REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

CONTRACT NO. CONTRACT TITLE

Maintain Pavement Markings YTPM 20-3001

PRIME CONTRACTOR

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

Question:

Response: The contractor is responsible to provide the sweeper and maintain a clean surface due to this work being performed on an active airfield surface.

All debris generated/collected shall be transported off installation in accordance with state regulations.

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

FA6606-20-B-0002

Who’s Providing the Sweeper & Dumpsite ?

Question: List of all acceptable Equipment ?

Response: See specification 32 17 23.01 Airfield Pavements and Roadways Marking for equipment requirements.

RFI NO:
PAGE NO Page 1 of 1:
CONTRACT NO FA660620B0002:
CONTRACT TITLE Maintain Pavement Markings YTPM 203001:
PRIME CONTRACTOR:
Contractors Request for Information:
REQUESTED BY:
DATE REQUESTED:
Potential Cost Impact No Potential Schedule:
SUBCONTRACTOR:
RFI:
DRAWINGS:
INFORMATION REQUESTEDRow1:
ATTACHMENTS FROM CONTRACTOR 1 attachment:
Question Response The contractor is responsible to provide the sweeper and maintain a clean surface due to this work being performed on an active airfield surface All debris generatedcollected shall be transported off installation in accordance with state regulations Whos Providing the Sweeper Dumpsite Question List of all acceptable Equipment Response See specification 32 17 2301 Airfield Pavements and Roadways Marking for equipment requirements:
QA REVIEWERS SIGNATURE:
DATE:
2020-06-18T15:54:50-0400
OWEN.GEORGE.R.JR.1051532267