Attachment 0001 - QASP_Digital XRay CT_FY23.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Digital X-Ray Computed Tomography (CT) Equipment Federal contract opportunity
Solicitation number
W15QKN-23-R-0073
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) for non-destructive testing equipment maintenance and repair services. Key requirements include maintaining licensed and certified personnel fully trained on equipment to be serviced, completing all urgent service calls within 15 business days and routine calls within 30 days, performing maintenance to keep systems operating reliably with no call-backs, and completing security training within specified timeframes. Performance will be monitored by the Contracting Officer's Representative and Technical Point of Contact through random checks, verification, and incident reporting with a maximum of one incident allowed per contractor per period of performance. Acceptable performance levels and methods of surveillance are defined for each requirement. The related federal contract opportunity is solicitation number W15QKN-23-R-0073 for digital x-ray computed tomography equipment from the Department of the Army Materiel Command Contracting Command Picatinny Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to Digital X-Ray Computed Tomography (CT) Equipment, newest first.
File Type Posted
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_06.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_09.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_10.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_03.jpg JPG image
Exhibit D - CDRLs A007 A008_Digital XRay CT_FY23.pdf PDF
Exhibit B - CDRLs A003 A004_Digital XRay CT_FY23.pdf PDF
Attachment 0004 - FCDDAC3002f.pdf PDF
Solicitation W15QKN-23-R-0073.pdf PDF
Attachment 0003 Contract Quality Requirements.docx DOCX document
Attachment 0005 Labor Category Definitions.docx DOCX document
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_05.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_02.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_11.jpg JPG image
Attachment 0002 ADDITIONAL SOLICITATION AND CONTRACT REQUIREMENTS.docx DOCX document
Attachment 0006 - Fully Loaded Labor Rate Tables Updated.xlsx XLSX spreadsheet
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_01.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_07.jpg JPG image
Exhibit C - CDRLs A005 A006_Digital XRay CT_FY23.pdf PDF
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_08.jpg JPG image
CAO-23-0246 - JA Sole Source FAR Part 13 - Redacted_Page_04.jpg JPG image
Exhibit A - CDRLs A001 A002_Digital XRay CT_FY23.pdf PDF
Attachment 0007 - NCIC_III_Release.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) : Non-Destructive Testing Equipment Maintenance & Repair Services
Performance RequirementPerformance MeasurePerformance StandardAcceptable Performance Level (APL)Method of SurveillanceCompliance (Exceeded, Met or Partially Met)
3.0: Contractor PersonnelQualityLicensed/certified personnel fully trained in equipment to be serviced.
Must be 100% compliantCOR - obtain licensing/certification copy for COR files
CompletenessPossess all tools and equipment needed.90% compliance and 100% compliance within 1 weekTechnical POC & COR: Random check/verification
3.0 Repair and maintenance, performance.TimelinessAll urgent service calls must be completed within 15 business days of reporting to the job site unless otherwise agreed to in writing by the Government.

All routine service calls must be completed within 30 consecutive business days of call receipt unless otherwise agreed to in writing by the Government.

All work must be completed within 30 consecutive working days unless otherwise determined by the COR. Work area will be cleaned of all residue of the project.

Within 15 days/urgent; Within 30 days routineCOR/Technical POC
CompletenessMaintenance performed must keep systems operating in a reliable manner.COR/Technical POC
QualityThere shall be no call-backs for any completed maintenance or repair work.
3.14.7 AT/iWatch/OPSEC TrainingCompletenessAT Training: Within 45 days after contract award and annually thereafter; iWatch Training: Within 45 days of contract award and annually thereafter; OPSEC Training: Within 30 days of contract award and annually thereafter.100% compliance for training requirementsCOR
6.4 Installation or Facility AccessIncident ReportingAs ReceivedNo more than one incident per contractor per period of performanceCOR in coordination with the Installation & organization operations office