This is a scope of work proposal submitted by Moody Nolan to Texas Southern University (TSU) for architectural and design services related to the expansion of study rooms in the TSU Learning Center located at 3100 Cleburne Street, Houston, Texas. The project involves converting approximately 1,410 square feet of casual study areas into collaborative study spaces, with a total of 18 new study rooms proposed across the third and fourth floors—comprising at least 6 rooms on Level 3 and 12 rooms on Level 4. Services include architectural design, furniture/fixtures/equipment (FFE) specifications, audiovisual/information technology (AV/IT) infrastructure, electrical and mechanical design, construction administration, and closeout coordination. The design team consists of Moody Nolan as Architect of Record with subcontractors DATACOM for AV/IT services and Cleary Zimmermann for MEP (mechanical, electrical, and plumbing) design. The project timeline spans 11 weeks, including 3 weeks for construction documents development, 2 weeks for quality assurance and permitting review, 2 weeks for TSU authority having jurisdiction review, 3 weeks for construction administration, and 1 week for closeout. Construction administration includes three site visits, and the project deliverables include issued-for-construction documents, construction administration services, and closeout coordination.
The total design fee is a stipulated sum of $39,550, with a breakdown of $13,157 for management and architectural/interiors services, $2,520 for interiors layout and coordination, $5,473 for information technology and audiovisual design (per Datacom proposal), and $18,400 for mechanical, electrical, and plumbing services (per Cleary Zimmermann proposal). Reimbursable expenses are estimated not to exceed $500 and include document reproduction, delivery, renderings, and models. The scope of work excludes cost estimating, upgrades to building infrastructure beyond the scope of study room modifications, and as-built drawings. Additional services outside the basic scope, such as delays beyond the agreed schedule, changes in project scope, code revisions, or fast-tracking services, will be billed separately as lump sum or hourly rate. Moody Nolan's liability for all services is limited to the total fees paid for the project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope Proposal – TSU Learning Center: Study Rooms Expansion
Dear Mr. Machac, Moody Nolan is pleased to submit this Scope of Work Proposal for architectural, furniture/fixtures/equipment (FFE), audiovisual/information technology (AV/IT), electrical, and mechanical design services, along with construction administration, for the expansion of study rooms on the third and fourth floors of the TSU Learning Center located at 3100 Cleburne St., Houston, TX 77004.
PROJECT DESCRIPTION
The TSU Learning Center – Study Rooms Expansion will enhance the existing facility by adding individual and group study rooms. The project involves converting approximately 1,410 SF of casual study areas on the fourth floor into collaborative study spaces. The Estimated Construction Budget is to be determined by others.
A total of 18 new study rooms is proposed across the third and fourth floors by reconfiguring current casual and private study areas, as well as existing book storage zones. The scope includes installing non-load-bearing partitions and storefront glazing, integrating mechanical and electrical systems, expanding fire alarm coverage, and updating finishes and flooring. These improvements will create flexible, accessible, and modern spaces for student use.
DESIGN TEAM ROLES & RESPONSIBILITIES
• Moody Nolan (MN) will serve as the Architect of Record (AOR), Interiors, & FFE o Manage the full design process.
o Coordinate and integrate all consultant deliverables and BIM models into a primary architectural “interiors modifications” model to produce Construction Documents (CDs).
o Hold all consultant contracts and lead the team in delivering a cohesive design.
• Audiovisual/IT: DATACOM
• MEP Consultant: Cleary Zimmermann
PROJECT DELIVERABLES
• Construction Documents (CDs) for Scope of Work areas
• Issued-for-Construction (IFC) Set
• Construction Administration (includes 3 site visits)
• Close-out coordination (CO) for project turnover
• FFE coordination and specifications
Erin Joseph Machac, AIA
PRINCIPAL
o 214.310.1018 d 469.802.5007 c 281.773.4297 www.treanor.design
PROJECT MILESTONES
Phase Duration
Construction Documents (CDs) 3 weeks
QA/QC Review and Revisions 2 weeks
Permitting Review with TSU (AHJ) 2 weeks
Construction Administration (CA) 3 weeks
Close-out (CO) 1 week
Total Duration 11 weeks
SCOPE OF WORK
1. Management, Architectural/Interiors ($13,157)
• Remove and salvage existing FFE where applicable on Levels 3 and 4.
• Construct non-load-bearing partitions to create at least 6 study rooms on Level 3 and 12 study rooms on Level 4.
• Adjust ACT ceilings, lighting, mechanical systems, fire alarms, and other ceiling systems as required.
• Provide standard TSU study room FFE.
• Coordinate construction drawings with consultants (FFE, AV/IT, Mechanical, Electrical).
2. Interiors Layout & Coordination ($2,520)
• Provide furniture layouts for the proposed room configuration.
• Additional coordination with furniture vendors (if required) will be billed at an hourly rate (TBD).
• TSU may also elect to coordinate directly with its previous FFE vendor for specifications and procurement.
3. Info. Technology (IT) / Audiovisual (AV) ($5,473, Re: Datacom Proposal)
• Design infrastructure for AV spaces, including ADA-required audio systems.
• Deliver construction documents, equipment schematics, and CSI-format specifications.
• Coordinate AV/IT designs with A/E team and assist during bidding and construction.
4. Mech./Electrical/Plumbing ($18,400, Re: Cleary Zimmermann Proposal)
• Mechanical: Air conditioning and controls relocation.
• Electrical: Power distribution, interior lighting, and lighting controls.
• Plumbing: Specification of wet-pipe fire sprinklers only.
FEES & COMPENSATION
• Design Fee: Stipulated sum of $39,550
• Reimbursable Expenses: Estimated not to exceed $500.00 (Re: below).
Includes:
• Reproduction and delivery of project documents
• Any additional renderings, models, or professional photography requested.
• Additional insurance coverage, if required
Third-party printing services will be billed monthly and are excluded from the reimbursable estimate.
ADDITIONAL SERVICES
Any services outside of Basic Services will be billed separately as either a lump sum or hourly rate. Examples include:
1) Delays or extensions beyond the agreed schedule.
2) Changes in project scope, size, or complexity.
3) Adjustments due to code revisions, public relations support, or dispute resolution.
4) Services related to fast-tracking or out-of-sequence schedules.
EXCLUSIONS
This Scope of Work does not include:
1) Cost estimating
2) Upgrades to building infrastructure (Electrical, HVAC, Plumbing)
3) As-built drawings
LIMITATION OF LIABILITY
Moody Nolan shall not be responsible for the performance of contractors or other consultants. Liability for all services is limited to the total fees paid to
MN for this project. This limitation remains in effect during and after the completion of services.
Please let us know if there are any questions regarding this proposal. Moody
Nolan looks forward to collaborating with TREANOR on this project.
Sincerely, Moody Nolan, Inc.
Wardell Ross Jr., AIA, NOMA, NCARB
Texas Studio Director
CC: Brian Tibbs, Managing Partner, Principal in Charge, Moody Nolan, Inc.
Melvalean McLemore, Project Manager, Moody Nolan, Inc.
Juste Tresor Gatari, Project Architect, Moody Nolan, Inc.