RFI 2 Before Award Pavement Markings.pdf
PDF 162 KB Posted
- Attached to
- Maintain Pavement Markings, Airfield
- Solicitation number
- F5N3FQ0042AW02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Beta.SAM Abstract of Offerc OF 1419 TOTALS PAGE.pdf | ||
| SOW Pavement Markings 3 June 2020.doc | DOC document | |
| Amendment FA660620B00020001 SF 30.pdf | ||
| RFI 1 Before Award Pavement Markings.pdf | ||
| SOW Pav Mkings YTPM 20-3001 3.5.20.doc | DOC document | |
| 2020 Airfield Marking Overall Plan.pdf | ||
| ttb1325d.pdf | ||
| Engineering Appendix A Airfield Runway Friction Testing.docx | DOCX document | |
| KTR Bid Schedule.xlsx | XLSX spreadsheet | |
| 32 17 23 01 Airfield Pavements and Roadways Marking.docx | DOCX document | |
| 32 01 11 52 Airfield Pavements Rubber and Paint Removal.docx | DOCX document | |
| Wage Determinations 3.13.2020.pdf | ||
| ttp1952e.pdf | ||
| Solicitation - FA660620B0002 Issued.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
CONTRACT NO. CONTRACT TITLE
Maintain Pavement Markings YTPM 20-3001
PRIME CONTRACTOR
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
Question:
Response: The contractor is responsible to provide the sweeper and maintain a clean surface due to this work being performed on an active airfield surface.
All debris generated/collected shall be transported off installation in accordance with state regulations.
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
FA6606-20-B-0002
Who’s Providing the Sweeper & Dumpsite ?
Question: List of all acceptable Equipment ?
Response: See specification 32 17 23.01 Airfield Pavements and Roadways Marking for equipment requirements.
| RFI NO: | |
| PAGE NO Page 1 of 1: | |
| CONTRACT NO FA660620B0002: | |
| CONTRACT TITLE Maintain Pavement Markings YTPM 203001: | |
| PRIME CONTRACTOR: | |
| Contractors Request for Information: | |
| REQUESTED BY: | |
| DATE REQUESTED: | |
| Potential Cost Impact No Potential Schedule: | |
| SUBCONTRACTOR: | |
| RFI: | |
| DRAWINGS: | |
| INFORMATION REQUESTEDRow1: | |
| ATTACHMENTS FROM CONTRACTOR 1 attachment: | |
| Question Response The contractor is responsible to provide the sweeper and maintain a clean surface due to this work being performed on an active airfield surface All debris generatedcollected shall be transported off installation in accordance with state regulations Whos Providing the Sweeper Dumpsite Question List of all acceptable Equipment Response See specification 32 17 2301 Airfield Pavements and Roadways Marking for equipment requirements: | |
| QA REVIEWERS SIGNATURE: | |
| DATE: | |
| 2020-06-18T15:54:50-0400 | |
| OWEN.GEORGE.R.JR.1051532267 |
File details come from the government source that posted it. Updated .