Sol_F17PS00661_Amd_0002.pdf

PDF 83 KB Posted

Attached to
Design and Construction of a Headquarters/ Visitor
Solicitation number
F17PS00661
Issued by

About this file

F17PS00661

View the file

Other files

File Type Posted
Phase_I_Response_to_RFIs.docx DOCX document
REVISED_Sol_F17PS00661_Provisions_and_Clauses.docx DOCX document
Attachment_1,_Statement_of_Work_Revised.pdf PDF
Sol_F17PS00661.pdf PDF
Attachment_3.__DOL_Wage_Determination.pdf PDF
1.9.6_Vdo_Site_Development_Program.pdf PDF
1.9.1_Valle_De_Oro_NWR_Mapping_Final_-_Certified_D_size.pdf PDF
1.9.7.3_Valle_De_Oro_-_Sanitary_Sewer.pdf PDF
1.9.5_VdO_CAMPUS_PLAN_2016-08-23_11x17_Page_1.jpg JPG image
1.9.8_Ducks_Unlimited_30__Drawings.pdf PDF
1.9.2_Geotechnical_Engineering_Report.pdf PDF
1.9.4_Bubble_Diagram.JPG JPG image
1.9.7.4_Valle_De_Oro_-_PnP_Barr_Main_Canal.pdf PDF
1.9.5_VdO_CAMPUS_PLAN_2016-08-23_11x17_Page_3.jpg JPG image
Attachment_2_,_Past_Performance_Survey.doc DOC document
Attachment_1,_Statement_of_Work.pdf PDF
1.9.11_FIRM.pdf PDF
1.9.9_USFWS_Standard_Floor_Plan_Small.pdf PDF
1.9.13__Visitor_Interpretive_Experience__Plan_(Draft).pdf PDF
1.9.5_VdO_Campus_Plan_2016-08-23_11x17_(1).pdf PDF
1.9.12_050515_Valle_De_Oro_Final_Report_-_Interp_Plan.pdf PDF
1.9.3_Arch_Pgm_Spreadsheet.pdf PDF
1.9.7.2_Valle_De_Oro_-_Water.pdf PDF
1.9.7.1_ABQ_Serviceability_Statement_160517_-_Signed_WORD.pdf PDF
1.9.9_USFWS_Standard_Floor_Plan_Medium.pdf PDF
1.9.7.5_Valle_De_Oro_Non_Potable_Waterline_Extension.pdf PDF
1.9.10_VdO_Exhibit_Specification_Guidelines_Final.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

F17PS00661

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F02

ALBUQUERQUE NM 87102-3118

500 GOLD AVENUE SW

P.O. BOX 1306

FWS, DIVISION OF CONTRACTING AND GE

10/18/20170002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/18/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment to solicitation F17PS00661 is as follows:

- Respond to Phase I RFIs. See attached document "Phase I Response to RFIs"

- Add clauses 52.236-7 "Permits and Responsibilities" and 52.208-9 "Contractor Use of

Mandatory Sources of Supply and Services" see attached document "REVISED SOL_F17PS00661

Provisions and Clauses" section I clauses incorporated by full text.

- SOW Section 5.8 changed to "SEWER: Contractor shall provide an on-site septic system of the type most economical, considering initial and lifetime costs, and capable of handling sewage loads with regard to staff and visitation. Contractor shall consider aerobic

(spray), leach field, activated sludge, or other appropriate systems. System shall be permitted and paid for by the Contractor." see attached document "Attachment 1, Statement of Work Revised"

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rey F. Aragon

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F17PS00661/0002

- Extend Phase I proposal due date to Monday November 27, 2017. The Phase I RFI due date ended close of business Friday November 3. No additional RFIs for Phase I will be accepted.

Legacy Doc #: FWS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.