Exhibit C _ CM_GC Fee Proposal.docx
DOCX document 15 KB Posted
- Solicitation number
- PE-50300-RFP-2027-000000320
- Issued by
- Fulton County, Georgia
About this file
This is a CM/GC Fee Proposal exhibit for Project No. 2026-0005, the Global Learning Center College of Lifetime 1st & 4th Floor Renovation at Georgia Institute of Technology in Atlanta, Georgia. The document establishes the fee structure and compensation framework for construction management and general contracting services. The CM/GC is responsible for providing both preconstruction consulting services and construction services as defined in the contract's General Requirements, with all work to be completed within established time limits. The proposal structure separates compensation into distinct phases: preconstruction services and construction services, each with corresponding fixed fees to be negotiated and agreed upon by both the owner and the CM/GC.
The compensation model includes three primary cost components: a preconstruction fee representing gross profit for preconstruction consulting work, a construction fee representing gross profit for construction services, and maximum allowable preconstruction costs and expenses plus construction overhead costs. All overhead costs are inclusive of direct and incidental expenses and are subject to maximum amounts detailed in separate attachments (Attachment A for preconstruction costs and Attachment B for construction overhead costs). The specific dollar amounts for all fees and maximum costs are to be completed by the CM/GC bidder during the proposal submission process, with the preconstruction and construction fees presented as fixed amounts and the overhead costs capped at specified maximums.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _2001_27_ RFQP_CM GLC CoLL Renovation.pdf | ||
| Exhibit E _ General Conditions_Breakdown.xlsx | XLSX spreadsheet | |
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document | |
| Exhibit F _ Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit B _ Contractor Affidavit.docx | DOCX document | |
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit D _ Preconstruction Cost_Expenses Bre.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
Project No. 2026-0005, Global Learning Center College of Lifetime 1st & 4th Floor Renovation CM Svcs, Georgia Institute of Technology, Atlanta, Georgia
CM/GC FEE PROPOSAL
1. CM/GC’S FEE:
Basis of Fee. The CM/GC’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM/GC as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CM/GC performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by CM/GC as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to CM/GC a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
B. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by CM/GC as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to CM/GC a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. CM/GC’S PRECONSTRUCTION COSTS AND CONSTRUCTION OVERHEAD COSTS:
The CM/GC’s Overhead Costs. The maximum amount for the CM/GC’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
CM/GC Name
By:_________________________________________________________ Signature of CM/GC Officer
Title of CM/GC Officer