This is a Schedule of Quantities and Prices exhibit for a state or local contract opportunity. The document establishes a detailed pricing structure for specified goods or services to be provided under the contract. It outlines the itemized list of products or services with corresponding quantities required, unit prices, and extended total costs for each line item. The schedule serves as the basis for cost evaluation and award determination, clearly delineating what quantities of each item or service the contracting agency expects to procure and at what unit cost. This exhibit is critical to the bid evaluation process, as it allows bidders to submit competitive pricing and enables the agency to compare proposals on a standardized basis across all responding vendors.

The pricing terms and conditions reflected in this schedule establish the financial parameters for contract performance and payment. The document typically specifies whether pricing is fixed, subject to adjustment, or includes any escalation clauses. Any applicable set-asides, such as small business or minority-owned enterprise preferences, would be identified in relation to specific line items or total contract value. The schedule may also reference incumbent contractor information if the contract represents a renewal or replacement of existing services. Funding sources, appropriation details, and budget authorization amounts would be documented to ensure financial commitment and availability for the contracted goods or services.

View the file

Other files

File Type Posted
EXHIBIT 3 - EVALUATION CRITERIA.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
FORM 3 - BUSINESS DATA SHEET.pdf PDF
FORM 4 - SBE-DVBE AFFIRMATION.pdf PDF
EXHIBIT 12 - PREVAILING WAGE INFORMATION.pdf PDF
OP140983.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (SET-ASIDE).pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 5 - BID LETTER.pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER.pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
SUBCONTRACTOR LISTING FORM.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS.pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT I - RESERVED.pdf PDF
FORM 1 - SBE-DVBE SUBS & SUPPLIERS.pdf PDF
FORM 2 - AFFIDAVIT.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT H - PREVAILING WAGE INFORMATION.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (Non-Fed).pdf PDF
EXHIBIT A - STATEMENT OF WORK.pdf PDF
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE.pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
FORM 6 - SBE-DVBE DEALER-DISTR AFFIRMATION.pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No.

Required Test Procedure

(A) Unit Cost

(B) Number of

Tests

(A) x (B) =

(C)

1 AQMD Rule 461 Reverification Test / (C.A.R.B Test) 13

Locations with one (1) monitoring panel (retests charged at this rate) 18

Locations with one (2) monitoring panel (retests charged at this rate) 10

Locations with one (3) monitoring panel (retests charged at this rate) 2

5 Spill bucket testing 36 6 Tank Level Monitoring / Overfill Prevention valve test 13 7 Leak Detector Testing 14

Leak Rate & Cracking Pressure of Pressure/Vacuum Vent Valves 6

Permit application preparation, CUPA representation for requested work, substantial to CUPA, and any additional CUPA requested edits (per permit application package) 2

10 Additional cost for labor (Technician) 10 11 Additional cost for labor (Assistant) 10 12 Estimated Materials and Repair Parts 1 13 Estimated Labor Cost for Repairs 2

Total

Required Test Procedure

(A) Unit Cost

(B) Number of tests

(A) x (B) = (C)

1 AQMD Rule 461 Reverification Test / (C.A.R.B Test) 13

Locations with one (1) monitoring panel (retests charged at this rate) 18

Locations with one (2) monitoring panel (retests charged at this rate) 10

Locations with one (3) monitoring panel (retests charged at this rate) 2

5 Spill bucket testing 36 6 Tank Level Monitoring / Overfill Prevention valve test 13 7 Leak Detector Testing 14

Leak Rate & Cracking Pressure of Pressure/Vacuum Vent Valves 6

Permit application preparation, CUPA representation for requested work, substantial to CUPA, and any additional CUPA requested edits (per permit application package) 2

10 Additional cost for labor (Technician) 10 11 Additional cost for labor (Assistant) 10 12 Estimated Materials and Repair Parts 1

Required Test Procedure

(A) Unit Cost

(B) Number of

Tests

(A) x (B) = (C)

1 AQMD Rule 461 Reverification Test / (C.A.R.B Test) 13

Locations with one (1) monitoring panel (retests charged at this rate) 18

Locations with one (2) monitoring panel (retests charged at this rate) 10

Locations with one (3) monitoring panel (retests charged at this rate) 2

5 Spill bucket testing 36 6 Tank Level Monitoring / Overfill Prevention valve test 13 7 Leak Detector Testing 14

Leak Rate & Cracking Pressure of Pressure/Vacuum Vent Valves 6

Permit application preparation, CUPA representation for requested work, substantial to CUPA, and any additional CUPA requested edits (per permit application package) 2

10 Additional cost for labor (Technician) 10 11 Additional cost for labor (Assistant) 10 12 Estimated Materials and Repair Parts 1