This document package includes a daily progress report template and a solicitation for hull preservation services on a naval vessel.
The solicitation requests quotes for firm-fixed-price CLINs to provide paint materials and a field service technical representative for hull preservation of the USS ANCHORAGE (LPD-23). Quotes are due by May 9, 2023 with work to begin on July 24, 2023 and be complete by January 29, 2024. The daily progress report template outlines requirements for documenting surface preparation, paint application details, and overall work summaries to be included in a final report. The solicitation incorporates various FAR and DFARS clauses and is issued by the Department of the Navy Naval Sea Systems Command seeking quotes from commercial contractors to perform this work.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DAT A REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No, listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 B TDP TM OTHER MGMT--- --
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
PAI NT SUPPLY AND SERVICES N5523623R0005
1, DATA ITEM NO, 2. TITLE OF DATA ITEM 3. SUBTITLE
CONTRACTOR'S PROGRESS AND STATIJS REPORT DAILY PAINT PROGRESS REPORT
B004
4, AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6, REQUIRING OFFICE
DI-MGM T-81928 SEE BLK 16 SWRMCC310
7, DD 250 REQ 9. DIST STATEMENT 10,FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ ASREQ b. COPIES
8, APP CODE 11, AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final D SUBMISSION Draft
A NA ASREQ Reg Repro
SWRMC 310PM
SWRMC C410B ACO
16, REMARKS
BLK 4: The Daily Paint Progress Report shall include daily observations and recordings of surface preparations (profiles, chloride readings, and temperatures), ambient temperature and dew point, and paint application and consumption (quantities, batch numbers, color, wet and dry film thickness, etc). These reports shall include time of day for significant events (e.g. start and finish times, discussions with shipyard personnel regarding problems, etc.). Summary of work completed during the availability including photographs and enclosed in a binder.
The Daily Paint Progress Report shall be located in the last section of the Final
Availability Report (CDRL, B007).
BLK 5: CONTRACT REFERNCE PWS PARA 5.2.3.2, 5.2.3.3, 5.2.3.4, 5.2.3.5, 5.2.3.7,
5.2.3.8, 5.2.3.9, 5.2.3.10, 5.2.3.11, 5.2.3.12, 5.2.3.13, 5.2.3.14.
BLK 08: SWRMC representatives shall sign Daily Paint Progress Reports. The
Government will approve the initial submittal for format and provide comments ten (10) calendar days after receipt.
BLK 09: Distribution Statement D: Distribution authorized to Department of Defense and
U.S. DOD Contractors only (operational use) (19APR2023). Other requests for this document shall be referred to Commander, Southwest Regional Maintenance Center Code
400, Naval Base San Diego, 3755 Brinser Street Suite 1, San Diego CA 92136.
BLK 12: Initial submittal is due at availability start date minus 15 days (A-15) for format approval.
15.TOTAL
G. PREPARED BY H.DATE I. APPROVED BY
DONSTON RUSSEL
Digitally signed by
• DONSTON.RUSSEL.LEE.1288366< 0
.LEE.1288366000
n-•-· •·u,.,� n.t. n7 1�•1i::•�1 _n7'M
0 1 1
J.DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of_3_ Pages
Adobe Professional 8.0
17, PRICE GROUP
18, ESTIMATED
TOTAL PRICE
Report shall be submitted daily during the preservation process. All daily reports shall be included in conjunction with CDRL B007 NLT ten (10) calendar days after completion of availability.
BLK 13: Subsequent reports shall be submitted daily during the preservation process. All daily reports shall be included in conjunction with CDRL B007 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Daily Paint Progress Report shall be in Adobe Acrobat
(PDF) format and submitted via email or CD to all the addressees:
Current SWRMC C310 Project Manager (PM).
Current SWRMC C410B Administrative Contracting Officer (ACO).
E-mail addresses shall be provided upon award of the contract.