EVICC Third Assessment Scope Meetings - Summer 2026~4.pptx

PPTX presentation 3 MB Posted

Attached to
Facilitation and Analysis Services for the Third Assessment PRF76 CAT 2
Solicitation number
BD-27-1042-ENV-ENV01-131718
Issued by
Suffolk County, Massachusetts

About this file

This is a scope presentation for the Electric Vehicle Infrastructure and Charging Corridor (EVICC) Third Assessment developed by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs (EEA). The assessment aims to deliver a concise, actionable evaluation of Massachusetts' electric vehicle supply equipment (EVSE) deployment strategy, with priority given to high-value charging investments including highway direct current fast charging (DCFC), multifamily Level 2 (L2), workplace, medium and heavy-duty vehicle (MHDV), and curbside charging. The Third Assessment development timeline spans from Summer 2026 through Late Fall 2026, beginning with contractor onboarding and stakeholder interviews, followed by a public EVICC meeting on September 2, 2026, to present the proposed scope and gather member feedback. The scope refinement and outline formalization will occur in Early and Late Fall 2026 to guide the comprehensive assessment development.

The Third Assessment scope encompasses eight primary focus areas: prioritizing high-impact investment opportunities, implementing long-term load management and novel customer price signal approaches, developing a comprehensive medium and heavy-duty vehicle charging plan, improving EV charging road signage, analyzing charger utilization and payback periods, enhancing siting and permitting processes, assessing grid resilience during emergency events, and expanding municipal and public education resources. The analysis component includes modeling different EV charging scenarios, identifying areas with anticipated step load increases from fleet electrification, and conducting an inventory of public and private chargers. Stakeholder engagement occurs throughout the process, with member input particularly valuable during the Summer 2026 onboarding phase and at the September EVICC meeting, enabling participants to identify gaps, share perspectives, provide feedback, and prioritize or de-prioritize topics for the assessment.

View the file

Other files

File Type Posted
EVICC PRF76 CAT 2.pdf PDF
Addendum 2 PRF74 CAT 2~1.pdf PDF
Addendum 3~13.pdf PDF
Addendum 1 PRF76 CAT 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scoping EVICC’s Third Assessment

Mark Scribner, Policy Advisor for Transportation Decarbonization, EEA Katie Gronendyke, Clean Energy Policy Advisor, EEA Summer 2026

Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs

Recap of Second Assessment

High-level takeaway Massachusetts remains a national EVSE leader — but deployment must accelerate and adapt to meet 2030 climate goals.

recommendations

Goal: prioritize high-value charging investments, coordinate programs, and reduce grid and deployment barriers.

Be more strategic with funding Prioritize highest-value investments: highway DCFC, multifamily L2, workplace, MHDV, curbside.

Better leverage private funding.

Improve customer experience Set minimum reliability standards and improve transparency on pricing, fees, and station signage.

Improve efficiency of programs Better align MassEVIP and utility incentive programs.

Improve long-term proactive planning Coordinate strategic planning across Section 103, CECP, interconnection, grid infrastructure, and future funding.

Grid impact Deploy programs and technologies that minimize peak demand and reduce the need for electric grid upgrades.

Remove deployment barriers Develop resources for municipalities and site hosts; standardize EVSE permitting.

Developing the Third Assessment Scope Process

Deliver a more concise, focused, actionable Assessment

Engage with EVICC members, agencies, and stakeholders early and often

Integrate Section 103 grid planning process in the development of the Assessment

Topics

• Prioritizing the highest-impact areas for public and private investment

• Long-term load management planning, V2X, and novel approaches to customer price signals

• Creation of a long-term plan for medium- and heavy-duty vehicle charging

• Improving EV charging road signage

• Utilization and payback periods of existing chargers

Improving siting and permitting and interconnection for EV charging

• Grid resilience and infrastructure needs for EVs before, during, and after emergency events

Expanding resources/guidance to strengthen implementation, municipal support, and public education

Analysis

• Model different EV charging need scenarios

• Identify areas with likely step load increases of EV charging, like electrifying fleet depots

• Inventory of both public and private chargers

Third Assessment Development Timeline

Where member input is most helpful

Surface gaps

Share perspectives

Provide feedback Identify missing topics, emerging priorities, or areas that can be de-prioritized.

Bring agency and stakeholder perspectives.

Provide comment at the September EVICC meeting; review Third Assessment scope.

Summer 2026 Onboard contractor; conduct initial agency and stakeholder interviews; refine proposed scope.

Sept. 2, 2026 Public EVICC meeting to discuss the proposed scope and gather member feedback.

Early Fall 2026 Refine scope; develop and formalize the Third Assessment outline; continue engagement.

Late Fall 2026 Finalize scope and outline to guide development of the Third Assessment.

The timeline remains preliminary and may be refined as the scope and engagement plan develop.