RFP for Construction at Natural History Halls 2-6
Solicitation number
F15SOL10010
Issued by

About this file

q a final

View the file

Other files

File Type Posted
Am_4.pdf PDF
Amdt_3.pdf PDF
Amendment_2_RFP_F15SOL10010.pdf PDF
RFP_F15SOL10010_Am_1.pdf PDF
F15SOL10010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

F15SOL10010

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

OCON

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

130010303/23/2015000004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/23/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This is amendment 4 to RFP F15SOL10010, including questions submitted as of May 15, 2015.

The deadline for bids is changed to 3 pm on May 27, 2015.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dorothy A. Leffler

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Smithsonian Institution

LAST Update 5/21/15 @ 1:47

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

S001 4/9/2015 Grunley 1 Section L.13.5 (page 60) of the RFP indicates that submissions should be "tape bound only." We understand the Smithsonian Institution's desire to minimize the receipt of bulky proposals (i.e. three-ring binders) and maximize recycling potential. However, the specialized equipment required to perform tape binding is rarely owned in-house thus would require coordinating with outside printing vendors with long processing times (3-

4 days before the proposal’s due date). In order to tape bind the proposal volumes, offerors will have to complete their technical and pricing proposals several days prior to the submission date and deliver them to a reprographic company for binding. This process will drastically reduce the offeror's ability to select the most advantageous subcontractors and guarantee the lowest pricing for the Smithsonian. We respectfully request the ability to use one of the following alternatives in lieu of tape binding: spiral binding, comb binding, ACCO metal binding clips, and/or banker’s clips.

Spiral binding and comb binding are also acceptable.

4/9/2015 Grunley 2 Section L.13.9, section 2, indicates that the offeror should include fill-in information in

Sections G and H. Section G requests key personnel information, but Section H does not appear to have any fill-in information requirements. Please clarify these requirements.

The reference to Section H is an oversight on our part. Please be mindful that Section

K contains certifications on responsibility matters (pp.49-53) which do contain fill-ins.

4/9/2015 Grunley 3 Please reference the drawing table of contents. All of the mechanical drawings on the

TOC that have the “A” sequence and “Attic” title do not match the drawings provided.

The drawings all utilize either a “4” or “P” sequence and “4th Floor” or “Penthouse” title. Please confirm that the mechanical drawings are correct as issued.

The mechanical drawings are correct as issued. The drawing index sheets G-002 and G-

002A have been revised to match the mechanical drawing titles and are included in

Addendum #1.

S002 4/14/2015 Clark 1 Specification Section 211313 (Wet Pipe Sprinkler Systems) references Specification

Sections 211000 and 211100, which are not listed in the set of specifications provided.

Please provide or clarify.

The reference to 21 10 00 and 21 11 00 is not applicable for this project and may be disregarded. Delete specification section 211313, 1.01 B3 regarding the general requirements reference. Delete the last sentence of 211313, 1.04A since there is no exterior work required by this project

4/14/2015 Clark 2 Spec 093033 - Drawing A 1.43 general note B states ” Patch and repair marble floor tiles, reset loose or uneven tiles”. No qualifications which will tell the bidder how much would be required. 20% or 50% of the floor?

Assume 100% of the floor requires patching and repair.

4/14/2015 Clark 3 Spec 093033 - Drawings A 1.11- A1.14 note 4 refers you to 1/ A5.53 states” new base”, are all of the columns to receive new base or are we to salvage the existing and reuse?

Most of the original column surfaces are covered and are not visible. The presence and condition of the existing base cannot be evaluated. Some of the base may be salvaged, however the amount that may be salvaged is unclear at this time. Refer to specification section "Allowances" and "Unit Prices" for additional information.

Please see response to comment 5 for more information about column stone base.

4/14/2015 Clark 4 Spec 093034 - Drawings A 1.11- A1.14 note 60 states “patch and repair existing stone base, where missing replace per original building design”. Not quantified. Is the 1000 lnft going to account for the missing base? No quantity of repairs required on existing.

The quantity of stone base listed in the "Allowances" specification (012100, 3.3 A 2) is intended to estimate the amount of replacement required. Any quantity beyond the estimated allowance will be subject to the unit price. Please refer to specification section "Unit Prices."

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/14/2015 Clark 5 Spec - 093035 - Drawing I 1.00 general finish note 9 states” any existing stone to be salvaged for reuse, coordinate with COTR for any stone reinstallation”. The demo drawings do not indicate where marble base is to be removed. Is it correct to assume the base removal is in combination with the note 12 on Drawings A 1.2D- A1.7D? Note

12 states ”remove multi coat plaster on columns down to terra cotta”. The majority of the columns in this museum have stone base. Please clarify where the stone is to be salvaged from.

If stone base is present on the walls, it should not be removed. It should be repaired as required. If stone base is missing, new stone base to match the original should be provided and installed. Original columns may have existing stone base. The condition of the stone base is unknown at this time and cannot be evaluated since most of the original column surfaces are covered.

Removal of the multi-coat plaster will require the removal of the existing stone base if it is present. Once removed the stone base should be salvaged and reinstalled once the new plaster finish is applied. If no stone base is present once the original column surface is exposed, new stone base to match the original shall be installed.

4/14/2015 Clark 6 Spec - 093036 - Drawing I 1.00 general finish note 10 states “All concealed existing stone wall base to be cleaned & repaired to remain, including areas behind new partitions” Repairs not quantified. Please provide quantification for repairs.

Assume all existing wall base shall be cleaned and repaired to restore the finish to an acceptable level. Refer to specification sections "Allowances" and "Unit Prices" for new base.

4/14/2015 Clark 7 Dwg SG-0-01 states that the Seismic Design Category is B. Please confirm seismic restraints are not required for mechanical, plumbing, and sprinkler systems.

Seismic restraints of mechanical, plumbing, and sprinkler systems are not required for

Seismic Design Category B per Chapter 13 of ASCE 7-10 (as referenced by IBC 2012).

4/14/2015 Clark 8 Spec 211313 - Specification does not specify steel type for sprinkler pipe. Please clarify. Section 1.07 B 1 a calls for Piping is to be per: A53 Pipe, Steel, Black and Hot Dipped, Zinc-Coated, Welded and Seamless. Black steel will suffice.

Section 2.03 E calls for Schedule 40 steel for piping < 4-in and Sch 10 or 40 for larger pipe sizes. Also please note all exhibit space piping to be minimum schedule 40 per

General note 8 on drawing FP 0 01.

4/14/2015 Clark 9 Specification 211313 refers to the Fire Detection and Alarm System Specification as

Section 238111. Please confirm it should be Section 283111 in lieu of Section 238111.

Yes. This is a typo. “238111” should read “283111”. Revise specification section

211313, 1.01 B1

4/14/2015 Clark 10 Can a quantity of asbestos containing drywall be provided. See Specification Section 02

82 00 Par 1.2.2

Drywall construction considered asbestos-containing is indicated in the Hazmat

Drawings.

4/14/2015 Clark 11 Specification Section 02 82 00 Par 1.2.3 gives a list seven of items to be tested by the SI

IH. Should we carry an Allowance for this work? Can you provide a value?

SI will not be providing an allowance for additional testing or unforeseen abatement work nor will SI be performing any additional testing in the work area. Specification section 028200, 1.2.3 can be deleted. Specification Section 028200, 1.2.2 shall be revised to include the following additional lines: 1.2.2(f) All caulk or sealants at the exterior windows and laylights shall be considered ACM. 1.2.2(g) any fire doors to be replaced shall be considered ACM for handling and disposal.

4/14/2015 Clark 12 Specification Section 02 83 00 Par 1.2 B 7 states " If required in the project scope, abatement of existing lead/containing material" Is any lead abatement required on this project other than the existing windows? See detail 1/A 5 21

Refer to the Hazmat drawings, Appendix A and other drawings to determine where

LBP can be anticipated.

4/14/2015 Clark 13 Are the wrought iron sash bars at the skylight painted with lead paint? These are to be refurbished per details on A 5 40. Provide a description of refurbishment?

Drawing A540 refers to the laylight. Hazmat drawings indicate presence of LBP at laylight. Refurbishment includes removal of LBP, any required repair to wrought iron frame components, and repainting of laylight framing.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/14/2015 Clark 14 Note on G 1 20 states " Condition of the existing plaster on the North and south high bay walls of hall 2 is unknown. Can an allowance be provided for this work?

Refer to specification sections "Allowances" and "Unit Prices" for additional information.

4/14/2015 Clark 15 Note #10 on G 1 10 states "All specimens in the project area shall be removed prior to commencement of demolition/construction activities, unless otherwise noted". Are we to assume that these removals are to be performed by SI personnel?

All specimens shall be removed from the space by SI staff prior to the start of construction.

4/14/2015 Clark 16 Note #9 on A 1 11 states " Repair major structural / water damage (if any) to existing windows as required". Can an Allowance for this work be provided?

In lieu of adding an allowance for any minor or major existing window structural / water damage repairs or rework not covered by the contract documents shall be addressed by the COTR through the contract modification procedure outlined in specification section 012600.

4/14/2015 Clark 17 Is there a Hazmat report that can be provided that would indicate where the lead paint and other hazardous material is located?

Refer to specification Appendix A that has been utilized to develop the basis of design.

4/14/2015 Clark 18 Can the name of the installer of the existing work platform under the skylight be provided?

The name of the installer of the existing work platform under the skylight can not be provided. A structural assessment of the existing laylight platform prepared on May

9, 2014 by McMullan & Associates, an independent structural engineering firm, is included as an attachment to the RFI responses for use in developing means and methods to accomplish the work utilizing the existing platform.

4/14/2015 Clark 19 Spec 086300 - Section 1.2C indicates to salvage and reuse existing snap caps. Please confirm if it's acceptable to create a custom aluminum snap cap extrusion in a patinated finish that would match the formed copper material and engage the existing aluminum compression plate.

The existing caps were evaluated and found to be in good condition for reuse. The caps should be reused to be consistent with other skylight assemblies at the museum.

4/14/2015 Clark 20 Spec 086300 - Section 1.3A mentions thermal movements requirement. Please note thermal movements for the existing skylight cannot be modified. Please clarify

The intent of the thermal movements language is to accommodate thermal movements of the new glazing within the existing skylight framing system.

4/14/2015 Clark 21 Spec 086300 - Please provide original as-built shop drawing for skylight, if available As-built drawings or other submit data are not available.

4/14/2015 Clark 22 Spec 086300 - Please confirm no product or preconstruction test report will be required for the existing skylight system

Refer to 086300 Section 1.4 for all product and preconstruction test report requirements.

4/14/2015 Clark 23 Spec 086300 - Section 3.5 indicates tolerances. If the existing system has shifted over the years and caused greater tolerances than noted, please clarify how the requirements would be addressed

Contractor to field verify structure, connections, and opening sizes. If conditions observed exceed tolerance limitation listed in specification, notify COTR. Project team

(SI, AE, GC) will review condition(s) and determine appropriate course of action.

S003 4/14/2015 Forrester 1 RFP F15SO10010 does not include any provisions related to liquidated damages. Please confirm liquidated damages will apply to the project and provide the daily amount and the cap for the total amount.

Liquidated damages will not apply to this project.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/14/2015 Forrester 2 RFP F15SO10010 does not include a bid bond form. Please confirm the SF24 Bid Bond

(revised 1998) shall apply

Confirmed.

S004 4/16/2015 Consigli 1 Specification 011000 1.6 Work Phases paragraph C. states remove existing windows only when new windows are ready to be installed. Drawing A521 General Note #3 states field verify exact configuration and condition of masonry and stone to verify structural integrity for proposed attachments at head, jambs, and sill. How can the existing conditions be verified if the existing window cannot be removed until new windows are ready for installation? Will the Smithsonian allow the windows to be removed and openings temporarily infilled and protected prior to window shop drawing process commencing to allow for proper existing condition assessment to be performed?

The intent of General Note 3 on A521 is for the Contractor to advise the COTR of any perceived structural issues observed during the installation of the new work. The existing galvanized steel frames anchored to the stone structure as depicted in 1/A521 are existing to remain. The existing conditions survey required to produce shop drawings shall occur with the existing glass in place. See G 161 for the temporary protection system required once the glass is removed. Paint color to be selected by the COTR. To clarify the phasing note on G110, the NHB will allow only two windows to be without glass at any time. The quantity of temporary security stands indicated on 4/S501 shall be increased from 3 (shown on SCD102) to 5 so that two/or three stands can be located along the south and east elevation during the renovation.

S005 4/17/2015 Forrester 1 Section L.13.5.2 indicates, “The separate proposal volumes shall be submitted as set forth below: Tape bound only.” Are spiral bound proposal volumes acceptable in lieu of tape bound?

See Amendment #01

4/17/2015 Forrester 2 The finish schedule indicates Roman Mosaic Color Selections. These are proprietary mixes. Please provide color selections for other acceptable manufacturers. Roman Mosaic Tile is identified as the basis of design in the specification with (8) other acceptable manufacturers listed, subject to compliance with the requirements.

The project intent is for the TZ-1 floor color to match throughout the NHB. The other new terrazzo colors (TZ-2 through TZ-8) are generic blends specific to this project.

4/17/2015 Forrester 3 Please provide an anticipated start date for this Project. The intent of this procurement is to award the project 30-60 days after proposals are received. Currently proposals are due May 15, 2015. A Notice to Proceed to begin work is typically issued 2 weeks after project award.

4/17/2015 Forrester 4 In consideration of issuance of Addendum 1, please consider extending the RFI Deadline to Wednesday, April 29th.

The deadline for questions shall be extended to 4/29/15.

S006 4/22/2015 Grunley 1 Section 14.2 part b indicates that resumes are required for subcontractor personnel performing critical elements of the work. Please list which trades you are considering as "critical elements of the work" and are required to provide resumes for in our tech proposal.

The following are considered critical work elements: Demolition/Abatement, Mechanical, Electrical, Fire Protection, Scaffolding, Structural, Plaster, Drywall/Ceilings and Windows.

4/22/2015 Grunley 2 Please confirm if the FF&E Specification Package is to be included in bid. As contained in the RFP, the FF&E Specification Package (including the equipment drawing layout) shall be included in the bid. Costs for delivery and installation as needed shall also be included in the contract. Colors to be selected during the submittal and approval process. See revised RFP bid sheet attached

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/22/2015 Grunley 3 Please confirm if the existing time-lapse camera per Section 013233 part 1.2.C. is to be provided by COTR or GC?

The existing time lapse camera is existing provided by the Museum/COTR

4/22/2015 Grunley 4 Can you clarify if the existing time-lapse camera per Section 013233 part 1.2.C. will be used for Time-lapse Sequence Construction Photographs per part 3.1.H?

No. The existing time-lapse camera shall not be utilized to fulfill the requirements of specification section 01 32 33, 3.1H.

4/22/2015 Grunley 5 The time-lapse photography per Section 013233 part 3.1.H.1 indicates a monthly frequency for phases described in same part H.2.a-d that do not match the work to be performed. Please clarify the frequency for the time-lapse photography and the phases to be photographed

The monthly time-lapse photo locations required per specification section 01 32 33, 3.1H shall be coordinated and approved by the COTR before the first site visit.

4/22/2015 Grunley 6 The Mechanical Sequencing drawings, Note 6 mentions to "provide temporary heating and cooling as required" in those spaces. Please provide heating and cooling load information for those spaces denoted with Note 6. If not, should it be assumed that the same capacities of the permanent equipment should be used for the temporary heating and cooling?

Contractor is responsible for sizing and selection of temporary HVAC units and/or connections in accordance with the Division 1 specifications. For spaces outside the renovation area, temporary equipment/connections shall be sized to deliver the same airflow as the existing systems. Cooling and heating capacity of the temporary equipment to meet or exceed current system capacity for the area served.

4/22/2015 Grunley 7 Per Won-Door Corporation, the manufacturer of the horizontal sliding, accordion-type fire doors in Specification Section 083513 part 2.1A, the head details on Sheet A561, Details 1,2 and 3 should show 3.1/4” reveal as required by UL for the track recess. Also the attached plywood to the structure with threaded rods (need flexibility for header adjustment and leveling)– please coordinate and revise the head details to reflect proper detailing per UL guidelines. Won-Door engineering will help.

The 3-1/4” reveal will be added. The detail will be adjusted to allow header adjustment and attached to the bid set under separate cover

4/22/2015 Grunley 8 Per Spec 083513 part 1.7B for the horizontal sliding, accordion-type fire doors -

Manufacturers Service Agreements, the manufacturer indicated these service agreements are typically handled directly with the owner. Also the preventative maintenance is only required to be performed on an annual basis. Please confirm if the initial 12 months warranty and a 1 time preventative maintenance will be acceptable for the Manufacturers Service Agreements.

Specification Section 083513, 1.7B shall be deleted.

4/22/2015 Grunley 9 Per Spec 083513, part 2.2J3 Air-pressure resistance specifies a range from .05-.15 inches of water column. Please confirm which resistance is needed for this project 0.05, 0.10, or 0.15)?

The Wondoor shall resist .15 inches of water column.

4/22/2015 Grunley 10 Addendum #1- Drawing EP-1.11 (Note 3) and ET-1.11 (Note 11) These notes create an

"Add Alternate" for the floor boxes located under raised platforms. Please clarify the scope for this add alternate, should the add include floor box and raceways back to panel, telecom room, etc.?

Note 3 on EP-111, and note 11 on ET-111 indicate the exhibit platforms are installed as part of a separate scope of work. All floor boxes, conduits, branch circuit wiring, etc. shown on the contract documents are included in the base project. The project does not include any add-alternates for electrical systems.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/22/2015 Grunley 11 Addendum #1- Drawing ET-1.12 Notes 8 and 9 Notes call for removal and reinstallation of "Radio Antenna cabling" and "CWAS systems". Do we have engineered drawings depicting the quantities of locations needing to be removed and their new locations? If not, please provide an allowance for this work to be included in the bid pricing.

The CWAS system is a proprietary system that needs to be dismantled, relocated, salvaged as necessary and reinstalled by Gulf Coast as described in ET-1.12 note 9. GC should comply with the note and obtain proposals from Gulf Coast to accommodate this work

4/22/2015 Grunley 12 Please provide the interior drawer layouts for the S1_Mobile Storage Rousseau cabinets found in FFE package.

No dividers are required in the drawers

4/22/2015 Grunley 13 In reference to general note 4 / drawing A-5.21, will S.I. inventory the stored, steel components for the qty. required for this project?

The current inventory is attached for use. The contractor shall be responsible for crating any unsized pieces and returning the crates to the storage facility or SI use on future projects.

4/22/2015 Grunley 14 Are we to assume that each of the 16 window openings will have out of square conditions hence needing to be custom mitered as noted in details? Please confirm.

Confirmed. Custom miter shall be required at all components

4/22/2015 Grunley 15 Are we to assume that with a 1/16” fabrication tolerance for the 16 exterior window openings consisting of 256 lites could all vary in size, hence will need to be verified in the field as indicated on drawings A-5.21 & A-5.22? Please confirm.

Confirmed. The dimensions of all individual glass lite openings shall be field verified per General Note 2 on drawings A521 and A522

4/22/2015 Grunley 16 Are the blast loading calculations for the exterior window work to include the existing to remain window muntins / frame members or solely rely on the reinforcement steel components and fastening methods indicated?

Refer to specification 057000 section 1.3.D. The supplemental steel window framing, steel glazing stops and anchorage details as documented are based on an existing structural design. Refer to the reference document for questions concerning the components of the design. No new blast loading calculations are required.

4/22/2015 Grunley 17 Will S.I. have a fork lift or other equipment available for loading the steel frame components on to contractors transport vehicle? Please confirm.

The storage facility will handle the materials at their facility and load the materials on to a Contractor provided vehicle. To supplement the information in 01 10 001.13B, Bob Perkins has been the SI point of Contact for coordinating the movement of stored materials Revise note 4 on A521 to include returning unused steel in new crates to the SI designated storage facility.

4/22/2015 Grunley 18 Detail 5 / drawing A-5.31 indicates that the cover caps, PVC caps & extruded pressure caps for the skylight are to be salvaged & reinstalled after the skylight is re-glazed. It is unclear what the existing condition of these pieces are and may be damaged to the point of not be able to be reused which could create cost & production issues during construction. Is it possible to provide new copper cover caps, PVC snap caps, and aluminum extruded pressure caps that match the existing elements in lieu of reusing existing?

See previous question S002-19. The design intent is to reuse the existing caps.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/22/2015 Grunley 19 General note 1 on the hazmat drawings indicates that all drywall compound is considered to be asbestos containing and should be removed in accordance to spec section 028400. In reviewing the hazmat drawings with the actual site conditions, there are some drywall partitions that are not indicated on the hazmat & demo drawings that are present in the actual site conditions. Please confirm whether or not the contractor is to price hazmat & demo activities as shown on the plans and any walls not shown that need to be removed are not to be included in the bid price or can an allowance be set for these conditions?

Any existing drywall demolished will require abatement as stated in general note #1 on drawings HA 111 - HA 116. The intent for demolition is to removal all partitions or other existing assemblies that will conflict with the new construction. Any existing assembly requiring demo that can be field verified and is not shown on the drawings but is required to be removed for the new work to be installed shall be included in the bid price.

S007 4/22/2015 Gilbane 1 Where new steel is being installed approximately how many locations will need Lead

Abatement or do you want a unit cost?

Any connection to existing steel will require LBP abatement

4/22/2015 Gilbane 2 What type of finish do you require on the Terrazzo floor? Refer to spec section 09 66 23 for information regarding resinous matrix terrazzo finishes/ sealers. Terrazzo finish should match appearance of the existing terrazzo in

Mammals Hall.

4/22/2015 Gilbane 3 In Mechanical Room 3rd Floor steel dunnage to be removed – can this be done with a torch?

In general, torches are not allowed to be used in occupied SI spaces that do not have operating sprinkler coverage. Torches are allowed only as a last resort after all other methods are exhausted. Extra requirements for protection and exhaust as well as coordination with the AHJ and Museum will be required if a torch is our last resort.

The Burn Permit and Fire Impairment permits referenced in 01 50 00, 3.4G.1 are attached for information

4/22/2015 Gilbane 4 How many days’ notice does SI require to demo Diana of Tides? Per A122D note 47, provide a minimum of two weeks notice to SAAM prior to demo

4/22/2015 Gilbane 5 Is Window Company doing all glazing demo other than where ACM or Lead Abatement is required?

Scopes determined by General Contractor

4/22/2015 Gilbane 6 Who will remove and salvage Pressure Snap Caps? Scopes determined by General Contractor

4/22/2015 Gilbane 7 Drawing indicates where the lead paint is located. Is the intent to only remove/demo as needed when impacting?

Correct- all existing steel should be assumed to have LBP. All LBP at existing exposed surfaces to remain (plaster, laylight framing, etc.) to be removed.

4/22/2015 Gilbane 8 Is it the intent of SI to have the demolition of plaster walls done under containment? Refer to hazmat specifications for all containment requirements.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/22/2015 Gilbane 9 Specifications dictate that the Owner’s Representative is to perform TCLP test. Should we provide a unit price for disposal in the event the samples fail?

SI IH will perform TCLP as stated. The intent is for standard debris from construction demolition , including recycled materials, to be assumed to be non-hazardous.

Materials associated with lead abatement shall be handled and disposed of as described in spec section 02 83 00, 3.19B. No unit price is required at this point

S008 4/22/2015 Gilbane 1 Solicitation L.13.5.2 “Tape bound only” – in lieu of tape binding do we have the option of either. spiral binding or 3-ring binder? Particularly with regard to the pricing volume tape binding is not preferable.

Spiral binding and comb binding are also acceptable. See previous question S001-01

4/22/2015 Gilbane 2 Please confirm the contractor is to provide and install the FF&E items per the FF&E

Specifications.

Confirmed. See question S006-02

4/22/2015 Gilbane 3 Please confirm where the Costs for Division 11 are to be included they are not included on the submission form

See revised RFP bid sheet attached to include Division 11

4/22/2015 Gilbane 4 Lead abatement scope; documents indicate removal of lead-containing materials. Is the intent for complete removal to base substrate or removal of loose, peeling, or otherwise easily disturbed materials and subsequent encapsulation?

Complete removal is required. Coordinate with Plaster Restoration requirements

4/22/2015 Gilbane 5 Substitution request dated 4/16/15; skylight glazing from George A Petzen, Lintel - A

Division of Mestek, Inc.

Specification requires basis of design product in the base bid. Review of Substitution proposals will not be conducted at this time.

4/22/2015 Gilbane 6 Specification 08 63 00/1.2/B “including mockups and testing.” Existing system is old and the original manufacturer has been out of business for approximately 15 years, making procurement of extrusion for a laboratory mockup time consuming and expensive.

Please advise. Is the intent to provide performance mock-ups shop drawings and conduct a laboratory testing of the system?

No. Per Specification sections 08 63 00,1.5.E and 3.6., field testing only of new components on the existing skylight framing system are to be performed as indicated.

4/22/2015 Gilbane 7 Specification 08 63 00/1.2/C Would it be allowable to create a custom exterior aluminum snap cap extrusion in a patinated finish that would match the formed copper material and engage the existing aluminum compression plate? This would allow cost capture to recycle the existing caps and reduce the risk of reaction between the two dissimilar metals. This would also prevent unforeseen costs of replacing the salvaged caps if damaged during the removal/reinstallation process.

Include salvage and reinstallation of existing copper cover caps as basis of design cost in base bid. See previous question S002-19

4/22/2015 Gilbane 8 Specification 08 63 00/1.3/A Thermal movements for the existing skylight cannot be modified. Does the existing skylight have any issues with thermal movement that should be reviewed?

The intent of the thermal movement language is to accommodate thermal movements of the new glazing within the existing skylight framing system. There are no known thermal movement issues.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/22/2015 Gilbane 9 Specification 08 63 00/1.4/B “Specification, standard details” are moot when working with existing materials. Please advise.

Spec section includes items in addition to just the existing framing system. Provide product data as indicated for these glazing system components included in this specification section.

4/22/2015 Gilbane 10 Specification 08 63 00/1.4/C Are the original as built shop drawings available? The as-built shop drawings are not available

4/22/2015 Gilbane 11 Specification 08 63 00/1.4/G, H, and I How is this to be performed in the field on the existing system?

Product tests and preconstruction testing is not required for the existing skylight framing system. Delete Spec items 08 63 00 1.4 G,H,I.

4/22/2015 Gilbane 12 Specification 08 63 00/1.5/C.1 Could these tests be performed in the field on the existing system?

Yes. It is assumed these tests will be done on the existing skylight framing system

4/22/2015 Gilbane 13 Specification 08 63 00/3.5 If the building or the existing system has shifted over the years and caused greater tolerance than noted, how is this to be addressed? Please advise.

Contractor is to field verify structure, connections and opening sizes. If conditions observed exceed tolerance limitation listed in specification, notify COTR. Project teams (SI, AE, GC) will review condition(s) and determine appropriate course of action.

4/22/2015 Gilbane 14 Specification 08 63 00/3.6/B.2 How is the structural sealant to be inspected under the glass edge after replacing the glass? The structural sealant bead would be covered by the veil, spacer, and sealant at the edge of the glass. Please advise.

The structural sealant is not required in this location. Delete specification section 08

63 00, 3.6B2

4/22/2015 Gilbane 15 Specification 08 63 00 3.6/B.3 Please advise how this is to be performed and under which scope of work/responsibility.

The tests are to be conducted in accordance with ASTM test methods specified and performed according to AAMA 501.

S009 4/24/2015 Clark 1 MDH-1-401 & MD-1-401 - Please clarify what "(RB)" means, shown at the slot registers on MDH-1-401 and MD-1-401

“(RB)” stands for “Rebalance existing device to air or water flow indicated”

4/24/2015 Clark 2 EP-1-A1 & EP-1-A2 - Please provide the required voltage and horsepower of the

VFDs for existing Fans F-26 through F-31.

Existing Fans F-26 through F-31 are each 7.5HP, 208V/3-phase.

4/24/2015 Clark 3 MP-1-B01 - Due to the breakage on the plans between the Chiller Plant basement and

East Wing basement, we are unable to quantify the chilled water expansion pipe. Please provide a quantity (LF) of chilled water expansion pipe from the Chiller Plant to a specific location within the Basement Level of the East Wing.

The corridor from the East Wing Basement to the Chiller Room is 30.5 meters (100 feet) long.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/24/2015 Clark 4 The last sentence of H-26 Bid Specification Volume 2, page 679 of 973 reads "In the event any manufacturer customarily provides a warranty period greater than one (1) year, the Contractor's warranty shall be for the same duration for that component.

"Sureties generally will support warranty bonds up to five years. It is customary for warranties beyond five years be only the responsibility of the manufacturer. We request this requirement be removed from the specification or we likely will be unable to propose on the project.

The intent is to supply a one year warranty on the Security System. The last sentence in 28 0500, 1.24 A can be deleted.

4/24/2015 Clark 5 IEQ cr6.1 Controllability of Lighting - Please clarify responsibilities for items listed in the

FF&E Package

The FF&E package does not contain any lighting components

S010 4/29/2015 Clark 1 On Drawing I-1.11, the column near CL EH16-EHM is shown to receive B6 base. Two columns on I-1.12 along CL EH24 don't show any base. Please confirm if all columns similar to the one shown on I-1.11 should receive B6 base unless noted otherwise.

CL EH16-EHM B2 Base As indicated on I111 (The statement above indicating B6 above is incorrect). Columns along EH24- B2 Base as indicated by Tags that say “B2 Type @

Columns” on other finish plan sheets

4/29/2015 Clark 2 Drawing A-002 Note 7 indicates that trade demolition is to be performed by the respective trades as opposed to a demolition subcontractor. Provided the trade contractors perform all cutting, capping, and draining of systems, please confirm selective demolition can be performed by a demolition subcontractor.

Confirmed

S011 4/29/2015 Forrester 1 Please provide location and extent of work related to Note 12 (Radio antenna cabling)

& 13 (CWAS System) on drawing EP111. Alternately, please provide an allowance to cover this work.

The CWAS system is a proprietary system that needs to be dismantled, relocated, salvaged as necessary and reinstalled by Gulf Coast as described in EP111 note 12. GC should comply with the note and obtain proposals from Gulf Coast to accommodate this work

4/29/2015 Forrester 2 Drawings EP111, ELE111 & ET111 appear to show floor boxes in the same locations.

Please confirm the intent is one floor box at each indicated location will be provided to address HK, L, DMX and AV requirements.

To clarify the bid documents, floor box types FB-1 and FB-2 represent a single floor box shared by multiple load types. The same boxes are shown on each of the floor plans for reference (EP-111, ELE-111, and ET-111 for floor box type FB-1. Drawings E-

421, E-422, and E-423 for floor box type FB-2). Floor boxes FB-3 and FB-4, which are shown with designators (HK, L, P, DMX, AV, IT), are separate dedicated floor boxes for each load type and are each only shown on the associated drawing.

S012 4/29/2015 Consigli 1 Specification Section 086300 - In order to properly mobilize the distribution of material for the work on the roof, will the existing structure support cases of approximately

1400 pounds at 18' on center on both sides adjacent to the work area?

Roof live load criteria is provided on sheet G-150. It is the contractor's responsibility to verify any loads will not exceed limitations.

4/29/2015 Consigli 2 A-1-16D - Please provide a square foot area for the walls and ceilings that are to be covered in wood paneling. Please also note if the walls and ceilings need to be fully veneered after demolition.

Demo existing wood surrounds and celling in opening as described. No new wood paneling in location referenced in RFI. Refer to new work plan A116, details on A562, and RCP on A716 for additional information.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/29/2015 Consigli 3 I-1-00 - Note 1 on the Finish Schedule states all areas that are existing plaster are to be repaired, patched, and/or restored including the back of house. Please clarify if this includes at all mechanical rooms as note 1 is not indicated on the architectural drawings.

There is no historic plaster at the ground floor mechanical room (space located in East

Wing building, as opposed to main building.)

4/29/2015 Consigli 4 HA-1-11 through HA-1-16 - The project drawings identify asbestos containing drywall systems to be removed, the drywall is mounted to wooden & metal studs and plywood to create display areas. Does the owner want the pricing to reflect the removal other than drywall items as part of the abatement or demolition? Is it known whether construction adhesives were used in the building of these display walls?

Refer to Hazmat Report for inventory of asbestos-containing material. Contractor to determine whether removal is under abatement or demolition scope as required by the HA drawings or the AD drawings.

4/29/2015 Consigli 5 On M801 General Note 10, it states “Floating control is NOT permitted. All signals indicated as AO shall be 4-20mA or 0-10V control signals. All control ……ratio” and the damper and reheat valve positions are indicated with an “AO.” The NMNH Facility was constructed with floating (3 position) actuation on the terminal equipment

(VAVs/AVBs/TUs, FCUs, Blower Coil Units, Dual Duct Boxes, etc.). In keeping with the precedence set by the previous projects, is floating control actuation acceptable for the terminal equipment on this project?

Floating control is acceptable for small Fan Coil Units (FCU's) serving single enclosed rooms and Air Volume Control Boxes (AVB's) only. Floating control is not permitted for the FCU's serving the Rotunda (FCU-4RT1 thru 4RT6). See Addendum #1 drawing dated 4/10/15 for revised Note #10.

4/29/2015 Consigli 6 Note #25 on MG002, indicates “PROVIDE AN INDIVIDUAL DDC WALL MOUNTED

TEMPERATURE SENSOR FOR EVERY REHEAT COIL, FAN COIL UNIT, TRANSFER FAN, AIR

VOLUME CONTROL BOX AND FINNED TUBE RADIATION”, while on M805 detail 1 and

MP1102 (other floor plans as well), there are multiple AVBs and FTRs sharing common

“T” (thermostat/temperature sensor), “CO2” (carbon dioxide sensor) and “H” (humidity sensors). Is the intent to have one “T”, one “CO2”, and one “H” per AVB/VAV/TU and one “T” per FTR or are the sensors limited to those shown on the floor plans?

(a) The intent of this note is to require an individual temperature sensor for each listed device, except where floor plans or control diagrams specifically indicate that a single sensor is to serve multiple devices. (b) Only one space humidity sensor and one space CO2 sensor is required per exhibit Hall as indicated by Detail 1/M805.

4/29/2015 Consigli 7 On M808 detail 6 depicts a duct mounted temperature sensor, not a wall mounted “T”, for control of the TFs and FTRs that serve the “window pockets”/service corridors, while the floor plans, for example MP1102 indicates wall mounted “T” for control. Are the TFs & FTRs to be controlled by wall mounted or duct mounted “T”?

The TF's & FTR's serving the "window pockets" shall be controlled by the duct mounted temperature sensors as indicated by the associated control diagram. The wall mounted sensors shown in Service Corridor # 4D, 4E & 4F are to be eliminated.

4/29/2015 Consigli 8 Specification section 250900 2.15.B indicates that Belimo is the only acceptable manufacturer for electronic actuators. In keeping with the precedence set by SI standards and previous projects, are Siemens actuators acceptable for use on this project?

Siemen's actuators are acceptable.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

4/29/2015 Consigli 9 Specification section 250900 2.3.A indicates that “The BAS contractor shall furnish and install …switches, signal repeaters…..to insure a fully functional Ethernet Network” and

2.3.A.1 indicates that “The appropriate quantity of switches and signal repeaters shall be provided……..The BAS contractor shall provide 120 VAC to each piece of network equipment”. In keeping with the precedence set by SI OCIO standards, previous projects and SI’s FISMA requirements, all SI.EDU Ethernet Network hardware and power is part of the overall SI.EDU infrastructure, which is provided/installed/managed by others. The BAS contractor provides and installs the cabling associated with the BAS

Network drops only. The BAS network drops are connected to existing SI.EDU network hardware. Please confirm the SI.EDU Ethernet Network hardware and power are by others (not the BAS Contractor).

The BAS contractor to provide the conduit and network wiring between BAS devices and the building data closets for any BAS devices requiring connection to the SI IT network. BAS contractor to provide all hardware and associated power required for

BAS communications outside of the building data closets and within the building data closets as needed. The GC shall coordinate between divisions (Power verse BAS) as needed to meet all project requirements.

S013 5/4/2015 Forrester 1 The project is indicated to achieve LEED Silver Project Certification (50 to 59 points), however the project checklist included in the RFP identifies only 43 points (Certified

Level). Please provide an updated Checklist that indicates the correct number of points as required to achieve Silver.

The scorecard indicates 43 credits as “Yes” and 19 as “Maybe”. More evaluation is required to determine which of the 19 “Maybe” credits can be obtained to push the project into the Silver threshold. Of the 19 “Maybe” credits, 3 are Contractor responsibility. IDcr1.4 & IDcr1.5, are exemplary performance credits. The viability of obtaining Innovation Credits for Exemplary Performance will be determined during construction. The viability of the third credit, MRcr6, will need to be tracked during construction as well.

5/4/2015 Forrester 2 The LEED Credits which are the responsibility of the Contractor to document listed in the various specification sections do not coordinate with the LEED project checklist provide in Spec Section 01 81 13.16 . Please confirm order of precedence regarding

LEED criteria, or provide a LEED Checklist that is coordinated with the requirements of the project specifications

The LEED Project Checklist indicates which credits the project will pursue.

3 The faux decorative railing on Drawing A5.51 shows the handrail, cap and finials to be bronze. What is the material for the posts and balusters?

The posts and balusters are cast iron

S014 5/5/2015 Forrester 1 The top edge of existing corner guards in the occupied area of the building are all 4’ above the finished floor. Please advise if the new corner guards being installed in halls 2-

6 are full height (floor to ceiling) or if they should match the rest in the building with a top edge 4’ above the finished floor.

Provide corner guards with top edge at 4’-0” a.f.f. to match building standard corner guards in lieu of “full height” as indicated on sheet I-100.

5/5/2015 Forrester 2 Specification section 232500 calls for a HVAC Water Treatment System to be installed.

This system is not shown on the floor plans or the riser diagrams provided in the contract documents. Please confirm this system is not required. If it is required, please provide the location on the plans and risers.

A new Water Treatment System is not required. The Halls 2-6 Project extends existing hydronic system (i.e. chilled water, hot water, etc.) piping to serve new equipment. The contractor is required to test and chemically treat new system extensions prior to connecting to the respective existing central systems. This scope is clearly defined in the execution portion (Part 3) of Specification Section 23 25 00.

Office of Planning Design & Construction

PROJECT: NMNH HVAC Renovations Halls 2-6 and Deep Time Package A

PROJECT NUMBER: 1300103

SOLICITATION: RFP F15SOL10010

SI RFI Number Date Company Request for Information SI Response

5/5/2015 Forrester 3 On Drawing A1.41, Note 43 indicates a railing.