Questions and answers for Multi‐wide Modular Office

1. The SOW states central HVAC, however the floorplan reflects wall mounted HVAC's (ie Bard units), will Bard units be acceptable? Bard units are acceptable.

2. The SOW calls for walls to be standard sheetrock/gypsum, does this mean tape, bed, textured walls or will Vinyl Covered Gypsum be acceptable? Vinyl covered gyp is acceptable.

3. Will the ADA ramp and stairs need to be wood or metal? Either is acceptable.

4. The SOW is requesting standard drip rail guttering, is this similar to an RV drip gutter, or a residential type rain gutter that you would see on a home? Prefer residential 'k' gutter is preferred.

5. The SOW is requesting a breakroom/kitchen with running water/sink, however the floorplan reflects a counter and sink outside of the restroom. Are you wanting a room separately for a breakroom?

Breakroom (area) as shown on sketch is acceptable.

6. The SOW is calling for CAT6 cabling, will this be standard CAT6, plenum rated CAT6, or CAT6e cabling?

Standard CAT6

7. How many phone and data drops is needed in each of the offices? Two per office.

8. Is the ceramic tile required just in the restrooms, or throughout the building? Can we provide you with an alternative for VCT? Ceramic tile is required throughout. Due to the high traffic use of this facility, I do not want VCT.

9. SOW states interior doors are 32" X 80". Pretty sure they will not meet ADA. 32x80 is the minimum.

The individual offices do not have to be ADA compliant due to the waiting area/reception area. The two restrooms, however, will need to be ADA compliant.

10. SOW states kitchen area has sink. Drawings show sink is in a kitchen counter. Will there be any cabinets or other millwork? Kitchen will come with cabinets that run the entire length of the wall the sink will be on (top and bottom).

11. Where is the exact location of the proposed building site? MAP HAS BEEN DELIVERED. We will need to know if there is any earthwork to prepare for the building. ANG TO LEVEL IN HOUSE.

12. Will we need to connect the utilities? Water, sanitary sewer, electrical service, communications? IN

HOUSE

13. What are the specs for the floor tile? 12X12 PLATEAU MOSSDALE OR EQUIVALENT

14. What type of purchase is this? FFP. Is this a pay at the end project? CAN ALLOW PROGRESS

PAYMENTS.

15. Will there be any city permits required? NO

16. Will Bonds be required? N0

File details come from the government source that posted it. Updated .