SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

SB B5 Water Intrusion Investigation Service

01 11 00 SD-01 Preconstruction Submittals

1.6

G

Salvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1List of Contact Personnel

01 20 00 SD-01 Preconstruction Submittals

1.3 GEarned Value Report

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.8.1 GAPP - Construction

1.17Dive Operations Plan

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.13Notifications and Reports

1.13.2 GAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 35 26 1.5Contractor Safety Self-Evaluation

Checklist

1.7.1.5Crane Operators/Riggers

1.8.3.2 GStandard Lift Plan

1.8.3.3 GCritical Lift Plan

1.8.3.4 GNaval Architecture Analysis

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

1.13.5Third Party Certification of

Floating Cranes and

Barge-Mounted Mobile Cranes

1.15License Certificates

1.15.1 GRadiography Operation Planning

Work Sheet

1.15.1 GPortable Gauge Operations

Planning Worksheet

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 58 00 SD-02 Shop Drawings

GPreliminary One Line

1.4.1 GPreliminary Drawing Indicating

Layout And Text Content

SD-04 Samples

GFinal Rendering

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

01 58 00 GFacility Recognition Plaque

01 78 00 SD-03 Product Data

3.3Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

Instructions

SD-10 Operation and Maintenance

Data

GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2 GRecord Drawings

As-Built Record of Equipment and Materials

GCertification of EPA Designated

Items

GCertification Of USDA Designated

Items

3.4.1 GInterim DD FORM 1354

3.4.2 GChecklist for DD FORM 1354

GHigh Performance and

Sustainable Building (HPSB)

Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

File details come from the government source that posted it. Updated .