Exhibit 5 - Specifications.doc
DOC document 77 KB Posted
- Solicitation number
- S-73000-00017478
- Issued by
- Marion County, Oregon
About this file
This document is a specifications exhibit for the Oregon Department of Transportation (ODOT) related to an illegal camp deterrent rock installation project under the I5 overpass over Silverton Road in Salem, Oregon. The project involves installing large deterrent rocks across four quadrants (NE, SE, SW, and NW) of the intersection, with estimated quantities of 30 tons, 50 tons, 420 tons, and 35 tons respectively, plus 64 feet of ornamental iron fencing supplied by the agency in the SE quadrant. The work must be completed during standard business hours (7:00 AM to 5:00 PM, Monday through Friday) with no weekend or state holiday work permitted. Work locations are restricted to ODOT right-of-way only, with no placement allowed within City of Salem right-of-way. The project is coordinated under Project Manager Cody Stone (503-953-6334) and Resident Project Representative David Anderson (503-930-3099), and bidders are encouraged to visit the site to assess work conditions and locations.
The contractor must follow the 2024 Oregon Standard Specifications for Construction and comply with all applicable technical specifications referenced in the contract documents. Traffic control requirements are minimal as project sites are off the highway, though appropriate work zone signage conforming to MUTCD and Oregon Temporary Traffic Control Handbook standards must be provided. The contractor is responsible for utility notification and coordination by contacting the Oregon Utility Notification Center (1-800-332-2344) prior to work, identifying any conflicts, and arranging resolution with utility owners. All removed materials become contractor property and must be disposed of satisfactorily. Payment is made only for bid items installed per specifications and includes all labor, equipment, materials, traffic control, mobilization, supervision, and incidental costs, with final inspection and acceptance by the Project Manager or Resident Project Representative required before payment issuance. The final contract quantity will be based on the accepted bid price and ODOT's available budget.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017478_RFCQ.docx | DOCX document | |
| Attachment B - Sample Contract~11.docx | DOCX document | |
| Attachment A Form A-2 Bid Pricing Form~3.xlsx | XLSX spreadsheet | |
| Exhibit 6 - Plans~8.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 5
SPECIFICATIONS
I5 over Silverton Rd Illegal Camp Deterrent Rocks OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION. The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed specifications in Part 00200 and beyond (“technical specifications”) that apply to this Project. Some sections of the technical specifications may be identified and modified in the Contract Documents. Sections of the technical specifications not identified in the Contract Documents remain applicable to the Contract according to their original terms.
Sections 00120-00199 in Part 00100 of the Standard Specifications are not applicable to the Contract unless they are specifically identified in a Contract Document as being applicable. However, if a section in Part 00100, Section 00120—00199, that has been identified as being applicable references another section in Part 00100, or if a technical specification references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Abbreviations, definitions, and conventions in Part 00100, Section 00110, apply to the ITB and any resulting Contract as required for context within the Contract Document. The Standard Specifications can be accessed online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
SPECIAL PROVISIONS
The special provisions below identify and modify certain sections of the Standard Specifications.
All number references in the special provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.
1. PROJECT MANAGER:
Cody Stone, PE
Maintenance and Operations Project Manager Cell: 503-953-6334
Cody.Stone@ODOT.Oregon.gov
2. RESIDENT PROJECT REPRESENTATIVE
David Anderson
Transportation Maintenance and Operation Manager – Salem Crew Cell: 503-930-3099 David.Anderson@ODOT.Oregon.gov
3. WORK SCHEDULE:
Contractor must perform all work under the Contract during the hours of 7:00 am and 5:00 pm Mondays through Fridays. No work may be performed on weekends or state-observed holidays. These hours may change with the approval of the Project Manager.
4. DESCRIPTION OF WORK:
The work to be done under this Contract consists of the following:
A. Work locations are the NE, SE, SW, and NW quadrants of the intersection of the I5 overpass over Silverton Road in Salem.
a. NE: Install an estimated 30 tons of rock placed along the structure pavers to 18” from the sidewalk follow the sidewalk to the existing fenceline east, follow the existing fenceline to the existing cross fencing / gate then back to the pavers.
b. SE: Install an estimated 50 tons of rock and 64 feet of ornamental iron fence (agency supplied) as shown on the plan. The fence is the same as that found under the market Street overpass in Salem. Also install a single row of rocks along the new fencing.
c. SW: Install an estimated 420 tons of rock behind United Rental on the south end and run a single row up the slope to the soundwall. Through the middle 55’ wide from United Rentals fence to the slope. North end 18” from the sidewalk. Follow the structure pavers to 18” from the sidewalk west to the existing fence corner, follow the existing fenceline to the cross fencing / gate then back to the pavers.
d. NW: install an estimated 35 tons of rock along the structure pavers to 18” from the sidewalk follow the sidewalk west to the fenceline corner, back to the existing cross fencing / gate then back to the pavers. This quadrant will also need a single row of rock along the fenceline to the north for 100’ The intent of the project is to install large rocks that are spaced close enough so that a tent cannot be placed and cannot be easily moved without equipment. The rock scaping can increase on sloped areas as mentioned on the plans. ODOT has used Allied Rock/Riverbend as a rock source for other boulder install project performed by maintenance forces and Scott Panter (971) 372-9431 was our contact.
After coordinating with the City, no rocks are allowed to be placed within the City’s ROW, and the plans have been detailed so that all work is in the ODOT ROW. Strictly follow the plan and contact the project manager if you have any questions.
It is highly recommended that the Bidders visit the sites to become familiar with the work locations and conditions.
The actual quantity included in the awarded Contract will be based on the accepted Bid price and ODOT’s available budget for this project.
5. TRAFFIC CONTROL:
The project sites are off of the highway and traffic control for lane closures is not required. However, the Contractor shall provide appropriate Work Zone signage for shoulder work, if required. Signs must conform to requirements in the "Manual on Uniform Traffic Control Devices" (MUTCD) and supplemented by the “Oregon Temporary Traffic Control Handbook.” These manuals are available online at the following website addresses:
http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm http://www.oregon.gov/ODOT/HWY/TRAFFIC-ROADWAY/docs/pdf/2011_OTTCH.pdf No impacts to travel lanes will be permitted. Some locations may require equipment to be temporarily parked on grass behind the sidewalk or paved shoulder. No shoulder closures will be allowed without written approval from the Project Manager. Parking equipment on the sidewalk is not allowed.
6. GENERAL NTOES:
a. Regarding the fence installation, the contractor shall comply with ORS 757.542 to 757.562 and shall contact the Utility Notification Center. Buried utilities may be present within the project. Contractor is responsible for identifying any utility conflicts and shall coordinate conflict resolution with utility owners. This project is located within the area covered by the Oregon Utility Notification Center, which is the utility notification system for notifying the owners of utilities of work being performed within the vicinity of their facilities. The Utility Notification system telephone number is 1-800-332-2344.
b. Removed materials will become the property of Contractor at the point of removal and must be disposed of in a manner satisfactory to the Project Manager.
c. No disposal of unused concrete on the jobsite. All cleanout of concrete delivery trucks shall be performed in an environmentally safe manner approved by the Project Manager.
d. Payment will be made only for bid items installed per the specifications. Payment for bid items installed will include all labor, equipment, materials, traffic control, mobilization, supervision, and any other costs incidental to the work. If a work item isn’t listed on the bid schedule, no separate or additional payment shall be made for the work.
e. Completed work will be inspected and must be accepted by the Project Manager or Resident Project Representative prior to any payment being issued.
f. Protect all materials left on state Right of Way. ODOT is not responsible for any loss or damage to equipment or materials.