Attachment 1.doc
DOC document 31 KB Posted
- Attached to
- Demolition of Two (2) Facilities
- Solicitation number
- F4E3Z70076A001
About this file
Statement of Work for Credit Union
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 ammendment 1.pdf | ||
| FA4625-10-R-0007-U0001.pdf | ||
| 2010 SOW Demo CREDIT UNION revised.doc | DOC document | |
| Attachment 1.doc | DOC document | |
| Attachment 5.doc | DOC document | |
| FA4625-10-R-0007.doc | DOC document | |
| Attachtment 2.docx | DOCX document | |
| Attachment 3.docx | DOCX document | |
| Attachment 4.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
FA4625-10-R-0007
STATEMENT OF WORK
DEMOLITION OF CREDIT UNION
PROJECT YWHG 100001
1. The Contractor shall provide all tools, equipment, transportation, supervision and materials to demolish the Credit Union on Whiteman Air Force Base (AFB), Missouri. The period of performance will be 90 days from date of award.
A. The Credit Union is a wood and metal framed one story building setting on a full concrete basement with metal wood and brick siding, there is a wood framed with metal siding detached garage included in this demo project. All building materials, all interior and exterior concrete slabs, basement walls, concrete side walks, and asphalt drives that service this facility will be removed, In addition to before mentioned demolition work, required is the pumping and removal of a septic tank and surrounding two foot of soil, all sewage material will be deposed of in an approved waste water treatment plant and all other material in an approved landfill. Leach field will be left or abandoned in place. This facility also has a water well that shall be plugged below finish grade in accordance with Missouri code of state regulations 10 CSR 23-3.110, (Plugging of wells) Contractor shall provide all copies of all regulatory reports, forms and correspondence to the government (Whiteman AFB). The pump house will be removed and backfilled and graded to match that of the surrounding area. The Square footage of these two facilities is approximately 8,200 SF. of Main Building and 800 SF of garage area with approximately 39000 SF of asphalt. See attached hazardous material survey which addresses all hazardous waste identified as present in this facility.
B. Prior to the Demo phase of this facility all identified hazardous material will be removed by a BCE contractor. If any other suspect material is detected Base Civil Engineering must be contacted to determine a course of action. Bushes, vegetation and other debris that are in the footprint or immediate vicinity of this facility must be removed.. All Demo material must be disposed of in an approved off base landfill. All utilities connections shall be capped at the mains and also capped at the bldg. Base CE will be responsible to shut off power to the building at the transformer. The demolition site shall be restored with engineered fill and graded matching that of the surrounding area ensuring that fill does not encroach onto any parking areas, access roads, utility pits, trenches, manhole covers etc.. Area must be seeded and mulched to an established lawn which can be mowed, matching that in the existing area or better. This facility is located north of Arnold gate, Whiteman AFB MO. 65305-5344.
C. The Contractor shall be responsible to process an AF Form 103, Work Clearance Request, for all work, such as digging, that may interfere with the normal flow of traffic or disrupt utilities. The Contractor shall have a completed/approved AF Form 103 request prior to starting such work.
D. All construction shall be accomplished in accordance with Whiteman AFB safety regulations, Federal, State and Local regulations, OSHA standards and local codes. The Contractor shall secure the demolition site with temporary security fencing during demolition, prior to back-fill completion. The Contractor shall fully cooperate with any other contractors and Government employees who shall require access to any or all parts of the demolition site to accomplish their work.
END OF STATEMENT OF WORK