Cross-Connection_Survey_SOW.DOCX
DOCX document 22 KB Posted
- Attached to
- Conduct Backflow and Cross Connection Survey Federal contract opportunity
- Solicitation number
- F3QCCL9199A003
About this file
Cross-Connection Survey SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI__2_-_Cross-Connection_Survey_(04Sept2019).docx | DOCX document | |
| RFI__1_-_Cross-Connection_Survey_(29Aug2019).docx | DOCX document | |
| Bid_Schedule_Revised_(29Aug19)_-_Blank.docx | DOCX document | |
| SCA_Wage_Determination_16July19_(_2015-4496).pdf | ||
| O&M_list.xlsx | XLSX spreadsheet | |
| CSAG_list.xlsx | XLSX spreadsheet | |
| dd1423signed.pdf | ||
| APPENDIX_C_-_-2020.docx | DOCX document | |
| Bid_Schedule_-_Blank.docx | DOCX document | |
| Base_Map_VCC.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross-Connection Survey for Robins AFB Scope of Work Projects: 1074042 & 1080413
1.0 INTRODUCTION
The Contractor shall accomplish activities necessary to support the Robins AFB Cross-Connection Control and Backflow Prevention Program. The primary goal of this project is to assist the base in complying with Air Force Instruction 32-1067, Civil Engineering Water and Fuel Systems (4 February 2015), requirement to conduct a cross-connection survey every five (5) years. Specific tasks objectives are as follows:
1. Conduct a cross-connection control survey of all water-using facilities.
| A. Walk-thru of each building, catalog existing devices, note non-compliant devices, |
| connections, piping, etc. Only accessible piping will be observed and noted. |
| B. Photograph non-compliant locations |
| C. Assign a hazard degree to each building |
2. Create and submit a report of all findings along with photos. Develop a cross-connection control survey memorandum report that includes findings from the survey and prioritized recommendations for program improvement along with budgetary cost estimates.
The Contractor shall furnish the personnel, equipment, materials, and other requirements necessary for, or incidental to the performance of work associated with this project as noted in the tasks below.
2.0 TASK REQUIREMENTS
Task 1 Work Plan, Kick-off Meeting, and Health and Safety Plan The Contractor shall develop and attend a kick-off meeting with the Robins AFB Backflow Program Manager and Plumbing Shop to discuss the work, and associated requirements to be accomplished under this project. The purpose of the meeting will be for the Contractor to become familiar with the project expectations and requirements, and to begin preliminary planning and data gathering. Other issues affecting installation operations and actions will be included in the discussions. At a minimum, the following will be discussed:
· Points of contact and lines of communication
· Information/data available
· Applicable installation policies and requirements
· Applicable installation procedures for site access and coordination
· Various compliance plans, programs, and policy
The Contractor shall arrange, prepare an agenda and handouts, and conduct a project kick-off meeting. During the meeting, the Contractor shall present the Draft Work Plan. The work plan shall address project organization, personnel, and project management; technical approach; coordination procedures and activity and deliverables schedule; quality assurance and quality control procedures, and activities that will contribute to the successful execution of this TO.
Following the meeting, the Contractor shall prepare and submit meeting minutes documenting and summarizing substantive information discussed and decisions made during the kick-off meeting. The meeting minutes shall be included as an appendix of the Final Work Plan. An onsite technical kick-off meeting will occur on the first day of the survey site visit as discussed under Task 2.
The Contractor shall develop an internal Health and Safety Plan (H&SP). The purpose of the H&SP is to outline health and safety procedures and protocol to be followed by Contractor personnel during cross-connection survey field activities. The H&SP shall comply with applicable Federal, State, and local health and safety requirements, including guidelines established by the Occupational Safety and Health Administration (OSHA).
Also under Task 1, the Contractor shall request necessary documents from the base and conduct a comprehensive review of that data prior to the site survey. This data may include:
· GIS maps and engineering drawings of the installation potable water system (including associated irrigation and building footprints)
· Existing backflow prevention device (BPD) records, specifications and other documents that may be of value in defining the cross-connection and backflow prevention issues
· Real property listing of all base buildings (excluding housing)
Task 2 Cross-Connection Control Survey
Under Task 2, the Contractor shall conduct a site visit to Robins AFB to identify protected and unprotected cross-connections and interview base Bioenvironmental Engineering, Civil Engineering, and Utilities personnel. An inbriefing shall be conducted on the first day of the site visit to discuss proposed site visit activities and pre-coordination efforts (e.g., logistics, escorts, mechanical room access). Also Contractor must be in contact with CE for Utilities Shop to shadow contractor along the survey and give them information they need in order to do the work such as locations of water main in the building, location of backflows, etc.
The Contractor shall inspect each building suspected of having a connection to the potable water system including a 100-foot radius surrounding the outside of each building surveyed. The survey team shall consist of at least one person trained and experienced in cross-connection survey methodology. The Contractor shall assume that 722 buildings with water will be assessed during the cross-connection control survey and that military family housing will be excluded from the effort.
The Contractor shall identify all water uses and examine all visibly exposed water piping and point of use devices internal and external to the facility. All potential cross-connections between the potable and non-potable water uses or sewers shall be documented. Each cross-connection shall be located, catalogued, and tagged. The Contractor shall identify, catalog, and evaluate all existing protections, including air gaps, vacuum breaks, and other BPDs. Information shall include location, type, manufacturer, model number, serial number, device size and date installed, if applicable. The Contractor shall include a color photograph of each cross-connection and device where installed. The Contractor shall not inventory untestable devices such as low hazard hose bibs and laboratory sink vacuum breakers or devices integral to food service equipment and medical equipment.
The Base Bioenvironmental Engineer and Backflow Program Manager shall be notified of all high hazards when identified in order that any serious health threat can be corrected immediately.
Task 3 Cross-Connection Survey Database and Report Under Task 3, the Contractor shall produce a Cross-Connection Survey Memorandum Report in draft version. This report shall include identification of all actual and potential cross-connections, the hazard classification of each, and recommended corrective actions along with approximate costs to implement each recommendation. This report will include a section outlining the justification for recommended corrective actions. The Contractor shall include a narrative description of the building, identify where BPDs are installed, and determine where BPDs or corrective actions are needed. For each potential cross-connection identified that requires corrective action, the Contractor shall rank in descending order, from most hazardous to least hazardous, to allow prioritization of corrective action to be accomplished. The Contractor shall identify approximate costs for each corrective action, considering material, labor, and equipment. The Contractor shall incorporate edits based on draft report review comments and submit the final report to the government. The final report shall include data and reports in electronic format.
All work shall be done during normal business hours which are 0730-1630 Monday thru Friday, excluding holidays.