Questions_and_Answers_for_JBA_Video_Surveillance_Upgrade.docx
DOCX document 12 KB Posted
- Attached to
- Correcting Final Quote Date Extension: JBA Dormitory Video Surviellance--Brand Name Equal
- Solicitation number
- F1D3268179AW01
About this file
Questions and Answers received thus far as of 5 Sep 2018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PART_TWO_of_Q__A_CM.pdf | ||
| Unaccompanied_Housing_Campus_-_Floor_Plans.pdf | ||
| 1624_FLPL_print.pdf | ||
| 1691_FLPL_print.pdf | ||
| 1657_FLPL_print.pdf | ||
| 1631_FLPL_print.pdf | ||
| 1690_FLPL_print.pdf | ||
| 1692_FLPL_print.pdf | ||
| Site_Visit_Instructions_6_Sep_JBA_Video_Surv..docx | DOCX document | |
| Security_Access_Form--Video_Surv..F1D3268179AW01.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions received from field regarding JBA Video Surveillance Upgrade
F1D3648170AW02
Q1) Are Scaled Drawings available ? If so please post.
A1) We have floorplan drawings but not scale…Floor plan drawings are posted on FBO.
Q2) Are Ceilings Suspended? Or Hard Lid?
A2) Hard
Q3) Are there existing Cable Trays for wiring above ceilings?
A3) Unsure
Q4) Can Existing Wiring be utilized?
A4) Yes
Q5) Is a “UPS” required? If so, What Time/Power Duration is required?
A5) No
Q6) Are “Or Equal” Equipment substitutions allowed?
A6) Yes
Q7) Is “Plenum Wire” acceptable?
A7) unknown
Q8) Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?
A8) No
Q9) What is the height of Exterior Cameras? (If any)
A9) Various heights, approx. 8 -10 feet