Estimate 135636.pdf
PDF 74 KB Posted
- Contract number
- 26-494DOT-DISTR-P-88893
- Issued by
- Illinois
About this file
This is a packing list issued by A&A Equipment and Supply Co., located in Bensenville, Illinois, for delivery to the Illinois Department of Transportation (IDOT) District 6 in Springfield, Illinois. The document, dated October 24, 2025, with an expiration date of November 24, 2025, serves as confirmation of goods shipped via AA Truck to the recipient facility.
The shipment consists of 224 units of Cement DOT Fast Set 55 LB., a quick-setting cement product designed for fast repairs, at a unit rate of $28.49 per unit totaling $6,381.76. Additionally, four skids are included at $30.00 each for a total of $120.00. The subtotal for materials is $6,501.76, with no applicable tax. Shipping costs of $500.00 are added, resulting in a total invoice amount of $7,001.76. The contact for this shipment is Frank at 217-685-5567.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| standard terms and conditions~55.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A&A Equipment and Supply Co.
196 W Devon
Bensenville, IL 60106 US
+16305951510 dhayden@aa.equipment https://www.aa.equipment/
Packing List
ADDRESS
IDOT-District 6 126 East Ash Springfield, IL 62704
SHIP TO
IDOT-District 6 3881 Chatham Rd., Springfield, IL 62704
SHIP VIA AA Truck PACKING LIST 135636
DATE 10/24/2025
EXPIRATION
DATE
11/24/2025
CONTACT
Frank - 217-685-5567
DATE DESCRIPTION QTY RATE AMOUNT
CEMENT DOT FAST SET 55
LB.
Quick-setting cement for fast repairs. *56 per skid = 3080 LB*
224 28.49 6,381.76T
SKID SKID 4 30.00 120.00T
SUBTOTAL 6,501.76
TAX 0.00
SHIPPING 500.00
TOTAL $7,001.76
Accepted By
Accepted Date
File details come from the government source that posted it. Updated .