on each guy.
2) Drop high and low readings and calculate average.
3) Determine guy tension from calibrated charts.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Guy Size
Guy Tension
Guy Material
Guy No.
Guy Size
Guy Tension
Guy Material
FIGURE 6 CONTINUED: 4-WAY GUYED TOWER CABLE GUY DATA
(PAGE 2 OF 2)
Guy Leg C Guy Leg D
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
THIS PAGE INTENTIONALLY BLANK
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
A-1
APPENDIX A
FORM FAM-F-0185
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
A-2
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-1
APPENDIX B
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-2
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-3
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-4
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-5
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-6
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-7
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-8
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-9
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-10
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-11
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
B-12
THIS PAGE INTENTIONALLY BLANK
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Z-1
APPENDIX Z
EMERGENCY INSTRUCTIONS
1.0 FIRE
1. EVACUATE NONESSENTIAL PERSONNEL.
2. TERMINATE OPERATIONS, IF THIS CAN BE ACCOMPLISHED SAFELY.
3. IF FIRE DEPARTMENT IS NOT ON-SITE, NOTIFY THE APPROPRIATE
CONTROL CENTER (PHONE 911. IF USING A CELL PHONE,
867-7911.).
4. ASSIST FIRE DEPARTMENT PERSONNEL AS REQUESTED BY THE FIRE
CHIEF.
5. NOTIFY SUPERVISION AND PROCEED AS DIRECTED.
2.0 VEHICLE ACCIDENT
1. NOTIFY THE APPROPRIATE CONTROL CENTER (PHONE 911. IF USING A
CELL PHONE, 867-7911.) AND ASK FOR FIRE SUPPORT AND SECURITY
ROADBLOCKS.
2. NOTIFY SUPERVISION AND PROCEED AS DIRECTED.
3.0 PERSONNEL INJURY
1. IMMEDIATELY TURN OFF ALL POWER AND, IF NECESSARY, REMOVE
VICTIM TO ADMINISTER FIRST AID.
2. IF BREATHING HAS STOPPED, ADMINISTER CPR (IF CERTIFIED TO DO
SO) UNTIL VOLUNTARY RESPIRATION RESUMES OR MEDICAL HELP
ARRIVES.
3. ADMINISTER FIRST AID AS REQUIRED TO STOP BLEEDING.
4. NOTIFY THE APPROPRIATE CONTROL CENTER (PHONE 911. IF USING A
CELL PHONE, 867-7911.) AND REQUEST FIRE, AMBULANCE, OR
SECURITY AS NEEDED.
5. NOTIFY SUPERVISION AND PROCEED AS DIRECTED.
4.0 PERSONNEL INJURY WHILE WORKING AT HEIGHTS
1. NOTIFY THE APPROPRIATE CONTROL CENTER (PHONE 911. IF USING A
CELL PHONE, 867-7911.) AND REQUEST FIRE, AMBULANCE, OR
SECURITY AS NEEDED.
2. START CLIMBING PROCESS WITH RESCUE EQUIPMENT REQUIRED TO
REMOVE INJURED PERSON IN ACCORDANCE WITH METHODS AND
PROCEDURES TAUGHT IN TOWER RESCUE TRAINING.
3. EVALUATE INJURY AND COMPLY WITH PART 3.0 “PERSONAL INJURY”.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
Z-2
4. ALLOW FIRE/RESCUE TO TAKE CHARGE OF RESCUE OPERATIONS AS
SOON AS THEY ARRIVE ON SITE IF THEY CHOOSE TO DO SO.
5. REMOVE INJURED PERSON IN ACCORDANCE WITH METHODS AND
PROCEDURES TAUGHT IN TOWER RESCUE TRAINING.
6. IF INJURED PERSON HAS BEEN HANGING IMMOBILE IN FALL-
PROTECTION HARNESS FOR MORE THAN FIVE MINUTES, KEEP INJURED
PERSON IN A SITTING POSITION. DO NOT ALLOW INJURED PERSON
TO LAY FLAT ON THEIR BACK.
7. NOTIFY SUPERVISION AND PROCEED AS DIRECTED.
END OF OMI
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.
OMI Q6880 - TOWER INSPECTION AND REPAIR, CCAFS, KSC, PAFB, AND AIR FORCE
MAINLAND SITES
USERS OF RECORD:
RPI-036/TECHNICAL DOCUMENTATION
SGS-6000/J. D. SCHILLING
INDICATED USERS ARE RESPONSIBLE FOR ENSURING CURRENT PUBLISHED COPIES ARE
USED. CURRENT REVISIONS CAN BE VERIFIED USING THE ONLINE TECHNICAL
DOCUMENTATION SYSTEM AVAILABLE VIA THE SGS HOME PAGE.
RELEASED - Printed documents may be obsolete; validate prior to use.RELEASED - Printed documents may be obsolete; validate prior to use.