1.9.3_Arch_Pgm_Spreadsheet.pdf

PDF 71 KB Posted

Attached to
Design and Construction of a Headquarters/ Visitor
Solicitation number
F17PS00661
Issued by

About this file

1.9.3 Arch Pgm Spreadsheet

View the file

Other files

File Type Posted
Phase_I_Response_to_RFIs.docx DOCX document
REVISED_Sol_F17PS00661_Provisions_and_Clauses.docx DOCX document
Sol_F17PS00661_Amd_0002.pdf PDF
Attachment_1,_Statement_of_Work_Revised.pdf PDF
Sol_F17PS00661.pdf PDF
Attachment_3.__DOL_Wage_Determination.pdf PDF
1.9.6_Vdo_Site_Development_Program.pdf PDF
1.9.1_Valle_De_Oro_NWR_Mapping_Final_-_Certified_D_size.pdf PDF
1.9.7.3_Valle_De_Oro_-_Sanitary_Sewer.pdf PDF
1.9.5_VdO_CAMPUS_PLAN_2016-08-23_11x17_Page_1.jpg JPG image
1.9.8_Ducks_Unlimited_30__Drawings.pdf PDF
1.9.2_Geotechnical_Engineering_Report.pdf PDF
1.9.4_Bubble_Diagram.JPG JPG image
1.9.7.4_Valle_De_Oro_-_PnP_Barr_Main_Canal.pdf PDF
1.9.5_VdO_CAMPUS_PLAN_2016-08-23_11x17_Page_3.jpg JPG image
Attachment_2_,_Past_Performance_Survey.doc DOC document
Attachment_1,_Statement_of_Work.pdf PDF
1.9.11_FIRM.pdf PDF
1.9.9_USFWS_Standard_Floor_Plan_Small.pdf PDF
1.9.13__Visitor_Interpretive_Experience__Plan_(Draft).pdf PDF
1.9.5_VdO_Campus_Plan_2016-08-23_11x17_(1).pdf PDF
1.9.12_050515_Valle_De_Oro_Final_Report_-_Interp_Plan.pdf PDF
1.9.7.2_Valle_De_Oro_-_Water.pdf PDF
1.9.7.1_ABQ_Serviceability_Statement_160517_-_Signed_WORD.pdf PDF
1.9.9_USFWS_Standard_Floor_Plan_Medium.pdf PDF
1.9.7.5_Valle_De_Oro_Non_Potable_Waterline_Extension.pdf PDF
1.9.10_VdO_Exhibit_Specification_Guidelines_Final.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NET AREA(SF) FUNCTION EXPANDED DESCRIPTION AREA SUBTOTALS AREA TOTALS

NET (SF) NET (SF)

195 Refuge Manager Office Room for small conference table 160 Assistant Ref. Mgr. Office 200 EE/Vol. Coord. Office Combined Office 120 Interns & Volunteers Shared Office 180 Biologist Office w/Storage 160 LE Office Secure w/locked weapons safe 80 LE Storage Large Freezer, evidence, storage, file cabinets, secure.

400 Admin Staff & Equipment Copy machine, mail, FAX, file cabinets, admin storage.

Adjacent to Entry to greet & direct visitors.

375 Conference Room Seating for 12, w/Storage, AV, data connection 175 Staff Break Room Tables, Fridge, Sink, Microwave - connect to patio 50 Janitor Closet Mop sink & supply storage 40 Recycle space

100 Admin. Storage Distribute space as needed.

80 Telecom/data room Must be separate from electrical/mechanical room

120 Mechanical/Electrical room Size dependent on HVAC/MPE systems designed 200 Staff Restrooms Men & Women

Subtotal 2635 Total Usable Space Apply 1.4 Circulation Factor 3689

Partners Offices:

180 EE Assoc. of NM 120 SF office; 60 SF storage 180 Friends of VDO 120 SF office; 60 SF storage 450 RMYC Space for 7 staff 180 Audubon 120 SF office; 60 SF storage 400 Public Restrooms Men & Women 100 Family/Unisex Restroom

1050 Environmental Education EE plus Multi-Purpose = 125 people (incl. 52 SF table & chair storage rooms plus base & wall cabinet storage)

1050 Multi-Purpose/Auditorium EE plus Multi-Purpose = 125 people (incl. 62 SF table & chair storage rooms plus base & wall cabinet storage)

280 Catering Kitchen

100 Reception & Information Brochures, magazine racks. Adjacent to Entry to greet and direct visitors.

250 Book & Friends Nature Store 100 Admin. Storage Distribute space as needed 50 Janitor Closet Mop sink & supply storage 40 Recycle space

1300 Exhibit plus Lobby

Subtotal 5710 Total Usable Space Apply 1.25 Circulation Factor 7138

VC/OFFICE/EE BUILDING TOTAL 10827

NET AREA(SF) FUNCTION EXPANDED DESCRIPTION AREA SUBTOTALS AREA TOTALS

NET (SF) NET (SF)

600 Maintenance Bay Vehicle Bay & Shop, Emergency eyewash/Shower 120 Unisex Restroom Sink , Toilet & Shower - Loft Storage Above (120 sf) 100 Office for 1 Loft Storage Above (100 sf)

Subtotal 820 Total Usable Space Apply 1.2 Circulation Factor 984

200 RMYC Storage 200 Friends Storage 200 EE Storage

Subtotal 600 Total Usable Space Apply 1.2 Circulation Factor 720

MAINTENANCE BUILDING TOTAL 1704

MAINTENANCE ZONE - Separate Entry

STORAGE ZONE - Separate Entry

VC/OFFICE/EE BUILDING

STAFF ZONE

PUBLIC ZONE

MAINTENANCE BUILDING

Sheet1

File details come from the government source that posted it. Updated .