Exhibit_3_Aerial_Image.pdf
PDF 33 KB Posted
- Solicitation number
- RFP-080-2878902-TV
- Issued by
- Orange County, San Francisco City, California
About this file
Exhibit 3 is an aerial imagery document supporting the County of Orange, OC Public Works' Request for Proposals for the Santa Ana River (E01) Avio Tide Gates Replacement project. The document provides access to aerial imagery, topographic survey data, and 3D point cloud information of the Avio Gates project site in Huntington Beach, California through an ArcGIS Map Series application. This visual resource allows respondents to review the project location and site conditions for the replacement of two existing "Avio-style" mechanical level control tide gates that currently suffer from corrosion, failing coatings, and damaged trash racks. Prospective contractors can access detailed geospatial data to support their project planning and cost estimation during the proposal development phase. A mandatory pre-submittal meeting and site visit is scheduled for March 10, 2026, at 10:00 a.m. at 1299 Victoria Street, Costa Mesa, California, with RSVP required by March 9, 2026. Electronic proposals are due by 2:00 p.m. on March 31, 2026, with award anticipated in August 2026.
The project budget is estimated at approximately $4,220,000. Respondents must possess a minimum of five years of direct general contracting experience, hold a current Class A California Contractor's License, and demonstrate bonding capacity equal to 100 percent of the contract value. Evaluation will occur across three phases with a maximum 1,000 points: written responses (500 points), presentations or interviews (400 points), and cost proposals (100 points). The County of Orange Local Small Business (OCLSB) Preference provides a five percent cost score deduction for certified OCLSB businesses, with an additional eight percent deduction available for businesses certified as both OCLSB and Disabled Veteran Business Enterprise (DVBE). All contractors must comply with California Labor Code Section 1771.1(a) and prevailing wage requirements. Performance and Payment Bonds equal to 100 percent of the construction contract value are required, along with comprehensive insurance coverage including Commercial General Liability of $5,000,000 per occurrence and Contractor's Pollution Liability of $1,000,000 per occurrence. Construction is anticipated in summer or fall 2027, contingent on permit acquisition.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Avio Gates View:
Aerial Imagery
Topographic Survey
3D Point Cloud https://urldefense.com/v3/__https:/ocpw.maps.arcgis.com/apps/MapSeries/index.html?appid=03 3b3ec69c0c45b7afc07aeb84012c91__;!!KL1yqyOaGX2drUI!kAo22CLTVJanxKgRZCcbJdT-xmTQS5ahAX-dKUi7R4UnMcFd6yrfZq7UgEIP3qf1UPPqhOaYSaBreGn4l95oTWu5VC0$ https://urldefense.com/v3/__https:/ocpw.maps.arcgis.com/apps/MapSeries/index.html?appid=033b3ec69c0c45b7afc07aeb84012c91__;!!KL1yqyOaGX2drUI!kAo22CLTVJanxKgRZCcbJdT-xmTQS5ahAX-dKUi7R4UnMcFd6yrfZq7UgEIP3qf1UPPqhOaYSaBreGn4l95oTWu5VC0$ https://urldefense.com/v3/__https:/ocpw.maps.arcgis.com/apps/MapSeries/index.html?appid=033b3ec69c0c45b7afc07aeb84012c91__;!!KL1yqyOaGX2drUI!kAo22CLTVJanxKgRZCcbJdT-xmTQS5ahAX-dKUi7R4UnMcFd6yrfZq7UgEIP3qf1UPPqhOaYSaBreGn4l95oTWu5VC0$ https://urldefense.com/v3/__https:/ocpw.maps.arcgis.com/apps/MapSeries/index.html?appid=033b3ec69c0c45b7afc07aeb84012c91__;!!KL1yqyOaGX2drUI!kAo22CLTVJanxKgRZCcbJdT-xmTQS5ahAX-dKUi7R4UnMcFd6yrfZq7UgEIP3qf1UPPqhOaYSaBreGn4l95oTWu5VC0$
File details come from the government source that posted it. Updated .