This is a specifications document issued by the City of Minneapolis for a competitive bid to supply and deliver Ductile Iron Gravity Sewer Pipe (DIP) for public works projects. The City seeks prospective suppliers to provide DIP products suitable for storm and sanitary sewer applications, along with related pipe fittings and specialty items. The contract will have an initial term of one year, commencing March 24, 2026, through March 24, 2027, with the option for the City to renew at expiration or extend for two additional 12-month periods by mutual agreement. All bidders must complete and submit a bid form in Excel format that includes unit prices covering all costs, including fuel and delivery charges. The specifications require materials to meet ASTM A746 standards for DIP, with storm sewer pipe meeting ANSI C150, C151, and C104 standards, and sanitary sewer pipe requiring Protecto 401 Ceramic Epoxy lining with specific performance testing certifications. All bid items must be delivered FOB freight prepaid within seven days of order notification to designated locations within Minneapolis city limits and unloaded by city personnel. The City reserves the right to reject any or all bids and is not obligated to purchase any minimum quantities; the contract is non-exclusive, and the City may hire other contractors for similar work.
Prices shall remain firm throughout the initial contract period, with price escalations for contract extensions permitted only after the initial year based on documented industry-wide or regional cost increases submitted 60 days prior to contract year expiration, subject to City Procurement Office approval and generally capped at the Consumer Price Index or five percent, whichever is higher. All supplied materials will be subject to inspection and testing by the City's engineer either during production or upon delivery, with rejected materials to be removed by the supplier within 24 hours or removed by the City at the supplier's expense. Invoices must be submitted electronically in PDF or compatible formats to the City's procurement office following delivery and acceptance, with payment issued within 30 days of verified receipt unless items are questioned. The successful bidder must maintain adequate local supply warehouses to enable delivery or City pickup within one hour, with warehouse locations to be designated on the bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID-PW-Ductile_Iron_Gravity_Sewer_Pipe.pdf | ||
| EVENT_4087_-_BID_FORM.xlsx | XLSX spreadsheet | |
| EVENT_4087_-_CALL_FOR_BIDS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
PUBLIC WORKS (PW)
EVENT 4087 – DUCTILE IRON GRAVITY SEWER PIPE
OVERVIEW/PURPOSE
The City of Minneapolis is issuing its Call for Bids for prospecƟve suppliers to furnish and deliver
DucƟle Iron Gravity Sewer Pipe for PW Water Treatment and DistribuƟon, along with various
Boards and Departments, all in accordance with the provided specificaƟons, event line items, and all documents requested herein.
Contract Term
The successful Contractor will be awarded an iniƟal one (1) year contract from March 24th, 2026, through March 24th, 2027. This contract may be renewed at the expiraƟon of the iniƟal term at the request of the City. The City reserves the right to extend this contract for two (2) addiƟonal 12-month periods if agreeable to both parƟes.
Price Escala on
Prices shall be firm for the iniƟal contract period. AŌer the iniƟal contract period, an escalaƟon may be allowed for any extensions based upon a demonstrable industry wide, regional and/or operaƟonal increase in the contractor’s costs. For documented evidence to be considered, it must be submiƩed to the City of Minneapolis Procurement Office sixty (60) days prior to the end of the current contract year. The exact amount of escalaƟon, if any, will be governed by the validity of the documentary evidence submiƩed. No price increase will be effecƟve unƟl approved by the City of Minneapolis Procurement Office. Except for extraordinary circumstances, the amount of any increase shall not exceed the Consumer Price Index (CPI) or five (5) percent, whichever is higher.
Non-Exclusive
Any contract(s) resulƟng from this Request for Bid will not be an exclusive contract, and the City reserves the right to hire other contractors to perform similar work and seek bids from other vendors.
Rights of the City
The City reserves the right to reject all or any part of any bid, waive informaliƟes, and award the contract to the lowest responsive and responsible contractors to best serve the interests of the
City. Informality shall mean a minor defect or variaƟon of a bid from the exact requirements of the Request for Bid which does not affect the price, quality, quanƟty, or delivery schedule for the goods, services or construcƟon being procured.
EVENT REQUIREMENTS
Bid Form
All bidders shall complete and upload the Bid Form in Excel format to be deemed as responsive.
Each unit price shall include all costs, but not limited to fuel costs and delivery charges. The Bid
Form will auto-calculate the Grand Total. In the event of a mathemaƟcal error on the Bid Form, the unit price shall prevail.
COMMODITY REQUIREMENTS
Quan es
The quanƟƟes specified in this Contract are esƟmated only. They may not indicate the actual quanƟty to be ordered, since the volume will depend on requirements that develop during the
Contract period.
QuanƟƟes shown shall not be construed to represent any amount which the City shall be obligated to purchase under the Contract or relieve the Contractor of its obligaƟon to fill all orders placed by the City.
Quality of Materials
Unless otherwise specified, all materials and equipment incorporated in this project shall be new and of the best quality for the purpose intended. Should the quality of a material be unspecified in the documents, the Contractor must provide the best product for the purpose intended to the saƟsfacƟon of the City Project Manager.
Materials Proposed as Equal
Whenever an arƟcle or material is defined by describing a proprietary arƟcle, or by using the name of the manufacturer, the term "or approved equal", if not inserted, shall be implied.
The specific arƟcle or materials menƟoned shall be understood as indicaƟng the type, funcƟon, minimum standard of design, efficiency and quality desired, and shall not be construed to exclude other manufacturer's products of comparable quality, design and efficiency.
Makes and models of items which the Contractor alleges to be equal to those named in the specificaƟon shall be subject to the approval of the Project Manager. The use of alternate items will not be permiƩed by the City without wriƩen approval of the Project Manager. The contractor shall not be relieved from the responsibility for furnished arƟcles or materials equal in quality, design and efficiency to those specified because of the approval of such alternates.
Delays & Delivery Failures
The Contractor must keep the City advised at all Ɵmes of status of parƟes’ agreement. If a delay is foreseen, the Contractor shall give immediate wriƩen noƟce to the City Project Manager.
Should the Contractor fail to deliver the proper item(s)/service(s) at the Ɵme and place(s) contracted for, or within a reasonable period of Ɵme thereaŌer as agreed to in wriƟng by the
City Project Manager, or should the Contractor fail to make a Ɵmely replacement of rejected items/services when so required, the City may purchase items/services of comparable quality and quanƟty in the open market to replace the undelivered or rejected items/services. The
Contractor shall reimburse the City for all costs in excess of the Agreement price when purchases are made in the open market; or, in the event that there is a balance the City owes to the Contractor from prior transacƟons, an amount equal to the addiƟonal expense incurred by the City as a result of the Contractor's nonperformance shall be deducted from the balance as payment.
All bid items are to be delivered FOB freight prepaid to any locaƟon, or locaƟons within the
Minneapolis City limits, and in such a manner as may be designated by the Engineer. All bid items will be delivered by the supplier and will be unloaded by city personnel, unless otherwise directed by the Engineer.
All bid items will be packaged, handled, and shipped in accordance with the manufacturer's instrucƟons. The City of Minneapolis will not be responsible for the reimbursement or return of any wooden pallets, containers, or cartons used in the shipping and handling of any bid item. All bid items are to be delivered no later than seven (7) days aŌer noƟficaƟon of order.
Inspec ons
All supplied pipe, manufacturing materials and related pipe items will be subject to inspecƟon and/or tesƟng, by the Engineer, either during producƟon or upon delivery. Tests and inspecƟons made by the Engineer will be conducted so as to minimize interference with the Bidder’s regular producƟon and delivery schedule. The City will bear the cost of the actual test. Failure to comply or cooperate with these proceedings will result in the rejecƟon of the enƟre day's producƟon. Supplied pipe and materials deemed unacceptable by the standards of the specificaƟons will be rejected and immediately removed by the supplier even though the material may have already been unloaded and stockpiled. Any rejected material not removed within twenty-four (24) hours of noƟficaƟon will, at the Bidder's expense, be removed by the city to a non-specific dump site.
The Awarded Bidder will replace or repair all such defecƟve materials as ordered, in wriƟng, by the Engineer. If, in the opinion of the Engineer, it is not expedient to correct inadequate pipe or materials not in compliance with the specificaƟons, the City shall have the right to deduct the difference in value between the materials supplied and that called for under the specificaƟons.
The value shall be determined in accordance with competent cost esƟmates. Any deducƟons shall not be construed as a waiver, release or compromise of any other losses, costs, damages or causes of acƟon of the City arising out of such non-complying pipe or materials. No subsƟtuƟons will be allowed.
Commodity Specifica ons & Standards
Sec. 1.01 Introduc on: This specificaƟon describes the requirements for bidding to supply
DucƟle Iron Pipe (DIP) and related items for the 2026 construcƟon season. All supplied pipe and related items will be suitable for use as, direct burial, storm and sanitary sewer lines.
Sec. 1.02 Storm Sewer: All DucƟle Iron Gravity Sewer Pipe – Iron Class CL52 Slip on joints pipes will meet:
ASTM A746 standard for DucƟle Iron Gravity Sewer Pipe
ANSI C150 and ANSI C151 for pressure classes
ANSI C104 for Cement Lining
Sec. 1.03 Sanitary Sewer:
The Standard of Quality is Protecto 401 Ceramic Epoxy. The material shall be an amine cured novalac epoxy containing at least 20% by volume of ceramic quartz pigment. Any request for subsƟtuƟon must be accompanied by a successful history of lining pipe and fiƫngs for sewer service, a test report verifying the following properƟes, and a cerƟficaƟon of the test results.
A. A permeability raƟng of 0.00 when tested according to Method A of ASTM E-96, Procedure A with a test duraƟon of 30 days.
B. The following test must be run on coupons from factory lined ducƟle iron pipe:
ASTM B-117 Salt Spray (scribed panel) – Results to equal 0.0 undercuƫng aŌer two years.
ASTM G-95 Cathodic Disbondment 1.5 volts @ 77 °F. Results to equal no more than
0.5 mm undercuƫng aŌer 30 days.
Immersion tesƟng rated using ASTM D-714.
– 20% Sulfuric acid – No effect aŌer two years.
– 140 °F 25% Sodium Hydroxide – No effect aŌer two years.
– 160 °F DisƟlled Water – No effect aŌer two years.
– 120 °F Tap Water (scribed panel) – 0.0 undercuƫng aŌer two years with no effect.
ASTM G-22 Standard pracƟce for determining resistance of SyntheƟc Polymeric materials to bacteria. The test should determine the resistance to growth of
Acidithiobacillus Bacteria and should be conducted at 30 degrees cenƟgrade for a period of 7 days on a minimum of 4 panels. The growth must be limited only to trace amounts of bacteria.
Sec. 1.04 Pipe Fiƫngs & Specialty Items: The successful bidder will maintain an adequate supply of regular diameter pipe, pipe fiƫngs and specialty items within the local area so that delivery by the company or City pick-up can be made within one hour. The locaƟon of any supply warehouses will be designated on the Bid Form.
INVOICE & PAYMENT
All work requested under this Contract shall be placed on a City issued Purchase Order.
Contractor shall make all reasonable efforts to submit invoices and documentaƟon in an electronic format, such as PDF or other format compaƟble with City soŌware capabiliƟes, in lieu of paper invoices and documentaƟon, when so requested by City.
Upon delivery and acceptance of the service, the Contractor shall submit an invoice detailing the appropriate charges.
Invoices shall be submi ed to:
City of Minneapolis
505 Fourth Ave S, Room 310
Minneapolis, MN 55415
Email: submi nvoices@minneapolismn.gov
Upon receipt of invoice and final inspecƟon and acceptance of the service, the City will render payment within thirty (30) days unless any items thereon are quesƟoned, in which event payment will be withheld pending verificaƟon of the amount claimed and the validity of the claim. The Contractor shall provide complete cooperaƟon during any such invesƟgaƟon.
The City will not pre-pay for service. All bills shall state the locaƟon and dates of service being billed. All fees, taxes, charges, surcharges, and revenue payments are to be itemized.
No payment will be made for material stored off-site except in situaƟons where payments may be considered by the City for materials which are stored in a secured area, to be verified by the
City and where the Contractor maintains adequate insurance coverage protecƟng specific materials from loss.
Proof of insurance shall be supplied prior to payment for any materials stored off-site.