Attachment_1_-_Price_Basis.pdf
PDF 120 KB Posted
- Attached to
- Masonry Repairs for 2015 Federal contract opportunity
- Solicitation number
- F15PS00418
About this file
Price Basis
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_F15PS00418_Amd_000001.pdf | ||
| Site_Visit_-_Agenda.pdf | ||
| Site_Visit_-_Attendance_Sheet.pdf | ||
| Attachment_1_-_Price_Basis.pdf | ||
| Attachment_6_-_DI-137_-_DOI_Release_of_Claims.pdf | ||
| Attachment_5_-_SF-25A_Payment_Bond.pdf | ||
| Sol_F15PS00418.pdf | ||
| Attachment_2_-_Specifications_and_Drawings.pdf | ||
| Attachment_7_-_Important_Notice_to_Offerors.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_4_-_SF-25_Performance_Bond.pdf | ||
| Attachment_7_-_Important_Notice_to_Offerors.pdf | ||
| Attachment_6_-_DI-137_-_DOI_Release_of_Claims.pdf | ||
| Attachment_4_-_SF-25_Performance_Bond.pdf | ||
| F15PS00418.pdf | ||
| Attachment_5_-_SF-25A_Payment_Bond.pdf | ||
| Attachment_2_-_Specifications_and_Drawings.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE BASIS
F15PS00418
All potential Bidders shall complete Attachment 1 – Price Breakdown, and shall submit the completed attachment with their sealed bid.
The following explains the pricing structure of the contract. The attached schedule along with the specifications and the contract drawings shall be read as a whole. There are two (2) basic cost elements: 1) Lump Sum and 2) Estimated Quantities:
Item Nos. 10, 20, 30, 40, 50, and 70 These are Lump Sum (LS) items that include all labor (except for unit priced sub-items), material (except for unit priced sub-items) and equipment necessary to complete the work.
Item No. 60 This estimated quantity item includes all labor (except for unit priced sub-items), material (except for unit priced sub-items) and equipment necessary to complete the work.
Item No. 80 This estimated quantity item includes all labor, material, and equipment necessary to complete the work.
Sub-Item Nos. 20A, 20B, 30A, 40A, 40B, 50A, 50B, 60A, 70A, and 70B These estimated quantity sub-items shall be for the costs of the listed material (e.g. Ashlar Limestone) only, for which the labor and incidental costs will be included in the parent item.
Item Nos. 90, 100 and Sub-Item Nos. 40C, 40D, 60B and 60C These estimated quantity items are for the replacement of any wall capstones that may need reset or replaced. Item 90 and Sub-Items 40C and 60B includes all labor, incidental materials (e.g.
mortar) and equipment necessary for resetting or replacing capstones. Item 100 and Sub-Items 40D and 60C are for the material cost for any capstones that need replaced.
Attachment 1
PRICE BREAKDOWN
F15PS00418
Attachment 1
Work Area Item No.
Sub-
Item No.
Description Qty. Unit Est. Qty. Unit Unit $ Cost
11-A 10 Fire Pit at North Side of Instructional West (FPIW) 1 LS 11-B 20 East Stairs of Instructional West (ESIW) 1 LS
20A ESIW Blue Stone Thermal Finish Treads - Material 70 LF 20B ESIW Slate Pavers - Material 17 SF
11-C 30 East Stairs of Quad (ESQ) 1 LS 30A ESQ Blue Stone Thermal Finish Treads - Material 59 LF
11-D 40 West Stairs of Instruction East (WSIE) 1 LS 40A WSIE Blue Stone Thermal Finish Treads - Material 99 LF 40B WSIE Slate Pavers per SF - Material 174 SF 40C WSIE Wall Caps - Labor 20 LF 40D WSIE WallCaps - Material 20 LF
11-E 50 Main Entrance Stairs of Entry Auditorium (MESEA) 1 LS 50A MESEA Blue Stone Thermal Finish Treads - Materials 40 LF 50B MESEA Slate Pavers - Materials 137 SF
12-A 60 West Bridge Abutment Repairs (WBA) - Limestone Labor 107 CF 60A WBA Ashlar Limestone - Material 27 CF 60B WBA Wall Caps - Labor 20 LF 60C WBA Wall Caps - Material 10 LF
12-B 70 West Stairs of Commons (WSC) 1 LS 70A WSC Blue Stone Thermal Finish Treads - Material 133 LF 70B WSC Slate Pavers - Material 32 SF
Sitewide 80 Miscellaneous Pavers and Borders - Labor and Material 150 SF Sitewide 90 Wall Cap Stones - Labor 40 LF Sitewide 100 Wall Cap Stones - Material 40 LF
Total
All Lump Sump (LS) are Fixed Price. Units: Lineal Feet (LF), Square Feet (SF), and Cubic Feet (CF) are Estimated Quantities