EXHIBIT D Letter of Commitment Ld Rpr Multi Bldgs(Attachment).docx
DOCX document 27 KB Posted
- Attached to
- Replace B610 Fire Protection System
- Solicitation number
- W912LM-22-R-1009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prebid sign in B610 FSS_CandE_WHandB.pdf | ||
| B 07 Preproposal Conference B610 FSS_CandE_WHandB .pptx | PPTX presentation | |
| EXHIBIT B Ld Rpr Multi Bldgs (Attachment).docx | DOCX document | |
| A 02 Fire protection floor plan-205.pdf | ||
| EXHIBIT A Rpr Multi Bldgs (Attachment).docx | DOCX document | |
| B 08 W912LM-22-R-1009.pdf | ||
| A 02 B610 FS Main.pdf | ||
| EXHIBIT C Reference_Questionnaire_Package Rpr Multi Bldgs(Attachment).docx | DOCX document | |
| A 02 SOW B610 Fire Suppression System Repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Fire Suppression System
W912LM-22-R-1009
EXHIBIT D
LETTER OF COMMITMENT OF
KEY SUBCONTRACTOR AND/OR KEY PERSONNEL
(USE SUBCONTRACTOR’S COMPANY LETTERHEAD)
TO: Contracting Officer
SUBJECT: Letter of Commitment for Proposed Contract for ____________________
Dear Sir or Madam:
I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of firm) will fulfill the duties of (state role on a project)
Sincerely, Signature and Title of Authorized Subcontractor Official: ____________________
Date: __________
File details come from the government source that posted it. Updated .