Exit 11 Gravity Sewer Replacement.pdf

PDF 774 KB Posted

Attached to
Exit 11 Gravity Sewer Replacement
Solicitation number
4918
Issued by
Montgomery County, Tennessee

About this file

This is a project description document for the Exit 11 Gravity Sewer Replacement project in Tennessee. The work involves the installation of approximately 590 linear feet of 8-inch PVC gravity sewer main and the abandonment of approximately 575 linear feet of 8-inch ductile iron gravity sewer main. The scope includes trenching, backfilling, bore and jack operations at designated locations, pipe work, and all necessary appurtenances. The contractor must provide all materials, labor, and equipment required to complete the work. Work in the State right-of-way is subject to Tennessee Department of Transportation permit restrictions requiring all activities to be performed Sunday through Thursday between 8:00 pm and 5:00 am.

The document does not specify pricing terms, bid amounts, set-asides, response dates, bid due dates, site visit requirements, pre-bid meetings, or contract award dates. No information regarding funding sources, project costs, or contract term and renewal options is included in the available file details.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .