Attachtment 2.docx

DOCX document 3 MB Posted

Attached to
Demolition of Two (2) Facilities
Solicitation number
F4E3Z70076A001
Issued by

About this file

Statement of Work for Option of Additional grading at Credit Union demo site.

View the file

Other files

File Type Posted
SF 30 ammendment 1.pdf PDF
FA4625-10-R-0007-U0001.pdf PDF
2010 SOW Demo CREDIT UNION revised.doc DOC document
Attachment 1.doc DOC document
Attachment 5.doc DOC document
Attachment 1.doc DOC document
FA4625-10-R-0007.doc DOC document
Attachment 3.docx DOCX document
Attachment 4.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #2 FA4625-10-R-0007

STATEMENT OF WORK

OPTION 1

YWHG 100001

1. The Contractor shall provide all tools, equipment, transportation, supervision and materials to grade (cut and fill where required) purposed road north of Arnold gate starting at the beginning of the Credit Union parking lot (South side of parking lot north of Arnold gate) running north just past the box culvert on Arnold road or, J highway. Whiteman Air Force Base (AFB), Missouri. The period of performance will be 90 days from date of award.

A. The purposed road location is depicted on the aerial photograph included in this SOW. Required after the demolition of the base credit union is the grading of the new purposed Arnold road route north of Arnold gate, elevation 820, to north of the box culvert running under Arnold road or J highway elevation 822, approximately 700 LF. Also required is the extension of the box culvert running under Arnold road or J highway just north of the existing Credit Union the required length necessary to accommodate the new purposed roadway. Bushes, vegetation and other debris that are in the footprint of this purposed road or immediate vicinity of this area must be removed. All cut material will be used as fill to extend the box culvert running under Arnold road or J highway. The entire construction site or any disturbed area shall be restored with engineered fill and graded matching that of the surrounding area ensuring that fill does not encroach onto any parking areas, access roads, utility pits, trenches, manhole covers etc. Outside the purposed road area must be seeded and mulched to an established lawn which can be mowed, matching that in the existing area or better. This facility is located north of Arnold gate, Whiteman AFB MO. 65305-5344

B. The Contractor shall be responsible to process an AF Form 103, Work Clearance Request, for all work, such as digging, that may interfere with the normal flow of traffic or disrupt utilities. The Contractor shall have a completed/approved AF Form 103 request prior to starting such work.

C All construction shall be accomplished in accordance with Whiteman AFB safety regulations, Federal, State and Local regulations, OSHA standards and local codes. The Contractor shall secure the demolition site with temporary security fencing during demolition, prior to back-fill completion. The Contractor shall fully cooperate with any other contractors and Government employees who shall require access to any or all parts of the demolition site to accomplish their work.

END OF STATEMENT OF WORK

image1.emf image2.emf

File details come from the government source that posted it. Updated .