Request For Information #2 (04Sept2019)

View the file

Other files for this federal contract opportunity

Other files attached to Conduct Backflow and Cross Connection Survey, newest first.
File Type Posted
Bid_Schedule_Revised_(29Aug19)_-_Blank.docx DOCX document
RFI__1_-_Cross-Connection_Survey_(29Aug2019).docx DOCX document
SCA_Wage_Determination_16July19_(_2015-4496).pdf PDF
O&M_list.xlsx XLSX spreadsheet
CSAG_list.xlsx XLSX spreadsheet
dd1423signed.pdf PDF
APPENDIX_C_-_-2020.docx DOCX document
Bid_Schedule_-_Blank.docx DOCX document
Base_Map_VCC.PDF PDF
Cross-Connection_Survey_SOW.DOCX DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Rather than being paid 30 days after completion, is it possible to receive partial payouts? This is a fairly large project.

· Yes contractor can submit invoices every month and get paid.

2) Do we need to do anything with the Contract Data Requirements Form?

· That form is for reference to whom needs a copy of the report contractor does not need to do anything on the form.

3) You say there are 722 site inspections to be completed. However, the pricing page has us give pricing breakdowns: CSAG (which has 150 sites) as what appears to be the base bid, plus the O & M list, which has been filtered to include 573 sites and is an "Option."

· Yes base bid is the CSAG facilities, O&M will be an option (CSAG facility buildings we are pretty sure on the number we provided, O&M total number of buildings can vary).

4) You are looking for a 'price each' quotation only, correct?

· We are looking for a price per each building.

5) Are we simply completing the Bidding Schedule and emailing that quotation to you?

· Yes