Exhibit C - CDRLs A005 A006_Digital XRay CT_FY23.pdf

PDF 260 KB Posted

Attached to
Digital X-Ray Computed Tomography (CT) Equipment Federal contract opportunity
Solicitation number
W15QKN-23-R-0073
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains two Contract Data Requirements Lists (CDRLs) for a contract to provide Digital X-Ray Computed Tomography (CT) equipment maintenance services. CDRL A005 requires submission of equipment operational logs and job order records on a one-time basis no later than 30 days prior to the end of the contract. CDRL A006 requires submission of the contractor's safety plan, including an accident prevention plan, within 45 days of contract award and 30 days after an on-site post-award conference. Both CDRLs require Distribution Statement A, allowing for public release and unlimited distribution. The contract number is TBD and will be awarded by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal. The incumbent contractor is North Star Imaging.

View the file

Other files for this federal contract opportunity

Other files attached to Digital X-Ray Computed Tomography (CT) Equipment, newest first.
File Type Posted
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_05.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_02.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_11.jpg JPG image
Attachment 0002 ADDITIONAL SOLICITATION AND CONTRACT REQUIREMENTS.docx DOCX document
Attachment 0006 - Fully Loaded Labor Rate Tables Updated.xlsx XLSX spreadsheet
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_01.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_08.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_04.jpg JPG image
Exhibit A - CDRLs A001 A002_Digital XRay CT_FY23.pdf PDF
Attachment 0007 - NCIC_III_Release.pdf PDF
Attachment 0001 - QASP_Digital XRay CT_FY23.xlsx XLSX spreadsheet
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_07.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_06.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_09.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_10.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_03.jpg JPG image
Exhibit D - CDRLs A007 A008_Digital XRay CT_FY23.pdf PDF
Exhibit B - CDRLs A003 A004_Digital XRay CT_FY23.pdf PDF
Attachment 0004 - FCDDAC3002f.pdf PDF
Solicitation W15QKN-23-R-0073.pdf PDF
Attachment 0003 Contract Quality Requirements.docx DOCX document
Attachment 0005 Labor Category Definitions.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, AUG 96

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-2 (BACK), AUG 96

line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system: Digital XRay CT Maintenance
ctr_no: TBD
contr: NORTH STAR IMAGING
data_item1: A005
title1: EQUIPMENT OPERATIONAL LOG
sub1: JOB ORDER RECORDS & MATERIALS
auth1: DI-MISC-81617
ref1: PWS PARA 4.4
req_ofc1: FCDD-ACE-QEB
dd250_1: NO
appcode1: NO
dist1: A
freq1: OTIME
asof1: SEE BLK 16
firstsub1: SEE BLK 16
subsub1: SEE BLK 16
addr1_1: COR
draft1_1: 0
reg1_1: 1
repro1_1: 0
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
totaldraft1: 0
totalreg1: 1
totalrepro1: 0
rmks1: BLOCK 9: DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED.

BLOCK 10: ONE TIME TO COR.

BLOCKS 11-13: 30 DAYS PRIOR TO END OF CONTRACT.

BLOCK 14: RECORDS SHALL BE DELIVERED TO COR.

group1:
totalprice1:
data_item2: A006
title2: CONTRACTORS SAFETY PLAN
sub2: ACCIDENT PREVENTION PLAN
auth2: DI-SAFT-82080
ref2: PWS PARA 4.7.1
req_ofc2: FCDD-ACE-QEB
dd250_2: NO
appcode2: NO
dist2: A
freq2: OTIME
asof2: SEE BLK 16
firstsub2: SEE BLK 16
subsub2: SEE BLK 16
addr2_1: Contracting Officer
draft2_1: 0
reg2_1: 1
repro2_1: 0
addr2_2: Contracting Specialist
draft2_2: 0
reg2_2: 1
repro2_2: 0
addr2_3: COR
draft2_3: 0
reg2_3: 1
repro2_3: 0
addr2_4: Tech POC
draft2_4: 0
reg2_4: 1
repro2_4: 0
addr2_5:
draft2_5:
reg2_5:
repro2_5:
addr2_6:
draft2_6:
reg2_6:
repro2_6:
addr2_7:
draft2_7:
reg2_7:
repro2_7:
addr2_8:
draft2_8:
reg2_8:
repro2_8:
addr2_9:
draft2_9:
reg2_9:
repro2_9:
addr2_10:
draft2_10:
reg2_10:
repro2_10:
addr2_11:
draft2_11:
reg2_11:
repro2_11:
addr2_12:
draft2_12:
reg2_12:
repro2_12:
addr2_13:
draft2_13:
reg2_13:
repro2_13:
addr2_14:
draft2_14:
reg2_14:
repro2_14:
totaldraft2: 0
totalreg2: 4
totalrepro2: 0
rmks2: BLOCK 9: DISTRIBUTION STATEMENT A. APPROVED OF PUBLIC RELEASE; DISTRIBUTION UNLIMITED.

BLOCK 10: ONE TIME.

BLOCKS 11-13: PLAN SHALL BE SUBMITTED WITHIN 45 DAYS OF CONTRACT AWARD; 30 DAYS AFTER ONSITE POST-AWARD CONFERENCE.

BLOCK 14: PLAN SHALL BE EMAILED ELECTRONICALLY TO:

The cognisant ACC-NJ Procuring Contracting Officer, Contract Specialist, Contracting Officers Representative (COR) and Technical Point of Contact (TPOC).

group2:
totalprice2:
prep_by: Lisa Tanis-Procurement Coordinator
2022-07-27T16:07:04-0400
TANIS.LISA.J.1390800270
prep_date: 02/15/2023
app_by: Tereasa Ferguson
2022-07-28T15:15:32-0400
FERGUSON.TEREASA.M.1296887842
app_date:
Page: 3
of_pages: 4
app: Adobe Professional 8.0
Reset:

File details come from the government source that posted it. Updated .