This is a Scope of Work document for the State of Texas regarding the Camp Mabry Building 75 RTUs Replacement project. The project involves the replacement of seven existing Carrier rooftop HVAC units (RTUs), model 48HJE007G-631CA, located on Building 75 at Camp Mabry in Austin, Texas. The replacement units must be similar or equal to existing units in capacity, tonnage, and performance. The scope of work encompasses equipment removal and disposal of the old RTU units, installation of seven new RTU package units with hail guard louvers, connection to existing 460-3 phase disconnect and gas lines, installation of equipment pads or isolation feet, connection to existing ductwork or fabrication of new metal ductwork, installation of duct detectors and fire alarm system connections, and installation of new drain lines. Additional work includes installation of new programmable or smart thermostats for each RTU package unit, system balancing and commissioning, airflow adjustments, performance testing, start-up procedures and operational checks, and cleanup and debris removal throughout the project.
The project has an estimated budget of $190,000.00 and is located at Camp Mabry, 2200 W. 35th Street, Austin, Texas 78703. The justification for replacement is that the current RTU units are past their lifecycle replacement dates and operate on outdated and non-operational control boards. The existing units operate on R-134A freon refrigerant, which is being phased out of the industry and is increasingly difficult to procure. Repair parts are difficult to acquire, and the units cannot be updated, making replacement the only viable option. The point of contact for this project is Mr. Peter Byers, Facilities Maintenance Manager, at 512-782-5709.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
PROJECT: BLDG. 75 Package Unit Replacement
DESCRIPTION:
Replace seven existing Carrier rooftop HVAC units (RTUs), model 48HJE007G-631CA, located on the roof of Building 75 (Division Headquarters). Replacement units shall be similar or equal to the existing units in capacity, tonnage, and performance.
JUSTIFICATION:
The current (7) Carrier RTU / units are past their life-cycle replacement dates and operate on outdates and non-operational control boards. The coolant system is based on R-134A freon refrigerant which is getting harder to procure and is being phased out of the industry.
The units cannot be updated, and repair parts are getting harder to acquire. Replacement is the only remaining option.
ESTIMATE:
$190,000.00
LOCATION:
Camp Mabry
2200 W. 35th Street
Austin, Tx 78703
POINT OF CONTACT:
Mr. Peter Byers, Facilities Maintenance Manager, 512-782-5709
SCOPE OF WORK:
Equipment Removal & Disposal:
Disconnecting and removal of seven RTU (rooftop units) package units. including drain lines.
Proper disposal of old package unit according to local & federal regulations.
Attachment G.6 - Scope of Work Page 1 of 2
New Equipment Installation:
Install seven RTU package units with hail guard louvers
Connect to existing disconnect 460 – 3 phase
All RTU package units will have 3 phase protection devices on the units or added to the unit for protection
All RTU package units be side discharge
Connect to existing gas lines
Connect to existing metal ductwork / plenum box or fabricate new metal ductwork to connect to doghouse
Install equipment pad or isolation feet for all seven RTU package units
Connect RTU package unit to existing duct detectors or replace duct detectors
Connect RTU package unit to fire alarm systems
Install new drain line from RTU units to roof drains properly secure drain line to prevent movement of drain lines.
Controls & Automation:
Installation of new thermostats for each RTU package in their specific areas of cooling & heat in building 75 (including programmable or smart features).
System Balancing & Commissioning:
Adjusting airflow through the duct work to ensure proper heating & cooling distribution.
Testing & adjusting system performance to meet design areas.
Start-up Procedures & operational checks by a qualified technician.
Clean-up & Debris Removal:
Regular clean-up of the work area throughout the project.
Removal & disposal of all replaced items.
Attachment G.6 - Scope of Work Page 2 of 2