Attachment 0001 - QASP_Digital XRay CT_FY23.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Digital X-Ray Computed Tomography (CT) Equipment Federal contract opportunity
- Solicitation number
- W15QKN-23-R-0073
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) for non-destructive testing equipment maintenance and repair services. Key requirements include maintaining licensed and certified personnel fully trained on equipment to be serviced, completing all urgent service calls within 15 business days and routine calls within 30 days, performing maintenance to keep systems operating reliably with no call-backs, and completing security training within specified timeframes. Performance will be monitored by the Contracting Officer's Representative and Technical Point of Contact through random checks, verification, and incident reporting with a maximum of one incident allowed per contractor per period of performance. Acceptable performance levels and methods of surveillance are defined for each requirement. The related federal contract opportunity is solicitation number W15QKN-23-R-0073 for digital x-ray computed tomography equipment from the Department of the Army Materiel Command Contracting Command Picatinny Arsenal.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) : Non-Destructive Testing Equipment Maintenance & Repair Services | |||||
| Performance Requirement | Performance Measure | Performance Standard | Acceptable Performance Level (APL) | Method of Surveillance | Compliance (Exceeded, Met or Partially Met) |
| 3.0: Contractor Personnel | Quality | Licensed/certified personnel fully trained in equipment to be serviced. | |||
| Must be 100% compliant | COR - obtain licensing/certification copy for COR files | ||||
| Completeness | Possess all tools and equipment needed. | 90% compliance and 100% compliance within 1 week | Technical POC & COR: Random check/verification | ||
| 3.0 Repair and maintenance, performance. | Timeliness | All urgent service calls must be completed within 15 business days of reporting to the job site unless otherwise agreed to in writing by the Government. |
All routine service calls must be completed within 30 consecutive business days of call receipt unless otherwise agreed to in writing by the Government.
All work must be completed within 30 consecutive working days unless otherwise determined by the COR. Work area will be cleaned of all residue of the project.
| Within 15 days/urgent; Within 30 days routine | COR/Technical POC | |||
| Completeness | Maintenance performed must keep systems operating in a reliable manner. | COR/Technical POC | ||
| Quality | There shall be no call-backs for any completed maintenance or repair work. | |||
| 3.14.7 AT/iWatch/OPSEC Training | Completeness | AT Training: Within 45 days after contract award and annually thereafter; iWatch Training: Within 45 days of contract award and annually thereafter; OPSEC Training: Within 30 days of contract award and annually thereafter. | 100% compliance for training requirements | COR |
| 6.4 Installation or Facility Access | Incident Reporting | As Received | No more than one incident per contractor per period of performance | COR in coordination with the Installation & organization operations office |