ESBD_484618_1771873652734_Addendum 2 IFB 0006644 TSBVI Fence Replacement.pdf
PDF 197 KB Posted
- Solicitation number
- 0006644
- Issued by
- Travis County, Austin City, Texas
About this file
This is an Addendum #2 to an Invitation for Bid (IFB #0006644) issued by the Texas Facilities Commission (TFC) on behalf of the Texas School for the Blind and Visually Impaired (TSBVI) for replacement of a cedar perimeter fence at the Superintendent's residence located at 1100 W 45th Street, Austin, Texas. The project scope includes complete demolition and disposal of the existing fence, posts, concrete footings, and debris; construction of an 8-foot-tall cedar security fence with Western Red Cedar pickets, pressure-treated rails, and galvanized steel posts; and installation of one pedestrian gate (36-48 inches wide) and one vehicle gate (12 feet wide). The addendum updates specifications and due dates (shown in red in the revised IFB document) and provides answers to 29 vendor questions submitted prior to bidding. Mandatory site visits were held on February 4, 2026 at 10:00 AM and February 5, 2026 at 2:00 PM. The revised proposal deadline is March 6, 2026 at 3:00 PM Central Time. Key clarifications include confirmation that no interior chain link fence exists requiring removal; that vendors must provide their own portable toilet facilities; that background checks through IdentoGo are required for all on-site personnel; and that working hours are Monday through Friday, 7:00 AM to 5:00 PM Central Time.
The bidding documents require vendors to submit lump-sum proposals with itemized pricing for labor, materials, gates, sealer, and haul-off, along with documentation of five similar projects completed within the past three years and professional references. A Bid Bond equal to 5% of the bid amount and Payment Bonds equal to 100% of contract value are required if awarded. The contract includes a 1-year minimum workmanship warranty and manufacturer warranties for materials, with liquidated damages assessed at $75.00 per calendar day for late completion based on the vendor's proposed schedule. Progressive monthly payment is permitted for services completed in the previous month. Vendors may submit bids by sealed mail or electronic submission to heather.goll@tfc.texas.gov. All contractor personnel and subcontractors must complete mandatory criminal background checks through the Texas Department of Public Safety, with certain felony convictions resulting in permanent disqualification and other felonies requiring a ten-year waiting period. Bidders must comply with multiple Texas statutory certifications including E-Verify compliance and non-boycott provisions regarding Israel and energy companies. No specific budget or award value was disclosed in the procurement documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interim Executive Director Will McKerall, P.E.
Mailing address:
P. O. Box 13047 Austin, TX 78711-3047
(512) 463-3446 www.tfc.texas.gov
Chair Brian A. Bailey
Commissioners Robert H. Clay J.J. Isbell Daniel K. Signorelli C. Price Wagner
Robert S. Wetmore
Texas Facilities Commission Physical address: 1711 San Jacinto Blvd, Austin, Texas 78701
Planning and administering facilities in service to the State of Texas
ADDENDUM #2
DATE: 02/23/2026
IFB #: 0006644
TITLE: IFB for Replacement Cedar Fence – TSBVI Superintendent’s Residence PROPOSAL DEADLINE: 03/6/2026 at 3:00PM CT
Addendum item #1: Post updated IFB document with revised specifications and due dates shown in red.
Addendum item #2: To answer questions received.
# QUESTION ANSWER
1 During the scheduled pre-bid site visit, Vendors were not allowed to see inside the backyard/fence.
Can the owner please provide pictures from inside the fence, in order for Vendor to have a better understanding? Since it’s the Contractors responsibility to get familiar with the project site.
We are not providing pictures from inside the fence.
2 Is the vendor removing the existing chain link fence that is inside/within the backyard of the existing wood fence?
No such fence exists.
3 It was mentioned during bid site visit, that there is an existing chain link fence with privacy mesh, inside the entire perimeter of the backyard that is next to/flush with the existing cedar fence. Please advise what the Vendor is to do in this situation?
Refer to answer for question #2 above.
Per 2. Scope of Work, section A.
Demolition & Disposal, subsection a.
There is a canvas screen in the rear corner that will need to be removed and disposed of along with the fence materials.
4 It was mentioned during bid site visit, that there is an existing chain link fence with privacy mesh, inside the entire perimeter of the backyard that is next to/flush with the existing cedar fence. Is the vendor to replace or install a new chain link fence?
If yes, please provide details and specs?
Refer to answer for question #2 above.
The mesh will not be required after installation of the new fence.
5 In scope, it states ‘Cap or reroute any low-voltage or gate wiring (if present) per code,’ and previously mentioned, during the schedule pre-bid site visit, Vendors were not allowed to see inside the backyard/fence, can Owner please confirm if there is any low-voltage or gate wiring?
Per the Mandatory Site Visit, TFC is unaware of any low-voltage or gate wiring, however, if it is present the Vendor is responsible for capping it off.
6 Please elaborate on the $75.00 per calendar day for late completion on the Liquidated damages. Until when is the project term, how many calendar days
Vendor is to provide a schedule per section 10. Bid Form, with days needed to complete project. Liquidated damage are there commencing to complete the project once a Notice to Proceed is provided?
occurs when the Vendor goes over the days scheduled to complete.
7 Is the Vendor to provide a bid response for how many calendar days this project will take?
IFB packet section 10. Bid Form requires the Vendor to provide a schedule.
8 In the current scope of work, it states ‘Construct gates with reinforced wood frame(s) or steel frame(s) (Alternate A) to prevent sagging; install drop rods and stops for double-leaf gates.’ Please confirm if Vendor is to provide an Alternate price for steel frame? If yes, should Vendor provide that Alternate A price in a pricing schedule?
Provide pricing per section 10. Bid Form within the IFB packet.
9 Will the owner provide a mandatory pricing schedule to include Base Bid and any Alternate Bids?
Refer to the answer to question #8 above.
10 Does the owner want separate prices as follows:
Pricing Breakdown (labor, materials, gates, sealer, haul-off)?
Refer to the answer to question #8 above.
11 Does Vendor need to provide both Bids: Mailing (hardcopy) and Emailing (Electronic submission)?
Vendor may submit by either mailing or emailing.
12 Is Builder’s risk insurance required for this project? Refer to section 6 of the IFB for insurance, bonding and compliance requirements
13 Are payment and performance bonds required for this project?
Refer to section 6 of the IFB for insurance, bonding and compliance requirements
14 Please confirm that an IdentoGo background check through DPS is required for everyone working at the project site?
Background checks are required for everyone working on the project site.
15 What are the working days and hours? Monday through Friday from 7:00 AM to
5:00 PM CT.
16 Does Vendor need to provide temporary chain link fencing or orange safety barrier mesh fence for all removed existing fencing?
Refer to Addendum #1, answer to question #3.
17 Please confirm that the new Fence Top Cap will match the existing 8’ section?
Refer to 2. Scope of Work, section B.
New Fence Construction subsection i.
18 Is the existing fence 6’ in height? This was to be confirmed by the Vendor during the site visit.
19 Will the new fence be 8’ in height? Refer to 2. Scope of Work, section B.
New Fence Construction subsection b.
20 New fence to be installed in exactly the same location as existing?
New fence to replace the existing fence in the same location.
21 Can the new posts be relocated/moved over for better support?
Yes, the new posts may be relocated.
22 Is the Vendor responsible to remove all trees, bushes, brushes that would be in the way of the new fence?
Refer to Addendum #1, answer to question #4.
23 Next to the existing cedar fence on the exterior/outside, there is an existing chain link fence connected at 90 degrees to the cedar fence. Please
This chain link is outside the scope of this solicitation.
advise what, if anything, is Vendor to do in this specific location?
24 In scope of work its 3 horizontal rails to be installed please confirm?
Refer to 2. Scope of Work, section B.
New Fence Construction subsection e.
25 Please confirm that the vendor will need a portable toilet during the project?
Per the Mandatory Site Visit, TSBVI is not allowing access to onsite bathroom facilities. Vendor is responsible for providing a portable toilet or alternative option.
26 Please confirm that awarded vendor will have access inside to conduct work?
The Vendor shall have access to conduct work.
27 Please confirm that all old posts to be completely removed included old concrete?
Refer to 2. Scope of Work, section A.
Demolition & Disposal, subsection a.
28 Please confirm how many gates are to be replaced?
Please provide sizes of each gate?
Refer to 2. Scope of Work, section C.
Gates subsection a.
29 Please confirm that progressive payment can be allowed for this project?
Yes, progressive payment can be allowed.
Vendor can bill monthly for services completed for the previous month. See section IV. Payment in TFC Standard Terms and Conditions linked in the IFB Document.
All other aspects of the IFB # 0006644 remain as is.
Heather Goll TFC Procurement Department Phone: 512-463-1874 Email: Heather.Goll@tfc.texas.gov
RECEIPT OF ADDENDUM #2 OF IFB #0006644
IN YOUR SUBMITTAL THE RESPONDENT SHALL ACKNOWLEDGE RECEIPT OF THIS
ADDENDUM.
Respondent Signature Date
Printed Name Company Name