Summary

This file contains Appendix E of the Intelligent Transportation System (ITS) Specifications and Details for a Kansas Department of Transportation (KDOT) project, serving as the technical design documentation for ITS infrastructure installation. The project encompasses the installation of various ITS devices including Dynamic Message Signs (DMS), Closed-Circuit Television (CCTV) cameras, vehicle detection systems, fiber optic communications infrastructure, ITS cabinets, pull boxes, splice vaults, transformers, and associated electrical and communications conduit across multiple sites. The specifications detail comprehensive requirements for device placement, foundation construction, cable routing, grounding systems, and coordination with existing utilities including CenturyLink/Lumen fiber, Kansas Turnpike Authority facilities, and municipal services. Key contractor responsibilities include utility location and notification via 811, site surveying and staking, equipment storage coordination, traffic control implementation, conduit installation in both trenched and bored configurations, fiber optic cable pulling and splicing, GPS documentation of all installed devices, and project restoration including seeding of disturbed areas. The documentation emphasizes strict compliance with National Electrical Code standards, KDOT utility accommodation policies, and coordination requirements with utility companies, particularly regarding work within specified clearance distances from existing fiber and high-voltage infrastructure.

The specifications establish detailed technical standards for materials, installation methods, and quality control throughout the project execution. All equipment and materials must meet Buy America Act requirements per Title 2 CFR Part 184. Contractor responsibilities include proper grounding of all equipment and cabinets using minimum No. 4 copper conductors connected to ground rods, installation of tracer wire in all conduits with appropriate color coding (red for power, orange for communications in KDOT areas; yellow and blue respectively in KC Scout areas), and placement of in-ground locate test stations at specific intervals. The project requires extensive documentation including monthly GPS location reports with decimal degree accuracy within three feet, cable tagging with site and device identification, and submission of actual cabinet elevation drawings prior to installation. Payment terms are structured as lump sum site items with incidental costs for utility coordination, material restoration, seeding, and equipment storage. The KDOT ITS Engineer must receive minimum three working days notice for initial commissioning and seven working days notice for site visits, with final project completion requiring contractor coordination for one-call locates of newly constructed facilities prior to acceptance.

View the file

Other files for this state and local contract opportunity

Other files attached to Web-Based Preparedness Application, newest first.
File Type Posted
EVT0010848_-_RFP_Document.pdf PDF
Bid_Amendment_-_EVT0010848_-_Bid_Amendment_2.pdf PDF
Bid_Amendment_-_EVT0010848_-_Bid_Amendment_1.pdf PDF
EVT0010853_-_Bid_Documents.pdf PDF
Web-Based_Preparedness_Application.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT TO SCALE

CCTV / DETECTOR

PROPOSED

BUTTERFLY

PROPOSED DUAL-SIDED DMS

BUTTERFLY

EXISTING DUAL-SIDED DMS

TWO-POST ROADSIDE

PROPOSED DMS

CONDUIT (KDOT)

EXISTING FIBER AND

(FOR THIS SHEET ONLY)

LEGEND

CONDUIT (KDOT)

PROPOSED FIBER AND

BUTTERFLY

PROPOSED SINGLE-SIDED DMS

emphasize actual project limits

Device Overview Sheet shall

Note to Designer:

OLIVER AVE

K-96 E OF

SITE 3

MT VERNON ST

I-135 NB AT

SITE 2

CABINET

NORTH HUB

HUB CABINET

JUNCTION

CABINET

SOUTH HUB

HARRY ST

I-135 SB AT

SITE 8

K-96

K-96

K-42

K-15

K-15

K-254

TMC

S HOOVER RD

K-42 AT

SITE 6

MERIDIAN AVE

I-235 E OF

SITE 7

WEST HUB CABINET

SITE 9

K-96 AT REDBUD TRAIL

SITE 1

CABINET

EAST HUB

GREENWICH RD

K-96 W OF

SITE 4

DEVICE OVERVIEW EXAMPLE

FHWA APPROVAL

DESIGNED

ITS-D00

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

AJS

I T S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c o m

-J

A N -2

:0

01-09-26

DETAILED

DESIGN CK. DETAIL CK.

APP'D.

QUANTITIES

QUAN.CK.

TRACED

TRACE CK.

K-96 AT N WEST ST

SITE 5

Sh. No.

K D

O T G ra p h ic s C e rt if ie d

KDOT Graphics Certified 01-12-2026

XXX-XXX

Sh. No.

Multimode Fiber Optic

Nominal

Parkway

RT

Sta.

ABBREVIATIONS

XX

XX

F&I Furnish And Install

MM Mile Marker

Mile Marker

Fiber Optic Cable Splice Vault without Splice, by Others (CL, KTA, Etc)

Fiber Optic Cable Splice Vault with Splice, by Others (CL, KTA, Etc)

EXISTING DEVICES ARE SHOWN IN PLANS USING HALFTONE/GRAYSCALE

Ramp Meter

Flashing Beacon

6'x6' Loop Detector

6'x10' Loop Detector

6'x30' Loop Detector

Dynamic Message Sign, Ground Mounted (Butterfly, Dual Face)

Dynamic Message Sign, Truss Mounted

CCTV Camera

Radar Vehicle Detector

Radar Vehicle Detection Area

ITS Cabinet with Foundation

Pole Mounted ITS Cabinet

Fiber Optic Cable Splice Vault without Splice

Fiber Optic Cable Splice Vault with Splice

Pull Box

Guy Wire

Dynamic Message Sign, Ground Mounted (Butterfly)

Dynamic Message Sign, Ground Mounted (Dual Post)

L.P.

Underground Power

Category 6 Twisted Pair Ethernet Cable

SIG Traffic Signal

CAT 6

Southbound

Road Weather Information System

Wireless Communication Tower/Pole

New ITS Field Component

Light Pole

Power Pole

Power Supply Assembly

Power Transformer

Power Overhead Source

Power Underground Source

Removal

Sign, Existing

Telephone Pole

Trees, Existing

Truss Sign

City Limits

Conduit, Existing

Conduit, Bored, Proposed

Conduit, On Structure, Proposed

Conduit, Trenched, Proposed

Construction Limits

LEGEND

Above Ground

Approximate

Avenue

Boulevard

Back of Curb

Board of Public Utilities

Bandwidth Manager

Conductor

ITS Cabinet Assembly

Camera Control Receiver

Closed Circuit Television Camera

Coaxial

Communications

Concrete

Center

Detector

Digital Input/Output

Distribution

Dynamic Message Sign

Drive

Each

Eastbound

Edge of Pavement

Edge of Shoulder

Edge of Travel Way

Existing

Fiber Distribution UnitFDU

Exist.

EOTW

EOS

EOP

EB

Ea.

Dr.

DMS

Dist.

DIO

DET

Ctr.

Conc.

Comm.

Coax.

CL

CCTV

CCR

CA

C

BWM

BPU

BOC

Blvd.

Ave.

Approx.

AG Flex.

FO

FT

FTC

HAR

HDPE

HH

Hwy.

IN

I/O

ITS

KDOT

KTA

Ln.

LS

LT

Min.

MMFO

MP

MPH

NB

No.

Nom.

PB

Pkwy.

POP

Flexible

Fiber Optic

Feet

Field Traffic Controller

Highway Advisory Radio

High Density Polyethylene

Handhole (Splice Vault)

Highway

Inch

Input/Output

Intelligent Transportation System

Kansas Department of Transportation

Kansas Turnpike Authority

Lane

Lump Sum

Left

Minimum

Milepost

Miles per Hour

Northbound

Number

Pull Box

Point of Presence

PP

PS

PVC

Rd.

Req'd.

RMC

Rte.

R/W

SB

SMFO

St.

SV

SW

TB

TMC

Trfwy.

Typ.

Truck

UIP

UP

SOP

VDS

WB

XFMR

Power Pole

Power Supply/Assembly

Polyvinyl Chloride

Road

Required

Rigid Metal Conduit

Right

Route

Right-of-Way

Single-mode Fiber Optic

Street

Station

Splice Vault

Sidewalk

Transition Box

Traffic Management Center

Trafficway

Typical

Truckline

Use In Place

Source Of Power

Vehicle Detection Station

Westbound

Transformer

CenturyLink/Lumen

Dynamic Message Sign, Trailer Mounted

Easement, Permanent

Easement, Temporary

Telephone Cable

Fiber Optic Cable

Gas Line

Fiber Optic Cable, Existing

Gas, Existing

Telephone, Existing

Guard Rail, Existing

Guard Rail, Proposed

Hedge, Existing

Marsh

Power, Existing

Property Line

Railroad, Existing

R/W, Existing

R/W, Existing Access Control

R/W, Access Control

Township, Section or Grant Line

State/County Line

Culverts, Existing

Drop Inlet & Storm Sewer, Existing

Fence, Existing

LEGEND AND ABBREVIATIONS

ITS-D01

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

01-09-26 2025 KDOT Standards Updates JAN 01 AJS

S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

Temp Esmt.

Perm Esmt.

Exist R/W

PoP Building

Roadside Unit (C-V2X)

Automated Gate

K D

O T G ra p h ic s C e rt if ie

GENERAL NOTES

CCTV lowering device.

The Contractor shall install detectors and antennas so as to not interfere with the37.

and the DMS orientation detail.

CCTV cameras and DMS shall be oriented according to the CCTV orientation detail36.

placement of camera poles.

so that they are not directly beneath the camera. The Engineer shall approve and would not expose workers to traffic. Pole mounted cabinets shall be installed operations is: not on the downhill side of a slope, not directly beneath the camera, CCTV poles should be oriented so that pole handhole used for camera lowering 35.

items necessary are in place to provide a fully functioning DMS system.

conduit, pull boxes, controller assemblies, power supply assemblies, and all other

DMS shall not be attached to the support posts until the supporting systems of34.

installation.

Any modifications to the design require the approval of the ITS engineer prior to they will provide for the correct height of the overall DMS structure when installed.

elevations of DMS foundations, pole lengths, and site conditions to ensure that

Prior to installing DMS support structures, the Contractor shall verify final33.

in kind by the Contractor, with no additional payment.

existing improvements removed or damaged by the Contractor shall be replaced any existing conductors or other facilities damaged during construction. All

It shall be the Contractor's responsibility to repair any existing conduit and replace32.

repair".

additional details. Repairs will be paid for under ITS unit cost item "conduit

Contractor to inspect and repair existing conduit. See conduit specifications for31.

parallel shall share the same trench.

Warning tape is required in all trenches containing conduit. Multiple conduits in 30.

power drop locations for all proposed equipment.

Contractor shall not begin work at any site until power company has confirmed 29.

listed on the electrical service location summary sheet.

completion. Utility company, contact name, and phone number for each site are possession of electrical bills 60 days after KDOT inspector has signed off on site company fees until KDOT or KC Scout assumes ownership. KDOT will take the locations shown on the plans. Contractor shall make payment of all power

KDOT's name when in KDOT area or KC Scout's name when in KC Scout area at

Contractor shall be responsible for ordering and paying for any electrical service in 28.

the Engineer.

equipment, cabinet, and ground rods per applicable standards or as directed by installation of all project materials. The Contractor shall properly ground all

(NEC) and manufacturer specifications. Follow applicable NEC requirements for

All grounding systems shall be in accordance with the National Electric Code 27.

responsibility of the parties controlling the physical performance of the work.

around high voltage lines or other utility structures as these items are the equipment, sequencing of work, and safety practices used when working in, on, or requirements. KDOT has no control over the means, methods, choice of performed in conformance with all state, local, federal, utility, and contract

High voltage power lines may be within the project limits. All work is to be 26.

When within 5 ft of KDOT lighting facilities, conduit shall be hand dug.25.

CenturyLink/Lumen inspector present.

allowed when performing work with CenturyLink/Lumen while KDOT and and 5 ft of clearance from CenturyLink/Lumen and / or KTA fiber. Exception

Contractor to maintain at least 20 ft of clearance from all existing gas facilities 24.

coordinated with Lumen and KTA. Hydro excavation is allowed.

All work within 10 ft of CenturyLink/Lumen and/or KTA fiber backbone shall be 23.

present.

or splice vault for any reason without a CenturyLink/Lumen and/or KTA inspector

At no time shall the Contractor access a CenturyLink/Lumen and/or KTA pullbox 22.

facilities.

applicable, and KDOT inspector must be present for work within 5 ft of fiber optic

CenturyLink/Lumen or KTA backbone fiber. A CenturyLink/Lumen, KTA when weeks and again at 72 hours prior to performing any work within 5 ft of a

Contractor shall notify CenturyLink/Lumen and/or KTA when applicable two 21.

power supply poles at the right-of-way line/fence when possible.

from plan location must be approved by the Engineer. Locate transformers and

Transformer locations as shown have appropriate clear zone protection. Variation 20.

must be approved by the Engineer.

from back of guard rail to face of equipment pole. Variation from plan location equipment poles shall be located such that there is a minimum of 7 ft of clearance

Where applicable, and when ITS poles are to be placed near existing guardrail, ITS

ITS equipment pole locations as shown have appropriate clear zone protection. 19.

during this period.

the Notice to Proceed (NTP). The Contractor will not be charged working days surveying operations may begin after th contract is signed, but prior to issuing

With the Engineer's approvl, the off-loading of KDOT provided equipment and18.

designated KDOT facility.

Installation, testing, and integration of all ITS devices, including KDOT furnished 17.

designated KDOT facility.

shall coordinate with the Engineer and manufacturer for a storage location at a facility, installation, and testing in accordance with the specifications. Contractor equipment, shall include all loading and transportation from a designated KDOT furnished, including DMS, CCTV assemblies, detectors, and communications

All ITS equipment called out by plans and specifications as "install" or KDOT 16.

to the site bid item.

incidental items at the arranged storage location. This item of work is incidental means to unload and load KDOT/KTA furnished DMS signs, cabinets and furnished DMS signs, cabinets, and incidental items. Contractor shall provide the

Contractor shall coordinate with the Engineer a location to store KDOT/KTA15.

furnished items.

Contractor shall carefully review plans and specifications for details on KDOT

KDOT will furnish hardware as decribed in the plans and specifications.14.

All traffic control plans and lane closures shall be pre-approved by the Engineer.13.

by the Contractor per KDOT's utility accommodation policy.

Bridge attachments require a separate permit from KDOT that shall be obtained 12.

of conduit.

determine the types and extent of incidental items to be included in the unit price junction boxes) for all externally mounted conduits prior to submittal of bid to mounting hardware (including bridge hangers, fittings, expansion joints and

The Contractor shall field review conduit on structure for necessary routing, 11.

to right-of-way line.

route trunkline conduit adjacent to right-of-way line and branch line perpendicular locator service markings, to prevent conflicts with existing utilities. Contractor to based on actual field conditions prior to construction at each site, including utility right-of-way to the extent possible. The Contractor shall determine final routing

Conduit shall be installed in straight lines either parallel or perpendicular to the 10.

approved by the Engineer prior to placing the cabinet.

strength measurements to Engineer prior to installation. The location shall be ensure connectivity to the cellular network. Contractor shall submit signal

Contractor shall check cellular connection at the specific cabinet location(s) to 9.

the project and no additional payment will be made.

equipment. Any restaking necessitated by adjustment is considered incidental to

KDOT ITS Engineer prior to revising the plan location or orientation of any ITS location sensitive. The Contractor and Engineer shall receive approval from the obstructions. DMS, CCTV camera, detector, and wireless equipment locations are and may be modified to avoid conflicts with underground utilities or other

Engineer prior to placement. Proposed ITS equipment locations are approximate surveyors leave each site. Orientation of all cabinets shall be approved by the boxes must be approved by the Engineer prior to construction and before

Placement of all DMS and CCTV foundations, cabinets, transformers, and pull 8.

foundations, cabinets, power services, pull boxes, and splice vaults.

Survey and stake all ITS device locations including, but not limited to: poles, 7.

services at (913) 895-1806.

location services. When in Johnson County, also call Water One locate request contact any and all utilities and local government agencies not participating in lighting and ITS (fiber, other) be marked in that area. The Contractor shall also area. The Contractor shall call the KDOT Field Engineer to request that KDOT

811 or 1-800-344-7233 (1-800-DIG-SAFE) to request the utilities be marked in that

Prior to beginning any construction activities, the Contractor shall call dig safe at 6.

otherwise noted.

The Contractor shall adhere to KDOT's utility accommodation policy unless

Contractor shall contact the Engineer upon determination of any utility conflicts.

lighting and fiber, in the field prior to initiation of construction per site. The

Contractor shall determine any conflicts with existing utilities, including KDOT 5.

Contractor and may change at no additional cost to KDOT.

area will be up to 1 acre but is based on the construction methods of the to the construction per lump sum site. It is anticipated that the total disturbed specifications for cool grass mix design. Seeding shall be considered incidental lbs/acre. Seeding shall be completed in accordance with KDOT standard

Seeding mix shall be tall fescue (endophyte free) pure live seed (PLS), 220 4.

is incidental to the site bid item.

provided according to the KDOT utility accommodation policy. This item of work prevent ponding. Adequate temporary protection against erosion shall be required by the Engineer. All grading work shall slope away from foundations to debris from the work area according to the KDOT standard specifications and as includes seeding, fertilizing, mulching, and the removal of all unused material and

Contractor shall be responsible for restoring all disturbed work areas. Restoration 3.

original condition. No additional payment will be made.

irrigation systems disturbed during construction activities shall be restored to the work with the Engineer to provide mitigation solutions. Any landscaping or landscaped features and irrigation systems existing within the right-of-way, or

In urban settings, contractor shall maintain an appropriate clearance from all 2.

devices within the existing roadway right-of-way.

responsibility of the Contractor to verify and keep installation of all equipment and

All work will be confined within the existing roadway right-of-way. It is the 1.

etc.).

traffic control, immediate removal of materials, removal of equipment each night, urban areas) additional special considerations may be required (e.g. temporary behind the first post of the end terminal). At limited right of way locations (e.g.

equipment must be located at the back of the ROW, behind guardrail (e.g. 50 feet longer term storage is arranged with the Engineer. Overnight storage of

Stockpiles shall be temporary in nature and removed as soon as practical unless obstruction to vehicular or pedestrian traffic or interfere with surface drainage.

locations will only be allowed in a location that will not cause damage or circumstances) and as far to the edge of the right-of-way as possible. Storage is permitted, then it must be located beyond the Clear Zone (e.g. 55' in most

Engineer and Area Utility Coordinator prior to storage. If such storage or parking no other alternative is available. All storage locations shall be coordinated with the

Freeway, or Highway Right-of-Way will not be permitted on the right-of-way unless equipment and vehicles when not used in actual utility work within the Interstate, Storage of materials, such as rock that has been excavated, and parking of 49.

considered subsidiary to the bid item for installation of multiduct/conduit.

similar) shall be used. This work will not be paid for separately but will be

(meeting FA-A or FA-B requirements or similar) or clean rock (meeting CA-5 or limits and suitable backfill. If outside material is neded for adequate backfill sand trench width. The Engineer shall make the final determination on overbreakage as backfill within 12" in any direction of the multiduct/conduit for at least the greater than 4" or sharp-edged rock) expansive clay or non-durable shale be used damage the conduit shall not be used. In no case shall large or sharp rock, (e.g.

methods approved by the Engineer. Compaction methods or equipment that

(MR-90) specification. Each layer shall be mechanically compacted by means and specified by the manufacturer (e.g. A-1 designated backfill) compacted to Type B shall be used. Suitable material for backfill shall generally be considered as material is not available in the trench excavation for this backfill ouside materials material either from the trench excavation or from outside. If suitable granular requirements. This extra depth excavation shall be backfilled with suitable encountered, the contractor shall contact the Engineer to determine backfill

Where rock, hardpan, shale, expansive clay or other unyielding material is 48.

to be installed more than 7 feet from the ROW, contact the engineer.

Contractor shall install the conduit within the utility corridor. If the conduit needs 47.

commissioning, grounding, and patch panel installation.

installation, fiber splicing and testing of devices and infrastructure. For example, The KDOT ITS Engineer must be notified at least 3 working days prior to the initial 46.

requirements on sheet ITS-SMD.

For 7-way microduct installation, refer to boring method and locator ball 45.

discretion of KDOT.

be removed from the project or the material accepted at a reduced price at the unaccepted materials will be performed at the Contractor's risk. Such material will

Incorporate only tested or approved material into the project. Any work utilizing 44.

existing tracer wire and test station is working properly.

coordinate with KDOT ITS to perform an initial one-call locate to ensure new and

After final project completion and prior to project acceptance Contractor shall 43.

needed for access to KDOT facilities (e.g. POP buildings, TMC, etc.)

commissioning, requested site visits, etc. A minimum of 3 working days notice is

The Contractor shall provide a minimum of 7 working days notice for 42.

part 184 of Code of Federal Regulations.

All material shall meet the Buy America Act Requirements outlined in Title 2 CFR 41.

be made.

and contingency plans are incidental to the site bid and no additional payment will controlled demolition special provisions. Controlled demolition, demolition plans, demolition plans to the Field Engineer per KDOT specifications and per KDOT and butterfly structures is a controlled demolition. Contractor shall submit

Controlled demolition: the removal of existing static sign structures, cantilever, 40.

Engineer.

reports with GPS coordinates of newly installed conduit and vaults to the ITS during construction and until final acceptance. Contractor will provide monthly

Contractor is responsible for one-call locates of the newly constructed facilities 39.

GPS Location Excel Spreadsheet for all installed devices.

box prior to placing backfill material. Contractor shall complete the KDOT-provided decimal degrees) and three tie-point measurements for each buried electrical pull of the GPS readings shall be within 3 ft. Obtain GPS (latitude and longitude in vaults, cabinets, power meters, transformers, and wireless towers. The accuracy latitude and longitude for all installed devices (DMS, CCTV, DET), pull boxes, splice

The Contractor shall provide KDOT an Excel spreadsheet of GPS readings in 38.

ITS GENERAL NOTES

ITS-D02

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

Sh. No.

K D

O T G ra p h ic s C e rt if ie

KDOT Graphics Certified 01-13-2026

K075NBC-151.41

CL/L-AP1001

FOR KDOT INSTALLATIONS

DEVICE LEGEND

CABLE, CONDUIT, AND

FHWA APPROVAL

DESIGNED

ITS-D03A

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

S -D

A .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

K 075 NB C

PEDESTAL FOR POWER CO. SERVICE

5 FT AT EACH POWER POLE OR POWER

5 FT AT EACH DMS

5 FT AT EACH CCTV

5 FT AT EACH ITS CABINET ASSEMBLY

(LOAD AND SERVICE SIDE)

5 FT AT EACH POWER SUPPLY ASSEMBLY

C A

B L E

C A

T

CATEGORY 6 CABLE

CONDUIT (FT) CABLE (FT)

FROM TO

D I S

T A

N C

E

C T

R T

O C

T R

(FT)

TRENCHED BORED

STRUCTURE

ON

POWER COMM. DETECTOR DEVICE

4321FIBER OPTIC543212S3B2BSTXT3T2T1T

I

N

I

N

I

N

X

S P

A R

E

I

N

I

N

I

N

G R

E E

N

R E

D

G R

E E

N

R E

D

B L

A C

K

G R

E E

N

R E

D

G R

E E

N

R E

D

G R

E E

N

R E

D

G R

E E

N

R E

D

R M

C

I

N

X

X

X

X

S M

F O

12 XX

S M

F O

X X C

C T

V

D M

S

V D

S

CONDUIT AND / OR CABLE RUN CARRIES OVER TO ADJACENT SHEETS

TOTAL

MAX. HEIGHT OF DETECTOR ON POLE ASSUMED AT 25 FT FOR CABLE QUANTITIES

NOTES:

INCLUDED IN TABLE

ADDITIONAL CONDUIT QUANTITIES

CONDUIT SYMBOL LEGEND

SB

3B

2B

ST

XT

3T

2T

1T

TRENCHED

BORED

ADDITIONAL CABLE QUANTITIES INCLUDED IN TABLE

POWER CABLES

FIBER OPTIC TRUNKLINE CABLES (XX SMFO)

25 FT AT EACH PULL BOX (WHEN NOT SPLICING)

FOR FUTURE USE

100 FT AT EACH SPLICE VAULT

SPLICE VAULT WHEN SPLICING

50 FT FROM EACH DIRECTION AT EACH

FIBER OPTIC BRANCH CABLES (XX SMFO)

EXCEED 328 FEET IN LENGTH.

ENGINEER'S DISCRETION TO ENSURE RUNS DO NOT

THESE QUANTITIES MAY BE ADJUSTED AT THE STATE ITS

10 FT COIL AT EACH MID-RUN PULL BOX

5 FT COIL EACH AT PULL BOX WHERE SPLICED TO LOOP WIRE

10 FT COIL AT EACH ITS CABINET

SB

S P

A R

E

I

N B

L A

C K

2 IN RMC

X-WAY MICRODUCT

X IN (HDPE)

(HDPE)

2 IN SPARE

3 IN (HDPE)

2 IN (HDPE)

(HDPE)

2 IN SPARE

X-WAY MICRODUCT

X IN (HDPE)

3 IN (HDPE)

2 IN (HDPE)

1 IN (HDPE)

specifications for details.

wire unless stranded is required for better flexibility. See ITS

For all power and communications conduit, install solid tracer 9.

will be made.

considered incidental to the project and no additional payment does not include the required ground wire. Ground wire is electrical cables. The number of conductors listed in the table

Ground wire is required to be installed for conduits with 8.

equivalent.

designated by their rounded nominal inch (in) diameter

All conduit sizes are industry standard English size conduit 7.

will be made.

considered incidental to the project and no additional payment shall cut off and discard the first 10 ft of the cable. This 10 ft is

After pulling fiber optic cable through the boxes, the Contractor 6.

foot.

as given on this sheet, and are rounded up to the nearest whole

Total lengths of conduit and cable include additional quantities 5.

accommodated in cable quantities and are incidental.

nearest whole foot. Grade elevation changes are not

Center to center horizontal distances are rounded up to the 4.

be rigid metal (RMC), unless otherwise noted.

Trenched conduit shall be HDPE, and conduit on structures shall 3.

All lengths in tables are measured in feet.2.

consistent across sites within the same project.

Table may be modified to fit project needs. Tables shall be 1.

SLACK BACK TO NEAREST PULL BOX.

SLACK IN THE CABINET AND SHALL PULL ALL EXCESS

CONTRACTOR SHALL LEAVE A MINIMUM OF 2 FT OF

DISTANCE.

QUANTITIES SHOWN INCLUDE SLACK AND VERTICAL

50 FT COIL AT EACH OVERHEAD DMS

25 FT COIL AT EACH ROADSIDE DMS

5 FT COIL AT EACH PULL BOX

10 FT COIL AT EACH ITS CABINET ASSEMBLY

10 FT COIL AT EACH TRANSFORMER

8 FT COIL AT SERVICE PEDESTAL (TYPE 2)

36 FT COIL AT SERVICE POLE (TYPE 2)

7 FT COIL AT TYPE 2 SERVICE SIDE

7 FT COIL AT TYPE 2 LOAD SIDE

36 FT COIL AT TYPE 1 SERVICE POLE

50 FT AT EACH POWER SUPPLY ASSEMBLY

EXCESS SLACK BACK TO THE NEAREST PULL BOX.

OF SLACK IN THE CABINET AND SHALL PULL ALL

CONTRACTOR SHALL LEAVE A MINIMUM OF 2 FT

FOR FUTURE USE

25 FT AT EACH PULL BOX OR SPLICE VAULT

VAULT WHEN SPLICING

100 FT FROM EACH DIRECTION AT EACH KDOT SPLICE

50 FT AT EACH ITS CABINET LOCATION

REQUIREMENTS IN SPECIFICATIONS.

CONTRACTOR TO FOLLOW SLACK

ARE FOR THE DESIGN ENGINEER'S ESTIMATE ONLY.

* ADDITIONAL QUANTITIES ADDED TO THE TABLE

CODE.

THE PROVIDER'S SPLICE POINT USING THEIR ID

A THIRD PARTY PROVIDER'S SPLICE POINT, LABEL

** WHEN SPLICE VAULT IS LOCATED ADJACENT TO

EB - Eastbound, WB - Westbound

NB - Northbound, SB - SouthboundDirection:

Route: US 75

LETTERS FOR CAMERAS AND DETECTORS.

VAULTS AND PULL BOXES. USE SEQUENTIAL

POST. USE SEQUENTIAL NUMBERS FOR SPLICE

THERE ARE MULTIPLE DEVICES AT THE SAME MILE

* ONLY USE SEQUENTIAL NUMBERS OR LETTERS IF

Z - Zayo IDEA - Ideatek L - CenturyLink/Lumen KTA - Kansas Turnpike Authority K - Kansas DOTAgency:

XXX.XX

Mile Post or Reference Marker

X-

Sequential Number or Letter*

PP - Power Pole

PB - Pull Box

CT - Trailer Camera

CA - ITS Cabinet

C - Camera (CCTV)

BT - Bluetooth

AG - Automated Gate

Device:

DEVICE ID CODE LEGEND

V - Vehicle Detection Station

T - Transformer

SV - Splice Vault**

ST - Trailer DMS

S - Sign (DMS)

RS - RWIS Sensor

PS - Power Supply / Assembly

CCTV/DMS/VDS CABLES

POLE HEIGHT (VARIES) AT EACH POLE

10 FT COIL AT EACH PULL BOX

5 FT COIL AT EACH DEVICE

10 FT COIL AT EACH ITS CABINET

REQUIREMENTS IN SPECIFICATIONS.

CONTRACTOR TO FOLLOW SLACK

ARE FOR THE DESIGN ENGINEER'S ESTIMATE ONLY.

* ADDITIONAL QUANTITIES ADDED TO THE TABLE

ON STRUCTURE2S

From Device No.

To Device No.

Center Distance

Device Center to Number of

Size and

Structure

Conduits on

6 Cable

Total Length of Category Size, Color, and Number of

Conduits in Trench and

Size, Color

Bore

Conduits in

Number of

Power Cable Size Cable

Fiber Optic

Fiber Count CCTV/DMS/VDS

CONDUIT AND CABLE ROUTING TABLE

Device-Specific

Cables

XB

* FOR EXAMPLE 7-WAY MICRODUCT, UTILIZE "7" IN PLACE OF "X", SO IT WILL BE "M7T".

Sh. No.

MXT*

MXB*

K D

O T G ra p h ic s C e rt if ie

K075NBC-05

PB075-02-08

KDOT075-01

075K NB C 05-

075 02 08- -PB

075 01-KDOT

NOTES:

Route: US 75

State: K-Kansas

Route: US 75

Device: PB - Pull Box

Route: US 75 specifications for details.

wire unless stranded is required for better flexibilty. See ITS

For all power and communications conduit, install solid tracer 9.

will be made.

considered incidental to the project and no additional payment does not include the required ground wire. Ground wire is electrical cables. The number of conductors listed in the table

Ground wire is required to be installed for conduits with 8.

equivalent.

designated by their rounded nominal inch (in) diameter

All conduit sizes are industry standard English size conduit 7.

will be made.

considered incidental to the project and no additional payment shall cut off and discard the first 10 ft of the cable. This 10 ft is

After pulling fiber optic cable through the boxes, the Contractor 6.

foot.

as given on this sheet, and are rounded up to the nearest whole

Total lengths of conduit and cable include additional quantities 5.

accommodated in cable quantities and are incidental.

nearest whole foot. Grade elevation changes are not

Center to center horizontal distances are rounded up to the 4.

be rigid metal (RMC), unless otherwise noted.

Trenched conduit shall be HDPE, and conduit on structures shall 3.

All lengths in tables are measured in feet.2.

consistent across sites within the same project.

Table may be modified to fit project needs. Tables shall be 1.

Number of

Size and

Structure

Conduits on

6 Cable

Total Length of Category

C A

B L E

C A

T

From Device No.

To Device No.

Center Distance

Device Center to Size, Color, and Number of

Conduits in Trench and

Size, Color

Bore

Conduits in

Number of

Power Cable Size Cable

Fiber Optic

Fiber Count CCTV/DMS/VDS

Device-Specific

Cables

CONDUIT AND CABLE ROUTING TABLE

CONDUIT (FT) CABLE (FT)

FROM TO

D I S

T A

N C

E

C T

R T

O C

T R

(FT)

TRENCHED BORED

STRUCTURE

ON

POWER COMM. DETECTOR DEVICE

4321FIBER OPTIC543212S3B2BSTXT3T2T1T

I

N

I

N

I

N

X

S P

A R

E

I

N

I

N

I

N

B L

A C

K

Y E L L

O W

B L

U E R

M C

I

N

X

X

X

X

S M

F O

12 XX

S M

F O

X X C

C T

V

D M

S

V D

S

CONDUIT AND / OR CABLE RUN CARRIES OVER TO ADJACENT SHEETS

TOTAL

MAX. HEIGHT OF DETECTOR ON POLE ASSUMED AT 25 FT FOR CABLE QUANTITIES

SB

S P

A R

E

I

N B

L A

C K

T - Transformer FB - Flashing Beacon

PS - Power Supply Assembly VR - Mainline Radar Detection

PP - Power Pole S - Sign (DMS)

- Ramp Detector (Loop)RV CA - ITS Cabinet

RM - Ramp Meter C - Camera (CCTV)

BT - BluetoothDevice:

Device Number

DEVICE ID CODE LEGEND

Sequential Number

Device Number (Match Cabinet No.)

EB - Eastbound, WB - Westbound

NB - Northbound, SB - SouthboundDirection:

CL - CenturyLink/Lumen Splice Vault

KDOT - KDOT Splice Vault

KDOT Splice Vault No.

FOR KC SCOUT INSTALLATIONS

DEVICE LEGEND

CABLE, CONDUIT, AND

FHWA APPROVAL

DESIGNED

ITS-D03B

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

S -D

B .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

PEDESTAL FOR POWER CO. SERVICE

5 FT AT EACH POWER POLE OR POWER

5 FT AT EACH DMS

5 FT AT EACH CCTV

5 FT AT EACH ITS CABINET ASSEMBLY

(LOAD AND SERVICE SIDE)

5 FT AT EACH POWER SUPPLY ASSEMBLY

INCLUDED IN TABLE

ADDITIONAL CONDUIT QUANTITIES

REQUIREMENTS IN SPECIFICATIONS.

CONTRACTOR TO FOLLOW SLACK

ARE FOR THE DESIGN ENGINEER'S ESTIMATE ONLY.

* ADDITIONAL QUANTITIES ADDED TO THE TABLE

CATEGORY 6 CABLE

ADDITIONAL CABLE QUANTITIES INCLUDED IN TABLE

POWER CABLES

FIBER OPTIC TRUNKLINE CABLES (XX SMFO)

25 FT AT EACH PULL BOX (WHEN NOT SPLICING)

FOR FUTURE USE

100 FT AT EACH SPLICE VAULT

SPLICE VAULT WHEN SPLICING

50 FT FROM EACH DIRECTION AT EACH

FIBER OPTIC BRANCH CABLES (XX SMFO)

EXCEED 328 FEET IN LENGTH.

ENGINEER'S DISCRETION TO ENSURE RUNS DO NOT

THESE QUANTITIES MAY BE ADJUSTED AT THE STATE ITS

10 FT COIL AT EACH MID-RUN PULL BOX

5 FT COIL EACH AT PULL BOX WHERE SPLICED TO LOOP WIRE

10 FT COIL AT EACH ITS CABINET

SLACK BACK TO NEAREST PULL BOX.

SLACK IN THE CABINET AND SHALL PULL ALL EXCESS

CONTRACTOR SHALL LEAVE A MINIMUM OF 2 FT OF

DISTANCE.

QUANTITIES SHOWN INCLUDE SLACK AND VERTICAL

50 FT COIL AT EACH OVERHEAD DMS

25 FT COIL AT EACH ROADSIDE DMS

5 FT COIL AT EACH PULL BOX

10 FT COIL AT EACH ITS CABINET ASSEMBLY

10 FT COIL AT EACH TRANSFORMER

8 FT COIL AT SERVICE PEDESTAL (TYPE 2)

36 FT COIL AT SERVICE POLE (TYPE 2)

7 FT COIL AT TYPE 2 SERVICE SIDE

7 FT COIL AT TYPE 2 LOAD SIDE

36 FT COIL AT TYPE 1 SERVICE POLE

50 FT AT EACH POWER SUPPLY ASSEMBLY

EXCESS SLACK BACK TO THE NEAREST PULL BOX.

OF SLACK ON THE CABINET AND SHALL PULL ALL

CONTRACTOR SHALL LEAVE A MINIMUM OF 2 FT

FOR FUTURE USE

25 FT AT EACH PULL BOX OR SPLICE VAULT

VAULT WHEN SPLICING

100 FT FROM EACH DIRECTION AT EACH KDOT SPLICE

50 FT AT EACH ITS CABINET LOCATION

CCTV/DMS/VDS CABLES

POLE HEIGHT (VARIES) AT EACH POLE

10 FT COIL AT EACH PULL BOX

5 FT COIL AT EACH DEVICE

10 FT COIL AT EACH ITS CABINET

REQUIREMENTS IN SPECIFICATIONS.

CONTRACTOR TO FOLLOW SLACK

ARE FOR THE DESIGN ENGINEER'S ESTIMATE ONLY.

* ADDITIONAL QUANTITIES ADDED TO THE TABLE

B L

U E

Y E L L

O W

B L

U E

Y E L L

O W

B L

U E

Y E L L

O W

B L

U E

Y E L L

O W

B L

U E

Y E L L

O W

CONDUIT SYMBOL LEGEND

SB

3B

2B

ST

XT

3T

2T

1T

TRENCHED

BORED

2 IN RMC

X-WAY MICRODUCT

X IN (HDPE)

(HDPE)

2 IN SPARE

3 IN (HDPE)

2 IN (HDPE)

(HDPE)

2 IN SPARE

X-WAY MICRODUCT

X IN (HDPE)

3 IN (HDPE)

2 IN (HDPE)

1 IN (HDPE)

ON STRUCTURE2S

XB

MXT*

MXB*

* FOR EXAMPLE 7-WAY MICRODUCT, UTILIZE "7" IN PLACE OF "X", SO IT WILL BE "M7T".

K D

O T G ra p h ic s C e rt if ie

ITS EXAMPLE QUANTITIES

ITS-D03C

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

10-06-23 2023 KDOT Standards Updates JAN 00

BY

S -D

C .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

INFORMATION ONLY

QUANTITIES ON THIS SHEET ARE SHOWN FOR

INTELLIGENT TRANSPORTATION SYSTEM (ITS) SITE

NOTE:

K D

O T G ra p h ic s C e rt if ie

2T

2T 2S

2T

2T

2T

2T 2B

2T

2T

2T

2T

2T

2T 2T

2T

2T

ITS EXAMPLE PLAN

ITS-D03D

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

12-30-20 2020 KDOT Standards Updates JAN 00

BY

S -D

D .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:1

QUAN.CK.

S P

A R

E

C A

B L E

C A

T

400'

364' 2

310'

131'

92'

49'

150'

215'

75'

125'

239'

122B

85'

62'

265'

K035NBCA-151.51

K035NBPS-151.55

K035NBCA-151.51

K035NBS-151.51

NOTE TO DESIGNER:

R/W

R/W

Fiber Optic Cable

R/W

M A

X

SOP BY ABC POWER

I-35 NB

I-35 SB

OP

O V

E R P

A S S -R

O A

D N

A M

E

R/W

CONDUIT AND CABLE ROUTING TABLE

CONDUIT (FT) CABLE (FT)

TRENCHED BORED

STRUCTURE

ON

POWER COMM. DETECTOR DEVICE

FROM TO

D I S

T A

N C

E

C T

R T

O C

T R

(FT)

1T

I

N

R E

D

G R

E E

N

2T

I

N

R E

D

G R

E E

N

R E

D

G R

E E

N

I

N

3T XT

X

R E

D

G R

E E

N

ST

I

N B

L A

C K

R E

D

I

N

G R

E E

N

I

N

R E

D

G R

E E

N 2 I

N

R M

C

X

2 3

X

X

X

FIBER OPTIC

12 XX

S M

F O

S M

F O

X X

1 2 3 4

V D

S

D M

S

C C

T V

K035SBSV-151.18

K035SBCA-151.19

K035SBCA-151.19

TOTAL

1588 362

185 1822

74'

SB

S P

A R

E

I

N B

L A

C K

9 1060 1 2 3 4 1065 6 7 8 9 1 2 3 4 6 7 8 9 1 2

CONSTRUCTION NOTES:

contract.

Coordination and all required work shall be subsidiary to other items of the shall be coordinated between KDOT, Bluestem Electric, and ITS contractor.

Electric will pull their own conductor from power pole to transformer. This work transformer (south side) provided and installed by Bluestem Electric. Bluestem

ITS contractor to install empty 3" HDPE from power pole (north side) to new 8.

For fiber overview and details, see sheets 59-63.7.

sheet 7.

Site shall be paid for by the lump sum. For a summary of site quantities, see 6.

For cross sections at device locations, see sheets 82-84.5.

details.

Distance to cabinet is approximate & may be field adjusted. See ITS-D16 for

CCTV shall be located and oriented as required in order to view DMS messages. 4.

DMS design and orientation angle varies. See ITS-D15 for details.3.

locations.

Stationing is approximate only and is not tied to known survey markers or 2.

The communication method to/from this site is via fiber.1.

DO NOT SCALE LOCATIONS FROM PLAN SHEET.

IS NOT SHOWN TO SCALE FOR PLAN CLARITY.

NOTE: DEVICE AND CONDUIT SYMBOLOGY ON PLAN SHEET

Install Detector Pole and Equipment

Sta. 1079+04, 116' Rt.

K035NBV-151.80

Cabinet Mounted CCTV

Install ITS Cabinet w/

Sta. 1063+90 114' Lt.

K035SBCA-151.19

UNIT QUANTITYITEM

BID ITEM

2B 3B 2S

K035SBPB-151.18-02

K035SBPB-151.18-02

K035SBPB-151.18-03

K035SBPB-151.18-03 K035SBPB-151.18-01

K035SBPB-151.18-01 K035NBPB-151.18-01

K035NBPB-151.18-01 K035NBPB-151.18-02

K035NBPB-151.18-02 K035NBPB-151.37

K035NBPB-151.37 K035NBPB-151.50-02

K035NBPB-151.50-02

K035NBPB-151.50-02

364'

For KC Scout area, use KC Scout naming conventions.4.

Measure station and offset to the center of devices.3.

Coordinate with the KDOT or KC Scout Project Manager for use of aerial imagery.2.

KC Scout area: yellow conduit for electrical cables, blue conduit for communication cables.

Revise conduit color as applicable for installation location. KDOT area: red conduit for electrical cables, green conduit for communication cables.1.

K035SBSV-151.18

K035NBPP-151.55

K035NBPS-151.55

K035NBCA-151.80

K035NBV-151.80

K035SBSV-151.76

K035SBC-151.19

K035SBCA-151.19

K035SBPB-151.18-03

K035NBPB-151.18-01

K035NBPB-151.18-02

K035SBPB-151.18-02

K035SBPB-151.18-01

K035NBPB-151.65-01

K035NBPB-151.80-01

K035NBPB-151.80-02

K0335NBPB-151.80-03

K035NBPB-151.37

K035NBPB-151.50

DMS Rotation = 15°

Structure & DMS

Install Two-Post DMS

Sta. 1061+95 100' Lt.

K035SBS-151.18

SEE CONSTRUCTION NOTE 3 & 6

200'

SEE CONSTRUCTION NOTE 4 & 6

SEE CONSTRUCTION NOTE 4

SEE CONSTRUCTION NOTE 6

SEE CONSTRUCTION NOTE 8

K035SBSV-151.50

K035SBCA-151.19 K035SBS-151.18 200 200 200 225 230

K D

O T G ra p h ic s C e rt if ie

CABINET WALL

NON-CONDUCTIVE FLANGE WASHER NON-CONDUCTIVE WASHER

FLANGE WASHER

TO ACCOMMODATE

DRILL HOLE IN CABINET

TRACER WIRE

SPLIT BOLT W/ STUD

BRASS OR BRONZE ALLOY

(SPLIT BOLT STUD)

DIRECT CONNECT POST

ALLOY TRANSMITTER

BRASS OR BRONZE

ALLOY NUT

BRASS OR BRONZE

CABINET LAYOUT

TYPICAL 334 AND 336S

ITS-D04

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

ITS EQUIPMENT/CABINET LABELING EXAMPLE

NOTES

DEVICE IP ADDRESS(ES)

DEVICE IP ADDRESS(ES)

DEVICE IP ADDRESS(ES)

SWITCH PORT ASSIGNMENTS/CONFIGURATIONS/VLAN

SWITCH IP ADDRESS & VLAN

MILE MARKER

SITE NAME

U

PAD MOUNT

TYPICAL TYPE 334 CABINET

FRONT VIEW BACK VIEW

FRONT VIEW

POLE MOUNT

TYPICAL TYPE 336S CABINET

BACK VIEW

INFORMATION, SEE ITS EQUIPMENT SPECIFICATIONS FOR ADDITIONAL DETAILS.

ITS SPECIFICATIONS, INCLUDE A CABLE TAG WITH SITE AND DEVICE

IN ADDITION TO LABELING EACH DEVICE WITH LABELS AS WRITTEN IN THE

U

U

U

U

Include louvered back plate on all cabinets. 7.

adapter shall be incidental to the site bid item.

space is required, or as requested by the Engineer. Second DIN rail with bracket

Provide a second DIN rail with bracket adapter for ITS equipment if additional 6.

indicate equipment dimensions on elevation drawings.

the front, rear, and side views for proposed equipment placements. Clearly

Provide a rack elevation drawing for each ITS cabinet within the project showing 5.

Door filters shall have full back plates enclosing filter and holding filter in place.4.

See ITS plans and specifications for equipment to be included in cabinets.3.

prior to installation.

Contractor shall submit actual cabinet elevations to the Engineer for approval 2.

above the bottom of ground mounted cabinets.

Power supply assemblies and connections shall be mounted a minimum of 12 in 1.

NOTE: 1U = 1.75 INCHES

LIGHTNING PROTECTION

24"

NOTE: 1U = 1.75 INCHES

ONLY WHERE NOTED

UPS + BATTERIES INCLUDED

BATTERIES

UPS 3

U

LIGHTNING PROTECTION

OTHER EQUIPMENT ON DIN RAIL

CISCO EQUIPMENT AND

WITH BRACKET ADAPTER

DIN RAIL CLIP

PULL OUT DRAWER

GENERAL NOTES:

OF CABINET

ASSEMBLY AT TOP

VENTILATION FAN

OF CABINET

ASSEMBLY AT TOP

VENTILATION FAN

SHELF AREA FOR

ENCODER, MODEM,ETC.

SHELF

FO SPLICE / PATCH HOUSING

CONTROLLER #1

CONTROLLER #2

AC OUTLET/SURGE

BUS BAR, BREAKER

POWER SUPPLY INPUT

ASSEMBLY, SURGE /

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

24" 24"

24"

ENCODER, MODEM,ETC.

SHELF

U

U

U

U

UFO SPLICE / PATCH HOUSING1

U

U CONTROLLER

U

U

U

U

U

U

U

U

ASSEMBLY, SURGE /

BUS BAR, BREAKER

POWER SUPPLY INPUT

AC OUTLET/SURGE

PULL OUT DRAWER

DIN RAIL

OTHER EQUIPMENT ON

CISCO EQUIPMENT

DIN RAIL CLIP

SHELF AREA FOR

U

U

U

U

U

U

INSIDE OF CABINET OUTSIDE OF CABINET

CABINET TRACER WIRE CONNECTION DETAIL

THE BOTTOM SIDE OF THE CABINET NEAREST THE POLE.

B. POLE MOUNTED TYPE 336 CABINET - TERMINAL SHALL BE MOUNTED ON

SIDE.

THE BOTTOM OF THE CABINET UNDER THE BACK CABINET DOOR, HINGE

A. PAD MOUNTED TYPE 334 CABINET - TERMINAL SHALL BE LOCATED NEAR

CABINET EDGES AND SIDE IN WHICH IT IS NOT DIRCTLY MOUNTED TO.

ACCIDENTAL "SNAGGING" . LOCATIONS SHOULD BE A MINIMUM OF 1.5" FROM

6. TERMINAL LOCATION - TERMINALS SHALL BE MOUNTED IN ORDER TO PREVENT

5. APPLY THREAD LOCK SEALANT TO REDUCE TAMPERING.

4. MAINTAIN 1.5" MINIMUM CLEARANCE FOR TERMINAL.

3. HOLE IN CABINET SHALL BE MADE WATER TIGHT.

2. TERMINAL SHALL BE COMPLETELY ISOLATED FROM CABINET & GROUNDING.

FLEXIBILITY CONTACT THE ENGINEER FOR APPROVAL.

ACCESSIBLE FROM THE OUTSIDE OF THE CABINET. IF STRANDED IS NEEDED FOR

1. TRACER WIRE TERMINAL SHALL BE SOLID BRASS OR BRONZE ALLOY &

NOTES

LABEL TRACER WIRE

LOCATE CONNECTION BOLT

LABEL TRACER WIRE

LOCATE CONNECTION BOLT

K D

O T G ra p h ic s C e rt if ie

ITS CABINET DETAILS

ITS-D05

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

07-14-23 2023 KDOT Standards Updates JAN 00

BY

S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

74"

3 3

4 4

PLUG

INSTALL DUCT

DOUBLE CABINET (NEW FOUNDATION)SINGLE CABINET (NEW FOUNDATION)

CONDUIT

SPARE 2"

AS REQUIRED

CONDUITS

MIN.

6"

PLUG

INSTALL DUCT

M I N

A P

R O

N

(T Y P

M I N

ITS

KDOT

IN KC SCOUT AREA.

"KC SCOUT ITS" WHEN

CABINET

TO INSIDE OF

PROVIDE INSULATION

AC UNIT

SEAL ENDS OF CONDUIT

ITS

KDOT

ITS

KDOT

M A

X

A P

R O

N

(T Y P

M I N

M I N

AS REQUIRED

CONDUITS

AS REQUIRED

CONDUIT

CONDUIT

SPARE 2"

MIN.

6"

NOTES:

cabinet doors.

Bollards shall be placed so they do not interfere with shall be placed on all four corners of double cabinet foundation.

paint all exposed surfaces yellow. Dome top of bollard. Bollards

6" schedule 40 round steel pipe filled with concrete. Prime &

F&I duct plug.

F&I in spare conduit, stub out 6 in from face of foundation.

equipment ground bus to ground rod.

Minimum No. 4 copper grounding conductor from cabinet exothermically welded.

at least 2.5 ft deep. Connection to ground rod shall be not to exceed 45 degrees from vertical or buried in a trench vertical position, the rod may be driven at an oblique angle exist which prohibit the placement of the ground rod in a

Grounding rod, 3/4 in x 20 ft min. If subsurface conditions

50 year silicone caulk between cabinet and base.

GENERAL NOTES:

Conduit must enter cabinet foundation on the same side as its approach run.2.

See ITS-D03A or ITS-D03B for fiber optic cable slack.1.

K D

O T G ra p h ic s C e rt if ie

FOUNDATION DETAILS

ITS CABINET

ITS-D06A

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

07-14-23 2023 KDOT Standards Updates JAN 00

S -D

A .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

BACKFILL MATERIAL

6" STONE DRAIN-POROUS

3"

ANCHOR ROD

CONDUITS AS REQ'D.

NOTE:

1.

3 3 plug.

5 F&I 2 in spare conduit, stub out 6 inches from face of foundation. F&I duct ground bus to ground rod.

4 Minimum No. 4 copper grounding conductor from cabinet equipment

3 Stone drain material shall conform to the standard specification.

2 Rebar shall be adjusted to accommodate conduit.

shall be No. 4 bars, evenly spaced at 12 in spacing, +/- 1.5 in.

1 All reinforcing bar used in the construction of the cabinet foundation

CABINET FOUNDATION NOTES:

9" X 16"

CONDUIT AREA

" X 15" X 2"4

ANCHOR ROD, (4)

(DIRECTION)

FACE OF CABINET

2"

4"

"8

15"

" 5"

24"

24"

24"

CONDUIT

POWER LEAD IN

CONDUIT

SPARE 2"

PLUG

INSTALL DUCT

MIN

6"

"8

4"

30"

3" "8

MIN

24"

1" CONDUIT

ITS CABINET FOUNDATION DETAILS

POLE MOUNTED ITS CABINET MAINTENANCE PAD

5'-0"

PAD

MAINTENANCE

CABINET

CABINET

TYP. 336S

L OF DMS OR CCTV POLEC

TYPE B COMPACTION

M I N

MAX.

4"-6"

FABRIC

WELDED WIRE

6X6-W4XW4

3" MIN.

M A

X

5'-0"

ITS CABINET FOUNDATION ON SLOPE DETAILS

CABINET PAD.

VAULT DOWNHILL OF

LOCATE PULL BOXES OR SPLICE

VARIES

V A

R I E S

D E P

T H

E

M B

E D

M E

N T

6'-0"

3"2

"8 side as its approach run.

Conduit must enter cabinet foundation on the same for KDOT-provided cabinets (DMS or otherwise).

Coordinate with the Engineer on anchor bolt spacing

2.

FOUNDATION

FORM AROUND POLE

FOUNDATION AND PAD

BETWEEN POLE

" EXP. JOINT 2

1FORM

.5

" X 20' GROUND ROD OR 2 - 10' GROUND RODS4

K D

O T G ra p h ic s C e rt if ie

FACE OF CABINET (DIRECTION)

FOUNDATION DETAILS

ITS DOUBLE CABINET

ITS-D06B

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

07-14-23 2023 KDOT Standards Updates JAN 00

S -D

B .d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

CABINET FOUNDATION NOTES:

4'- 7"

2'- 6"

2'- 6"

"2

2'-0"

"2

4'-

8"

8"

2'-0"

FOUNDATION & PAD DETAILS

BASE PLAN

MANUFACTURE PRIOR TO CONSTRUCTING BASE.

CONTRACTOR SHALL VERIFY DIMENSIONS FROM CABINET

BASE DIMENSIONS MAY VARY DEPENDING ON CABINET.

9" X 16"

CONDUIT AREA

9" X 16"

CONDUIT AREA

CONDUIT

POWER LEAD IN

1" CONDUIT

4"

30"

3"

24"

MIN

PLUG

INSTALL DUCT

MIN

6"

CONDUIT

SPARE 6"

ANCHOR ROD

CONDUITS AS REQ'D.

PLUG.

5 F&I 2 IN SPARE CONDUIT, STUB OUT 6 IN FROM FACE OF FOUNDATION. F&I DUCT

GROUND BUS TO GROUND ROD.

4 MINIMUM NO. 4 COPPER GROUNDING CONDUCTOR FROM CABINET EQUIPMENT

3 STONE DRAIN MATERIAL SHALL CONFORM TO THE STANDARD SPECIFICATION.

2 REBAR SHALL BE ADJUSTED TO ACCOMMODATE CONDUIT AND BOLLARDS.

SHALL BE NO. 4 BARS, EVENLY SPACED AT 12 IN SPACING, +/- 1.5 IN. SEE ITS-D06 FOR DETAILS.

1 ALL REINFORCING BAR USED IN THE CONSTRUCTION OF THE CABINET FOUNDATION

GENERAL NOTES:

BOLLARD DETAIL

" X 20' GROUND ROD (MIN.)4

PLUG EMPTY CONDUITS (TYP.)

SUBSIDIARY TO THE HUB CABINET.

EITHER PVC OR HDPE, BUT SHALL BE PLUGGED AT EITHER END. CONDUIT IS

PLACED BETWEEN HUB CABINET AND ADJACENT SPLICE VAULTS. CONDUIT MAY BE

3. ON HUB CABINETS (NOT SIGNAL CABINETS), AN EMPTY 6" CONDUIT SHALL BE

SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION.

2. BOLLARDS SHALL SPACED SO THEY DO NOT INTERFERE WITH CABINET DOORS. THIS

DIMENSIONS FROM CABINET MANUFACTURE PRIOR TO CONSTRUCTING BASE.

1. BASE DIMENSIONS MAY VARY DEPENDING ON CABINET. CONTRACTOR SHALL VERIFY

SUBSIDIARY TO "BOLLARD (PERMANENT)".

FABRICATION WHETHER SPECIFICALLY MENTIONED OR NOT. CONCRETE FOOTING SHALL BE

SHALL INCLUDE ALL THE TIME, MATERIALS, & EQUIPMENT NECESSARY FOR INSTALLATION &

STEEL BOLLARDS SHALL BE SUBSIDIARY TO THE BID ITEM "BOLLARD (PERMANENT)". THIS

3. ALL WORK ASSOCIATED WITH INSTALLATION, CONSTRUCTION, & FABRICATION OF 6"

SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION.

2. BOLLARDS SHALL SPACED SO THEY DO NOT INTERFERE WITH CABINET DOORS. THIS

EXPOSED SURFACES YELLOW. DOME TOP OF BOLLARD.

1. 6" SCHEDULE 40 ROUND STEEL PIPE FILLED WITH CONCRETE. PRIME & PAINT ALL

3/4" X 15" X 2"

ANCHOR ROD, (4 MIN)

STEEL BOLLARD (TYP.)

DOMED TOP

YELLOW.

PAINT ALL EXPOSED SURFACES

FILLED WITH CONCRETE. PRIME &

6" SCHEDULE 40 ROUND STEEL PIPE

CABINET BASE

FACE OF CABINET (DIRECTION)

REAR DOORS

(M

I N

.5

40.5"

44.5" (MIN.)

9'- 7"

6'- 9"

8'-0" (M

IN.)

3" (TYP.)

3" (T

YP

1'-0"

3"

CONCRETE FOOTING

BACKFILL MATERIAL

6" STONE DRAIN-POROUS

K D

O T G ra p h ic s C e rt if ie

PVC TRACER TOP LID

TIGHTENING ONTO BASE

PENTA HEAD BOLT FOR

TERMINAL

TRACER WIRE

PLASTIC

PVC TOP

TRANSMITTER DIRECT CONNECT POST

FOR EASY DETECTION

ENCAPSULATED MAGNET

(WHEN APPLICABLE)

CONNECTION

TRACER WIRE

TEST STATION WITH

IN-GROUND LOCATE

(WHEN APPLICABLE)

WITH TRACER WIRE CONNECTION

IN-GROUND LOCATE TEST STATION

IN 1" CONDUIT

GROUND WIRE,

AND ONE

TRACER WIRE

WIRES,ONE

2- #12 SOLID

SWITCH

GROUND

TERMINAL

SWITCH

GROUND

JUMPER

SWITCH

GROUND

ITS PULL BOX DETAILS

ITS-D07

STATE

KANSAS

YEARPROJECT NO.

SHEETS

TOTAL

SHEET NO.

DATE REVISIONS APP'DNO.

KANSAS DEPARTMENT OF TRANSPORTATION

01-09-25 2024 KDOT Standards Updates JAN 00

BY

AJS

06-04-25 Tracer Wire Updates JAN 01 AJS

01-09-26 2025 KDOT Standards Updates JAN 02 AJS

I T S -D

.d g n

F il e

P lo tt e d b y J

B a il e y s rf c o n s u lt in g .c

-J

A N -2

:0

QUAN.CK.

3"

SEE NOTE 13

CONCRETE PAD

BOLT (2 REQUIRED)

51/64 PENTA-HEAD

STAINLESS STEEL

#4 REBAR (TYP.)

REQUIRED

CONDUIT AS

CABLE TO BE INSTALLED (TYP.)

EXCEED BEND RADIUS OF

CONDUIT RADIUS SHALL NOT

MATERIAL

POROUS BACKFILL

STONE DRAIN -

SECTION C-C

BOLT HOLE

TYPICAL BOLT CLEANOUT

SECTION B-B SECTION A-A

MATERIAL

POROUS BACKFILL

STONE DRAIN -

CABLE TO BE INSTALLED

EXCEED BEND RADIUS OF

CONDUIT RADIUS SHALL NOT

M I N

4" MIN. 4" MIN.

REQUIRED

CONDUIT AS

TYPICAL 4 PLACES

(CABLE HOOKS)

MOLDED INSERT

9" 24" #4 REBAR (TYP.)

A L L S I D

E S

T

Y P

C

B

B

AA

A L L S I D

E S

T

Y P

#4 REBAR (TYP.)

C

E L E

C T

R I C

K D

O T

SURFACE

SKID RESISTANT

NOTES:

GENERAL NOTES:

.5

FOR COMMUNICATION PULL BOXES ONLY

IN-GROUND LOCATE TEST STATION DETAIL

BOLT (2 REQUIRED)

51/64 PENTA-HEAD

STAINLESS STEEL

SURFACE

SKID RESISTANT

I T S

K D

O T

SURFACE

SKID RESISTANT

BOLT (2 REQUIRED)

51/64 PENTA-HEAD

STAINLESS STEEL

H I G

H V

O L T

A G

E

K D

O T C

A U

T I O

N

PREFORMED PULL BOX COVER

WHEN CONTRACTOR LEAVES, THEY SHALL LEAVE THE GROUND OFF.3.

2. TRACER LID SHALL BE ORANGE FOR COMMUNICATIONS AND RED FOR POWER AND INCLUDE A CAST-IRON FLANGE FOR LOW TRAFFIC.

WITH A 48-INCH COPPER ROD EXPOSING ONLY 12 INCHES.

TRACER WIRE SHALL BE SOLID BRONZE ALLOY & ACCESSIBLE FROM THE TOP OF LID WITHOUT REQUIRING LID REMOVAL. GROUND

1. USE TWO-TERMINAL SWITCHABLE LID. COPPERHEAD INDUSTRIES SNAKEPIT PART NUMBER SP-SWLID-*2 OR APPROVED EQUAL.

of the related conduit. Test stations are incidental to pull boxes.

the same side as conduits is exiting pull box. Match test station color to the color each direction of conduit leaving the pull box. Test stations must be located on in-ground locate test station(s). Locate stations are required for

All KDOT ITS Communication Pull Boxes must include an 5 by a ground bushing and No. 4 bare copper wire.

All metal conduits shall be electrically bonded4

Text shall be 2 in high and centered. Maintain adequate letter width and spacing.

DMS cables shall have 5" x 11" cast-in, stamped concrete labels with "KDOT/ITS".

Pull boxes with loop lead-in cables, detector cables, communication cables, or 3 centered. Maintain adequate letter width and spacing.

labels with "KDOT CAUTION/HIGH VOLTAGE". Text shall be 2 in high and

Pull boxes with 480V conductors shall have 5" x 11" cast-in, stamped concrete 2 adequate letter width and spacing.

labels with "KDOT/ELECTRIC". Text shall be 2 in high and centered. Maintain

Pull boxes with 120/240V conductors shall have 5" x 11" cast-in, stamped concrete 1 the Construction Office for approval.

Contractor shall use grade 4 concrete for concrete pad. This shall be submitted to 13.

to be installed on the existing and new lines.

connecting to is not equipped with a test station, new test stations will be required start of a branch run). If an existing mow strip or splice vault that the contractor is changes direction greater than forty-five degrees or at the end of a fiber run (or there is a splice vault, both sides of a bored conduit deeper than 4', when a run grounding per manufacturer recommendation) is required at each location where station). Multiple runs will require multiple test stations. Selectable ground (and communications run (E.G. entry and exit straight through would require one test communications conduit. Separate stations will be required for each power or locate testing stations. Separate stations shall be provided for power and

All communications and power pull boxes and splice vaults shall be equipped with 12.

Conduit must enter pull box on the same side as its approach run.11.

Substitute "KC SCOUT" for "KDOT" when installations are in KC Scout area.10.

socket and one pull box lifting hook must be provided for each project.

for every 20 pull boxes installed. A minimum of one stainless steel penta-head

Provide KDOT with one stainless steel penta-head socket and pull box lifting hook 9.

clean aggregate.

Stone drain material shall conform to the standard specifications and shall be 8.

77, current edition.

Pull box and cover shall be rated for a minimum loading of tier 22 per ANSI/SCTE 7.

exposing 4" to 6" of individual microducts. See section 6.3.1.

Stub up conduit 6" inside pull box. For multiway microduct, stub up 8" to 12" total, 6.

the conduit.

pulling…