Exhibit E Water Elevation Profile Figure.pdf

PDF 114 KB Posted

Attached to
Captain Jack Mill Superfund Site O & M
Solicitation number
RFP FAAA 2026000184 2
Issued by
Arapahoe County, Denver City, Colorado

About this file

This is a technical exhibit document providing a water elevation profile figure for the Captain Jack Mill Superfund Site located in Ward, Colorado. The figure presents hydrological data collected in October 2024, mapping water levels across multiple mine workings and monitoring locations within the site's underground infrastructure. The document illustrates the spatial relationship between various mine portals, adits, monitoring wells, and water management facilities, including the Dew Drop Portal (elevation 9,246 feet), Big Five Adit Portal (elevation 8,940 feet), and associated settling ponds. Water elevation measurements are recorded at multiple monitoring points, ranging from approximately 9,070 to 9,103 feet above mean sea level, with specific data collection dates noted for each location. The figure identifies critical infrastructure components including recirculation pipelines, a 7.5 HP submersible pump at PB #1, vault controls, and a bulkhead floor structure at 8,944.4 feet, along with annotations regarding hydraulic connectivity between certain mine workings and intersections with unknown subsurface voids.

The technical exhibit indicates that the site contains complex mine workings with varying hydrological conditions, including dry monitoring locations and areas with active water circulation systems managed through recirculation infrastructure between PB #1 and DD #3. Notable features include an approximate limestone stockpile spanning 221 feet, existing ore piles, tailings deposits, and upwelling locations requiring monitoring. The document notes that tunnel widths typically measure 9 to 10 feet and identifies several monitoring wells that are not located within active mine workings. This data collection effort supports the ongoing operations and maintenance requirements for the Superfund site, providing essential baseline information for water level management and environmental monitoring activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

WATER LEVELS – October 2024

CAPTAIN JACK MILL SUPERFUND SITE

WARD, COLORADO

Figure 2

By: EJL Date: 01/03/2025

9500'

9450'

9400'

9350'

9300'

9250'

9200'

9150'

9100'

9050'

9000'

8950'

8900'

8850'

0' 0'

EL

EV

AT

IO

N (F

EE

T

AB

O

VE

M

EA

N

S

EA

L

EV

EL

)UNKNOWN VOID(S)

NIWOT #3

NIWOT #1

NIWOT #2

MIDWAY #2

MIDWAY #1

(NOT ON

CENTER-LINE)

DEW DROP

PORTAL

9,246'

DEW DROP #2

(NOT IN

WORKINGS)

DEW DROP #3

DEW DROP #1

(NOT IN

WORKINGS)

TO NIWOT CROSSCUT

AND COLUMBIA VEIN

RECIRCULATION

PIPELINE

PEAK TO PEAK HWY

(HWY 72)

CDOT ROW #1

(NOT IN

WORKINGS)

CDOT ROW #2

NEW CALIFORNIA RAISE

MW #3

(NOT IN WORKINGS)

PB #1 VAULT

RECIRC CONTROLS

PB #2 VAULT

ERT & POWER

MW #2

(NOT IN WORKINGS)

MW #1

(NOT IN WORKINGS)

BIG FIVE ADIT PORTAL

8940'

UPPER SETTLING POND

LOWER

SETTLING POND

LEFT HAND CREEK

DISTANCE FROM PORTAL (FEET)

TAILINGS PILE

BULKHEAD (3" & 12" PIPELINES)

APPROXIMATE

LIMESTONE STOCKPILE

(~221')

EXISTING ORE PILE

UPWELLING LOCATION

976' TO ORE PILE TOE

NO DATA

AVAILABLE

NOTE:

1.) DEW DROP #3, CDOT ROW #2, AND THE NEW CALIFORNIA RAISE (NCR)

ARE HYDRAULICALLY CONNECTED.

2.) MIDWAY #2, NIWOT #1 - #3 INTERSECT UNKNOWN MINE WORKINGS.

3.) TUNNEL WIDTH IS TYPICALLY 9' - 10'.

ROW#1

9,113.23'

(mm/dd/yy)

ROW#1

9,080.66'

(mm/dd/yy)

EXAMPLE:

- LOCATION

- ELEVATION OF MINE WATER amsl

- (DATE SAMPLED)

ROW2

9,070.8'

(10/25/24)

PB1

Water Elevation

9,069.0' (10/25/2024)

BULKHEAD FLOOR @ 8,944.4'

0.5%

PB #1 7.5 HP

SUBMERSIBLE PUMP

MID2

9,070.7' (9/20/24)

RECIRCULATION SYSTEM

BETWEEN PB1 AND DD3

Total Depth 9,251.3'

Total Depth 8,966.7'

Total Depth 9,021.0'

NIW1

9,071.2'

(9/20/24)

NIW2

9,072.6' (9/20/24)

MW3

9,103.4' (9/20/24)

NIW3

DRY

(9/20/24)

DD3

9,070.8'

(10/25/24)

MID1

9,099.4'

(9/20/24)

File details come from the government source that posted it. Updated .