This document provides the evaluation factors for a solicitation seeking F-5 manufactured spare parts. The Air Force Materiel Command Lifecycle Management Center will award multiple IDIQ contracts to procure spare parts listed in an attachment for foreign military sales of F-5 aircraft. Proposals will be evaluated on technical approach across four subfactors relating to source identification, manufacturing parameters, quality requirements, and deficiency reporting. Price will also be evaluated for reasonableness and balance. Technical evaluation is significantly more important than price, though price will substantially contribute to selection. Awards may be made without discussions, though discussions can be held. The contracting period is not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Section M Evaluation Factors for Award For Unclassified F-5 IDIQ Spare Parts Procurement supporting Foreign Military Sales

24 Jan 24

CUI

Contents

1Source Selection1
1.1Basis for Contract Award1
1.2Number of Contracts to Be Awarded1
1.3Solicitation Requirements, Terms and Conditions1
1.4Discussions1
2Evaluation Factors2
2.1Evaluation Factors and Subfactors2
2.2Relative importance of Factors and Subfactors2
3Factor 1: Technical2
3.1Technical Subfactors2
3.1.1Strengths, Weaknesses, and Deficiencies2
3.1.2Technical Ratings3
3.1.3Technical Risk Rating3
3.2Technical Subfactors4
3.2.1Subfactor 1: Source Identification4
3.2.1.1Manufacturer4
3.2.1.2Distributor4
3.2.1.3Existing Manufacturing Source/OEM4
3.2.1.4New Manufacturing Source4
3.2.2Subfactor 2: Manufacturing Parameters5
3.2.3Subfactor 3: Quality Requirements5
3.2.4Subfactor 4: Supply Deficiency Reporting Process5
4FACTOR 2: Price5
4.1Reasonableness5
4.2Unbalanced Pricing5
4.3Options6
4.4Approved Accounting System6
4.5Government Furnished Property6
5.Appendix A ACRONYMS6

i

Source Selection Basis for Contract Award This is a competitive, best-value source selection conducted In Accordance With (IAW) Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), Department of Defense (DoD) Source Selection Procedures dated 1 April 2016, and the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR site, https://www.acquisition.gov/.

The Government will select the best overall offers, based upon an integrated assessment of Technical Approach/Technical Risk and Price. The contract may be awarded to the offerors who is deemed responsible IAW the FAR 9.104-1, as supplemented, whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors and IAW the criteria set forth below, to represent the best value to the Government. This may result in an award to a higher-rated, higher-priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technical and/or overall approach of the higher priced offeror outweighs the price difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective, and therefore professional judgment is implicit throughout the entire process.

Number of Contracts to Be Awarded The Government intends to award multiple Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Foreign Military Sales (FMS) F-5 parts procurement. However, the Government reserves the right to award no contract depending on the quality of the proposals, prices submitted, and/or funds available.

Solicitation Requirements, Terms and Conditions By submitting its offer, the offeror agrees to all solicitation requirements, including terms and conditions, representations and certifications and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to comply with the solicitation's terms and conditions can result in the offeror being ineligible for award.

Discussions Each initial offer should contain the offeror's best terms from a price and technical standpoint; Government intends to make award(s) without discussions. If, however, the Government engages in discussions following the conclusion of these discussions, the offeror's Final Proposal Revision (FPR) will be evaluated in making the source selection decision. If the offeror's proposal has been evaluated as acceptable at the time discussions are closed, any changes in the FPR are subject to evaluation and may introduce deficiencies or risk such that the offeror's proposal may be downgraded or determined to be unacceptable and ineligible for award.

Evaluation Factors Evaluation Factors and Subfactors The award will be made to the offeror proposing the best value solution to the Government based upon an integrated assessment of the evaluation factors and subfactors described below. The following evaluation factors and subfactors will be used to evaluate each proposal:

1) Factor 1: Technical Subfactor 1: Source Identification Subfactor 2: Manufacturing Parameters Subfactor 3: Quality Requirements Subfactor 4: Supply Discrepancy Reporting Process

2) Factor 2: Price Relative importance of Factors and Subfactors The relative importance of each factor is as follows. Factor 1 (Technical) is significantly more important than Factor 2 (Price). However, Factor 2 (Price) will contribute substantially to the selection decision. All technical subfactors are equally important.

Factor 1: Technical The technical evaluation will provide an assessment of the quality of the offeror's technical approach and the risk associated with the technical approach for meeting the Government's requirements. The offeror's technical solution will be rated separately from the risk associated with its technical approach. Subfactor ratings will not be rolled up into a single rating for Factor 1 (Technical).

Technical Subfactors The following four (4) subfactors comprise Factor 1 (Technical):

Subfactor 1: Source Identification Subfactor 2: Manufacturing Parameters Subfactor 3: Quality Requirements Subfactor 4: Supply Discrepancy Reporting Process The Government will evaluate Subfactors 1, 2, 3 and 4 IAW paragraph 3.1.2.1, of the DoD Source Selection Procedures, DOD DFARS PGI Subpart 215.3 August 20, 2022, Methodology 1: Separate Technical/Risk Rating Process. This provides for two (2) distinct, but related, assessments: Technical and Technical Risk.

Strengths, Weaknesses, and Deficiencies The evaluation of strengths, weaknesses, significant weaknesses, and deficiencies for Subfactors 1, 2, 3 and 4 are defined as follows:

· Strength: An aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

· Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.

· Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

· Deficiency: A material failure of a proposal to meet a government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Aspects of the offeror's proposal that receive a strength may be incorporated into the contract.

Technical Ratings Subfactors 1, 2, 3 and 4 will each receive one of the technical ratings described in Table 3.1 below. The technical rating evaluates the quality of the offeror's technical solution for meeting the Government's requirement.

TABLE 3.1 Technical Ratings

Color
Rating
Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one (1) strength.
Green
Acceptable
Proposal indicates an adequate approach and understanding of the requirements.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements.
Red
Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable.

Technical Risk Rating

1) Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased price, degradation of performance, the need for increased Government oversight and/or the likelihood of unsuccessful contract performance.

2) Subfactors 1, 2, 3 and 4 will each receive one of the technical risk ratings described in Table 3.2. below. The risk rating considers the risk associated with the technical approach in meeting the requirement.

Table 3.2 Technical Risk Ratings

Rating
Description
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased price, or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased price, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased price, or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

Technical Subfactors The technical proposals will be evaluated against the following subfactor criteria, including the Performance Work Statement (PWS).

Subfactor 1: Source Identification Manufacturer The government will evaluate the offeror’s manufacturing status IAW the preference identified in PWS para 1.2.

Distributor The government will evaluate the completeness and appropriateness of the offeror’s documentation identifying them as an authorized distributor for each part in their proposal for which they are a distributor.

Existing Manufacturing Source/OEM The government will evaluate the completeness of the offeror’s FAI/FAT acceptance documentation and validate the offeror’s CAGE code.

If the part is a source-controlled part, the government will evaluate completeness of the offeror’s Source Approval Request (SAR) approval documentation ensuring they are a qualified manufacturer.

New Manufacturing Source The government will evaluate the effectiveness and appropriateness of the offeror’s methodology for verifying their competence in the production of the required part and the adequacy of the acceptance or functional testing of the manufactured part.

For parts identified as source-controlled, the government will evaluate the comprehensiveness and accuracy of the offeror’s completed SAR.

Subfactor 2: Manufacturing Parameters The Government will evaluate the offeror’s proposed ramp-up timeline against the government’s target. The Government will evaluate the reasonableness and appropriateness of the lead time, through-put quantity, and minimum order quantity/quantity unit pack (MOQ/QUP).

This requirement is met when the offeror’s proposal meets the USG target. The offeror may receive a more favorable rating for exceeding the target. Offers that do not meet the target may be considered awardable with a higher technical risk rating.

Subfactor 3: Quality Requirements The Government will evaluate the completeness of the offeror’s submission of their ISO 9001 certification or the detailed narrative description of the comprehensiveness and adequacy of their quality control program.

The Government will also evaluate the completeness of the offeror’s submission of their AS9100 or equivalent certificate or the detailed narrative description of the comprehensiveness and adequacy of their quality management system.

Subfactor 4: Supply Deficiency Reporting Process The Government will evaluate the offeror’s narrative description of their Supply Discrepancy Reporting (SDR) process for completeness and ability to adhere to the target SDR submission timeframe of one year. An offeror’s proposal that does not adhere to the target submission timeframe will be evaluated on the timeframe provided and their detailed justification for deviation.

FACTOR 2: Price The offeror’s price proposal will be evaluated for Reasonableness, Balance, and Total Evaluated Price (TEP), including all prime and major subcontractors. The TEP will be a consideration in the best value tradeoff award decision. The TEP will be computed and provided to the Source Selection Authority for award purposes only and does not become part of the contract at award. However, the Contract Line-Item Number (CLIN) prices and rates proposed in the Labor Price Matrices used to calculate the TEP will become contractually binding. Cost Reimbursable No Fee (CRNF) CLINs will not be evaluated and are for funding purposes only.

Reasonableness The offeror's price proposal will be evaluated, using one or more of the techniques defined in FAR 15.404, to determine if it is reasonable. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Reasonableness is established through adequate price competition, as described in FAR 15.404-1(b)(2)(i), or through price analysis.

Unbalanced Pricing The Government will analyze proposals to determine whether they are balanced IAW FAR 15.404-1. Unbalanced pricing exists when, despite an acceptable TEP, one or more of the proposed prices is significantly overstated or understated as indicated by the application of price analysis techniques. If the offeror proposes any advance procurement IAW Section L, paragraph 4.5, the Government will analyze proposals to determine whether they are unbalanced with respect to advance procurement. When advance procurement is part of the program, the price of components, material, parts, and effort budgeted for advance procurement shall be relatively low compared to the remaining portion of the end item's price. An offer may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

Options There are no options in connection with this award.

Approved Accounting System The government will evaluate the provided evidence for an approved Accounting System and all identified changes to the accounting system. In the absence of this information, or the information is determined to be inadequate, an accounting system review will be initiated and either a government-approved accounting system or an approved plan must be completed before award to the system certified.

Government Furnished Property The Government will not provide any Government Furnished Property (GFP) to the offeror for completion of this requirement.

5. Appendix A ACRONYMS The acronyms listed in Table 5.1 are used in this document.

Table 5.1: Acronyms

Acronym
Definition
ACA
After Contract Award
ACO
Administrative Contracting Officer
AF
Air Force
ARO
After Receipt Of
BOE
Basis of Estimate
CAGE
Commercial and Government Entity
CAS
Cost Accounting Standards
CDRL
Contract Data Requirements List
CER
Cost Estimating Relationship
CLIN
Contract Line-Item Number
COM
Cost of Money
CUI
Controlled Unclassified Information
CWBS
Contractor Work Breakdown Structure
DCAA
Defense Contract Audit Agency
DCMA
Defense Contract Management Agency
DFARS
Defense Federal Acquisition Regulation Supplement
DoD
Department of Defense
DUNS
Data Universal Numbering System
EN
Evaluation Notice
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FPR
Final Proposal Revision
FPRA
Forward Pricing Rate Agreements
FPRP
Forward Pricing Rate Proposals
FPRR
Forward Pricing Rate Recommendations
FRATM
Functional Requirements Allocation Trace Matrix
FTE
Full-Time Equivalents
FY
Fiscal Year
G&A
General and Administrative
GFP
Government Furnished Property
HUBZone
Historically Underutilized Business Zone
IAW
In Accordance With
IMP
Integrated Master Plan
IMS
Integrated Master Schedule
IMTP
Integrated Master Test Plan
ITO
Instructions to Offerors
NLT
No Later Than
NTE
Not-To-Exceed
ODC
Other Direct Costs
PCO
Procurement Contracting Officer
POC
Points of Contact
POE
Program Office Estimate
RFP
Request for Proposal
SB
Small Business
SDB
Small Disadvantaged Businesses
SDVOSB
Service-Disabled Veteran-Owned Small Businesses
SF
Standard Form
SOW
Statement of Work
SSA
Source Selection Authority
SSEB
Source Selection Evaluation Board
TIN
Taxpayer Identification Number
VOSB
Veteran-Owned Small Business
WBS
Work Breakdown Structure
WOSB
Woman-owned Small Business

image1.png

File details come from the government source that posted it. Updated .