This is an Invitation for Bid (IFB) issued by the Texas Military Department (TMD) for backflow prevention device repairs at seven buildings at 100 Hensley Ave, Fort Worth, TX 76127. The project involves replacing ten backflow prevention assemblies supporting buildings 1670, 1672, 1673, 1674, 1675, 1676, and 1677, which were identified as deficient during annual testing in August 2024. Responses are due by March 10, 2025 at 2:00 PM CST, with mandatory site visits scheduled for February 18 or 19, 2025 from 10:00-11:00 AM. The initial contract term is one year from the effective date stated in the notice of award. The scope includes furnishing all labor, parts, tools, equipment, appliances, transportation and materials necessary for the complete replacement of the backflow prevention devices.
The project will be awarded to the lowest responsive bidder meeting specifications, with price being a primary evaluation factor along with past performance and ability to meet requirements. Bidders must submit pricing using the mandatory pricing schedule format provided in Attachment G.4. The contractor must maintain specific insurance coverage including workers' compensation, employer's liability, commercial general liability, automobile liability, and umbrella/excess liability. No minimum compensation is guaranteed under the contract, and TMD reserves the right to make an award on the basis of low line-item bid, low total of line items, or in any other combination that serves TMD's best interest.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEXAS MILITARY DEPARTMENT SOLICITATION
NIGP Code
890 - 03 Back Flow Preventers for Water and Sewer Pipe 910 - 60 Plumbing Maintenance and Repair Services: Pressure Tapping Services, Pipe Freezes, Toilets, etc.
968 - 18 Back Flow Preventer Testing Services
SOLICITATION NO.
TMD25-ANG-DP-25304002
TYPE OF SOLICITATION
INVITATION FOR BID (IFB)
DATE ISSUED
01/30/2025
INVITATION FOR BIDS (IFB) - BACKFLOW PREVENTION DEVICE REPAIRS
Respondent must submit their responses via email to:
procurement@military.texas.gov no later than 2:00 P.M. CST on 03/10/2025
FOR INFORMATION CONTACT:
Ronald Bullock
Contract Specialist, CTCD, CTCM
Contract Administrator
PHONE: 512-782-6786
EMAIL: Procurement@military.texas.gov
RESPONSE (Respondent must fully complete)
DISCOUNT FOR PROMPT PAYMENT:➔ 10 DAYS
20 DAYS
30 DAYS
___ DAYS
ACKNOWLEDGMENT OF ADDENDA:
Respondent acknowledges receipt of solicitation addenda and related documents numbered and dated:
ADDENDUM NO. DATE ADDENDUM NO. DATE
NAME AND ADDRESS
OF Respondent:➔
RESPONSE DATE
TELEPHONE NO. (Include area code)
SIGNATURE OF AUTHORIZED REPRESENTATIVE
NAME AND TITLE OF AUTHORIZED REPRESENTATIVE
CERTIFICATION, DISQUALIFICATION, and REMEDIES By signing this document, Respondent represents and warrants that all statements, certifications, and information submitted in response to this solicitation are true, current, complete, and accurate.
Failure to sign will disqualify response. TMD may pursue and enforce any available remedies against the Respondent for making false statements, including disqualifying the Respondent’s response, immediately cancelling any Contract awarded to Contractor, or recommending State of Texas debarment.
TERM, PRICING, and FUNDING The initial Contract term is effective on the effective date stated in the notice of award (or purchase order if there is no notice of award) and expires one (1) year from that effective date.
TMD will not allow changes after Date of Award to terms or pricing during either the initial term of the Contract or any optional renewal period.
mailto:procurement@military.texas.gov mailto:Procurement@military.texas.gov
ANTICIPATED SCHEDULE OF EVENTS
TMD currently anticipates that the selection of successful Respondent and award of the Contract, if any, will proceed according to the following schedule:
Date Time CT Events
01/30/2025 Solicitation Posted to ESBD
02/18/2025 or 02/19/2025
10:00-11:00
AM
Mandatory site visits. 100 Hensley Ave, Building 1671, Fort Worth 76127. Failure to attend one (1) of the site visits will result in disqualification of the response.
02/24/2025 2:00 PM Last day to submit written questions for clarification to
TMD
As Appropriate Estimated date for TMD to post Question and Answer (Q&A) document to ESBD
03/10/2025 2:00 PM Deadline for TMD to receive Bids
Intentionally Left Blank
Page 3 of 30 Approved 10/16/2021
ANTICIPATED SCHEDULE OF EVENTS
SECTION A—DEFINITIONS
SECTION B—SERVICES AND PRICES
B.1 PRICING REQUIREMENTS
B.2 INVOICE REQUIREMENTS
B.3 PAYMENTS
B.3.1 Billing and Payment B.3.2 Payment Adjustment B.3.3 Late Payment B.3.4 Deductions for Unacceptable Compliance B.3.5 Withholding of Payment B.3.6 Debts and Delinquencies B.3.7 Right to Offset
B.4 MANDATORY PRICING SCHEDULE
B.4.1 Contract Term Pricing
SECTION C - SPECIFICATIONS
C.1 INTRODUCTION
C.2 SPECIFICATIONS and Statement of Work
C.3 DELIVERY
C.4 DELIVERABLES
C.5 ACCEPTANCE CRITERIA
C.6 TMD PERSONNEL
C.6.1. TMD’s Contract Administrator C.6.2 TMD’s Project Manager C.6.3 TMD’s Assistant Project Manager
C.7 INSURANCE REQUIRED UNDER THE CONTRACT
SECTION D—CONTRACT COMPLIANCE REPORTS AND DATA
SECTION E—INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS
E.1 RESPONSE PREPARATION INSTRUCTIONS
E.2 AMENDMENTS TO THE SOLICITATION
E.3 LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF RESPONSES
E.4 SIGNATURES ON RESPONSE SUBMITTED
E.5 RESPONSE ACCEPTANCE PERIOD
E.6 CONTRACT AWARD
Page 4 of 30 Approved 10/16/2021
E.7 TMD’s RIGHTS
E.8 RESPONSE SUBMISSION INSTRUCTIONS
E.8.1 Volume One – Contract Forms and Required Response Information E.8.2 Volume Two – Information Section E.8.3 Volume Three – Cost and Pricing Response
E.9 DISCUSSION AND CORRESPONDENCE
E.10 SUBMISSIONS SUBJECT TO THE TEXAS PUBLIC INFORMATION ACT
E.11 AGENCY POSTING OF CONTRACTS
E.12 ANTICIPATED SCHEDULE OF EVENTS
E.13 SITE VISIT
SECTION F—EVALUATION CRITERIA
SECTION G—LIST OF ATTACHMENTS
BY NUMBER AND TITLE
Page 5 of 30 Approved 10/16/2021
SECTION A—DEFINITIONS
The following terms and acronyms used in this solicitation have the meanings given in this section unless the context indicates otherwise.
“Bid” means the Respondent’s response to this solicitation. A Bid is an offer to contract based upon the terms, conditions, and specifications contained within the solicitation. Bids do not become contracts until they are accepted through an open market purchase order.
“Respondent” means the individual, business entity, or organization that submits a response in reply to this solicitation with intent to contract with TMD.
“Business Days” means Tuesday through Friday except for federal, state, and legal holidays observed by the State of Texas.
“Business Hours” means 6:30 a.m. to 5:15 p.m. Central Time.
“CT” means Central Time.
“Contract” means this formal, written, and legally enforceable agreement between TMD and Contractor.
“Contractor” means the individual, business or other entity awarded the Contract. In the context of submitting a response, “Contractor” also means “Respondent” and “Vendor.”
“Date of Award” means the date the Contract is fully executed.
“Days” means calendar days unless otherwise specified.
“TMD” means the Texas Military Department of the State of Texas, a state agency in the executive branch created under Texas Government Code Ch. 437.
“Fiscal Year” means any of the one (1) year periods beginning September 1 and ending August 31 used for annual budgetary purposes by the State of Texas.
“Parties” means Contractor and TMD.
“Vendor” means the individual, business entity, or organization at any stage in the procurement or contracting process (prior to response, during response, and after contract award).
Page 6 of 30 Approved 10/16/2021
SECTION B—SERVICES AND PRICES
B.1 PRICING REQUIREMENTS
Pricing Instructions
A. TMD seeks and Contractor shall provide the services described in Section C, Specifications on a no minimum, as needed, as requested basis. Pricing is firm fixed price for the services requested and authorized by TMD as provided under the Contract.
Respondent must price the response on this basis.
B. Contractor must deliver and provide the services in compliance with all requirements of the Contract with such payment to be processed by TMD after TMD’s receipt, testing and acceptance of the services.
C. Respondent must submit a response that include all costs, fees, licenses, and expenses for Contractor’s delivery of the services and performance under the Contract and will represent Contractor’s sole compensation under the Contract. No minimum compensation is guaranteed under the Contract. No payments may be approved or made prior to TMD’s acceptance as provided in the Contract.
D. TMD reserves the right to make an award on the basis of low line-item bid, low total of line items, or in any other combination that will serve the best interest of TMD and to reject any and all items bid at the sole discretion of TMD. TMD also reserves the right to accept or reject all or any part of any response, waive minor technicalities and award the response to best serve the interests of TMD.
E. Catalogs, brand names, or manufacturer’s references are descriptive only, and indicate type and quality desired. Bids on brands of like nature and quality will be considered unless advertised under Texas Government Code § 2155.067. If a Respondent believes it can satisfy these specifications, it should bid its goods or services and explain how the specifications will be adequately met.
F. If bidding on specifications other than those stated within this solicitation, bid should show manufacturer, brand, or trade name, and other description of product offered. If other than brand(s) specified is offered, specifications, illustrations, and complete descriptions of product offered must be included with bid. Failure to take exception to specifications or reference data will require Respondent to furnish specified brand names, model numbers, etc.
G. Unless otherwise specified, all items bid must be new and unused and of current production.
H. All electrical items must meet all applicable Occupational Safety and Health
Administration (OSHA) standards and regulations and bear the appropriate listing from Underwriters Laboratories (UL), Factory Mutual Research Corporation (FMRC), or National Electrical Manufacturers Association (NEMA).
Page 7 of 30 Approved 10/16/2021
I. Consistent and continued tie bidding may cause rejection of bids by TMD and investigation for anti-trust violations.
B.2 INVOICE REQUIREMENTS
Invoices are Contractor’s billing for goods or services rendered. TMD will pay Contractor on the basis of itemized invoices submitted to and approved by TMD. The invoices must show the actual deliverables provided and the attendant charge. Itemized invoices must clearly identify the project phase or title, deliverables delivered, the number of hours that each allocated employee worked if applicable, and the date range of work performance for this associated charge.
A. Contractor’s invoice must include the following:
1. the Contract number or Purchase Order number;
2. remittance address; and
3. any prompt payment discount offered.
B. Contractor must send an email with the invoice copy to Payables@military.texas.gov and to the Contract Monitor (if applicable).
An original, hard-copy invoice, if required, will be submitted to the office designated below:
Texas Military Department (TMD) Attn: Accounts Payable Department
P.O. Box 5218, Building 11 Austin, Texas 78763-5218
The State of Texas will not incur any penalty for late payment if the invoice fails to conform to the requirements of this section or if Contractor did not mail the invoice to the appropriate addresses identified in this section.
B.3 PAYMENTS
A. TMD recommends that Contractor receive payments by electronic funds transfer (EFT), also known as direct deposit. If Contractor elects to be set up for direct deposit payment, Contractor must submit a completed Direct Deposit Authorization Form (ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121)).
B. Regardless as to whether Direct Deposit is chosen, Respondent must submit a completed Texas Application for Payee Identification Number (ATTACHMENT G.2 Application for Texas Identification Number #_AP_152) to the following address:
Texas Military Department (TMD) Attn: Accounts Payable Department
P.O. Box 5218, Building 11 Austin, Texas 78763-5218
Reference: Contractor Set-up for Solicitation TMD25-ANG-DP-25304002 mailto:Payables@military.texas.gov
Page 8 of 30 Approved 10/16/2021
Notes: Contact Ronald Bullock when completed 512-782-6786 or Procurement@military.texas.gov
C. If Contractor has previously submitted a completed Contractor Direct Deposit Authorization Form to TMD for another separate contract, another form is not required to be submitted.
B.3.1 Billing and Payment
A. TMD will not make any payments of any amount to Contractor until an accurate invoice is received that complies with Section B.2 above. TMD will notify Contractor if invoice is deemed to be inaccurate within 20 days of receipt.
B. Texas Government Code Chapter 2251 (the Prompt Payment Act) will govern payment and accrual of interest on any overdue payments.
C. If TMD, for any reason, including lack of supporting documentation, disputes any items in any invoices submitted by Contractor, TMD will place a hold on the disputed items and may pay the remaining amount of the invoice. TMD will timely notify Contractor of the dispute and request clarification or remedial action.
D. If the dispute is resolved in Contractor’s favor, TMD will pay the remaining portion of the original invoice in accordance with the Prompt Payment Act. If the dispute is resolved in TMD’s favor, Contractor must resubmit an invoice reflecting all corrections.
B.3.2 Payment Adjustment
A. TMD may elect to deduct from Contractor payment as specified in this section or any amount specified, or any money determined to be due as specified in the Contract.
B. If it is determined that the remaining amount of Contractor payment is not adequate to cover the money determined to be due to TMD, then all remaining Contractor payments will be withheld and an invoice issued to Contractor for the remaining amount due.
C. Contractor must pay the invoiced amount within 30 days of receipt unless Contractor and TMD mutually agree on an alternative payment method.
B.3.3 Late Payment
Any amount owed to Contractor more than one (1) day beyond the date such amount is due as described in this section will accrue interest each day that such amount is not paid at the rate specified by Texas Government Code § 2251.025, provided; however, that this provision will not excuse failure by TMD to make payment in strict accordance with the Contract.
B.3.4 Deductions for Unacceptable Compliance
If Contractor fails to comply with the terms of the Contract, TMD may withhold Contractor’s payment. If non-compliance results in TMD purchasing goods or services from
Page 9 of 30 Approved 10/16/2021 another entity to remedy the non-compliance, TMD will deduct those costs from Contractor’s payment.
B.3.5 Withholding of Payment
A. TMD will have the right to withhold Contractor’s payment until the failures described below have been corrected.
1. Failure to submit reports or other documentation required in Section D—Contract Compliance Reports and Data required from Contractor;
2. Failure to comply with background check or security requirements;
3. Failure to respond to audit reports; and
4. Failure to correct identified areas of non-compliance to the satisfaction of TMD within ten days upon receipt of written notification.
B. TMD will not pay interest to Contractor for monies so withheld.
C. Contractor’s withheld payment will be released upon TMD’s satisfaction that compliance has been achieved for 30 consecutive days.
D. In the event that money is due to TMD for Contractor’s failure to provide adequate maintenance or replacement of the property as required in the Contract, the amount required for TMD to correct deficiencies and replace property will be withheld from the final payment.
E. With the exception of disputed issues, such withholding of final payment by TMD will not exceed 120 days from date of the Contract’s termination.
B.3.6 Debts and Delinquencies
TMD is prohibited from issuing any payment to a person or entity that has been reported as having an indebtedness or delinquency to the State of Texas. Contractor agrees and understands that, to the extent Contractor owes any debt or delinquent taxes to the State of Texas, TMD will apply any payments or other amounts Contractor is otherwise owed under the Contract toward the debt or delinquent taxes until the debt or delinquent taxes are paid in full. Contractor must comply with all applicable laws regarding satisfaction of debts or delinquencies to the State of Texas.
B.3.7 Right to Offset
In the event TMD determines that Contractor owes money to TMD under any contract or purchase order, TMD, upon providing Contractor with written notice of its intent to offset, will have the right to withhold monies due to Contractor with respect to the Contract or with respect to any other contract or purchase order with TMD and apply such monies to the money due to TMD.
Page 10 of 30 Approved 10/16/2021
B.4 MANDATORY PRICING SCHEDULE
B.4.1 Contract Term Pricing
The Respondent must submit its bid price within the Pricing Table located in Attachment G.4 Mandatory Pricing Schedule, replicating, as necessary, in its exact format.
Bid price must be submitted on the Mandatory Pricing Schedule. Respondents will price per unit shown. Unit prices will govern in the event of extension errors. If a price quotation is submitted as part of Bid, the quotation must be referenced in the response and signed by Respondent to establish formal linkage to the Bid.
Contractor must provide the number of calendar days to perform the work from notice of award to Substantial Completion at the bid time with their proposal (Attachment G.4 Mandatory Pricing Schedule).
Bid prices are firm throughout the term of the Contract. “Discount from List” bid pricing is not acceptable unless requested. Cash discounts are not considered in determining an award. Cash discounts offered will be taken if earned.
Page 11 of 30 Approved 10/16/2021
SECTION C - SPECIFICATIONS
C.1 INTRODUCTION
The Texas Military Department (TMD) is seeking a Contractor to furnish all labor, parts, tools, plant equipment, appliances, transportation and materials necessary. The Contractor will need to replace ten backflow prevention assemblies supporting seven (7) buildings (BLDGS 1670, 1672, 1673, 1674, 1675, 1676, 1677). The Contractor shall procure and install proper system components to complete the repairs. All parts and components must be new.
Job location is at TMD’s 100 Hensley Ave Fort Worth, TX 76127-1671.
C.2 SPECIFICATIONS AND STATEMENT OF WORK
TMD requires the replacement of ten backflow prevention assemblies supporting seven (7) buildings (BLDGS 1670, 1672, 1673, 1674, 1675, 1676, 1677). These deficiencies were identified during the annual backflow assembly testing in August 2024.
Objectives: It is the TMD’s intent for the Contractor to provide a turnkey backflow prevention repair for listed backflow assemblies in order to bring the systems back to full functioning capabilities.
TMD will provide drawings or as-builts upon request and are for reference use only. Contractor shall verify all existing conditions and dimensions.
TMD shall furnish access to electrical power and water.
Contractor shall adhere to the current version of all applicable regulations, standards, specifications, UFCs, and UFGSs. References of particular importance include:
A. Air National Guard (ANG) ETL 1-01-01, Air National Guard Design Policy B. Uniform Plumbing Code C. Unified Facilities Criteria (UFC)3-420-01 D. UFC 3-440-01 Backflow Prevention E. Unified Facilities Guide Specifications (UFGS) 02 61 00 Backflow Prevention Assemblies F. American Society of Sanitary Engineering (ASSE) 1013, American Society of Sanitary Engineering
(ASSE) Series 1000 Standard for Backflow Prevention Devices G. National Fire Protection Association (NFPA) 101, Life Safety Code H. Underwriter's Laboratories (UL) Listed to US safety standard
C.2.1 General Requirements
A. Security: The government may prohibit installation access to anyone categorized as a security concern. These concerns may include but are not limited to: record of criminal conduct (active arrest warrant), felony conviction, illegal drug involvement, personal conduct, registration on any sexual offender registry, record of convictions/charges stemming from disrespect for law, and non-us citizen without proper documentation. Contractor shall submit requests to government contact a minimum of two business days prior to required base access.
Page 12 of 30 Approved 10/16/2021
B. Cultural Resources: The contractor shall halt any ground disturbance activity in the event that any Native American or other historical artifacts, fossils, human remains, unmarked graves, or burial sites are found. Report any possible observations to the Contracting Officer. The Contracting officer shall suspend performance at the site of work and notify the Base Civil Engineer and Environmental Office. Performance cannot resume until directed by the Contracting Office.
C. Normal working hours are Tuesday through Friday, 6:30 am to 5:15 pm.
D. Contractor must coordinate access to the site with the TMD Project Manager, coordination will be done in writing.
E. Contractor must perform a pre-work walk-through of entire job site with the TMD
Contract Manager to verify current conditions before any work begins.
F. Photographs during the pre-work walk-through will only be permitted with preapproval from the TMD Project Manager.
G. Contractor must conduct pre-task and pre-construction meetings with subcontractors and send minutes to the TMD Project manager in writing before any work begins.
H. Contractor must provide a written list of at least three (3) names and 24-hour contact numbers to the TMD Project Manager.
I. Contractor must provide weekly written progress reports to TMD Project manager in writing.
J. Contractor must provide weekly safety meetings and provide them to TMD Project
Manager in writing.
K. Contractor must provide full-time, on-site, supervision whenever work is performed.
L. Contractor must provide a qualified Superintendent with five years of experience as a general contractor on demolition work, Quality Check (QC) qualified, OSHA 30 hrs. to be onsite during all phases of work.
1. The Superintendent/QC must not perform manual labor nor be a parts runner.
2. Contractor must provide written evidence of Superintendent’s qualifications before any work begins.
M. Contractor must provide the name of the full-time, on-site, supervisor in writing, to the TMD Project Manager before work begins each day.
N. Contractor provided supervisor must be a direct employee of the Awarded
Contractor.
O. Contractor shall observe all applicable Occupational Safety and Health Administration
(OSHA) and State safety precautions pertaining to the contract.
Page 13 of 30 Approved 10/16/2021
P. Contractor must provide all safety and OSHA to the Project Manager prior to any work begins.
Q. Contractor must always enforce Personal Protective Equipment (PPE) requirements.
R. Contractor must coordinate with the TMD Project Manager for approval prior to assigning a new superintendent that was not previously listed in the bid submission.
Certificate of qualifications must be provided in writing.
S. Contractor shall ensure any potentially sensitive documentation, military equipment, or ordinances discovered during the contract period is immediately reported to the TMD Project manager for consultation on proper disposal or recovery procedures & methods.
T. Contractor must ensure that all items, and debris, that require disposal are removed from the site and are disposed of in accordance with all Federal, State, and local laws, rules, and regulations.
U. Contractor must provide daily cleanup.
V. Contractor must keep a clean and safe work area at all times.
W. Contractor must mitigate/isolate dust in work area at all times.
X. Contractor must provide tracking logs and manifests for all hazardous materials, trash, and recycling materials.
Y. Contractor must separate all recyclable materials separate from the rest of the disposable materials in an area for TMDs recycling manager.
Z. Contractor must ensure that TMD has first rights to any salvageable materials.
AA. TMD Project Manager will coordinate with TMD Recycling for the pick-up of the recyclables.
BB. Contractor must clean up and dispose of all debris related to, but not necessarily identified, upon completion of all work covered in the SOW.
CC. Contractor must ensure all rules, laws, and regulations are followed when transporting and disposing of any items generated from the statement of work.
DD. Contractor must provide protection to Existing Assets.
EE. Contractor must protect all existing improvements, road surfaces, curbs, sidewalks, trees, shrubbery, sprinkler systems, drainage structures, and other like items to prevent damage.
FF. Contractor must repair any damage caused by any work provide in the performance of this scope of work at the expense of Contractor.
Page 14 of 30 Approved 10/16/2021
GG. Contractor must maintain access on adjacent roads for traffic.
HH. Contractor must provide traffic signage, flagmen, and other safety items to ensure the safety of workers and the host site occupants.
II. Contractor must provide a written notification of any interruption of services to adjacent buildings to the Program Manager with-in 72-hours of discovery.
JJ. Contractor must ensure any damage caused to other areas in the performance of the
SOW shall be returned to it’s previous condition prior to final inspection.
KK. Contractor must ensure any subcontracted trades, such as plumbing or electrical contractors, provide license hard copies to the TMD Project Manager before they perform any work.
LL. Contractor must provide a bar chart schedule to TMD’s Project Manager for approval before any beginning.
MM. Contractor must provide written notification to TMD’s Project manager when the work is complete and provide a preferred date that the Contractor must be prepared for a Substantial Completion Inspection.
NN. TMD’s Project Manager shall inspect the work and provide the contractor with a list of deficiencies (Punch List) that the contractor must remedy within 21 days.
OO. Contractor must notify TMD’s Project Manager, in writing, when the Contractor is ready for a Final Inspection.
PP. TMD is not responsible for any additional work the contractor completes that has not been approved by the Contract Administrator in the form of a change order.
C.2.2 Specific Requirements
The Contractor shall perform the following, but not limited to:
A. General tasks supporting Reduced Pressure Zone (RPZ) backflow assembly repair and replacement in all buildings.
1. Prior to each assembly installation, isolate and turn water off to building and drain down water lines.
2. After installation of each assembly, turn on water to building to test for leaks and proper working conditions.
3. Contractor shall test all newly installed backflow devices IAW required regulations and provide testing certificates to the TMD Project Manager.
4. Remove existing components and other debris caused from construction, as required. All materials to be reviewed prior to disposal. TMD reserves right to repurpose parts/components of removed units to be used on other existing systems elsewhere.
Page 15 of 30 Approved 10/16/2021
5. Contractor to furnish all required transportation, hoisting, and securing for all equipment required for this project.
6. Furnish and install electrical as required to connect new assemblies. Any electrical and instrumentation wiring shall comply with manufacturer’s requirements.
Disconnect and reconnect electrical as required.
7. Contractor will perform testing and certification of new components upon completion of installation in accordance with industry standards and applicable codes, UFCs, and UFGSs. Perform annual backflow prevention assembly test and maintenance report on new device. The testing will include a forward flow test, a backflow test, and a check for leaks. Complete and submit updated test results.
8. Coordinate inspections as required by the contracting officer’s representative (COR). The completion of a government inspection does not relieve the contractor of its responsibility to comply with required project documents, code, or the need to provide quality materials and workmanship.
9. Clean job site daily. Site shall be cleaned and restored to initial cleanliness prior to final acceptance.
10. Request a pre-final inspection from the government for the purpose of identifying and resolving common project deficiencies. Request a final acceptance inspection from the government for the purpose of identifying and resolving minor less-common deficiencies prior to project closeout.
11. The contractor shall immediately notify the COR upon discovery of any unforeseen site conditions or discrepancies between the government’s project documents and manufacturer’s guidance.
B. B1670 - Chiller Makeup Water RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty backflow assembly over head for chiller make up water.
2. Install one(1)-inch Watts 009 (or approved equivalent) back flow assembly device at 5ft above Finnish flooring via code using Type L copper piping and ProPress (or approved equivalent) fittings.
3. Install anchors and mounting brackets to properly support the new device.
C. B1670 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty two and a half (2-1/2)-inch backflow assembly on main line.
2. Install Watts 909 (or approved equivalent) backflow assembly with new isolation valve and wye strainer including air gap for device.
D. B1672 - Hot Water Makeup RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty backflow assembly over head for hot water make up.
2. Install three-quarter (3/4)-inch Watts 009 (or approved equivalent) back flow assembly device at 5ft above Finnish flooring via code using Type L copper piping and ProPress (or approved equivalent) fittings.
E. B1673 - Chiller Makeup Water RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty backflow assembly over head for chiller make up water.
Page 16 of 30 Approved 10/16/2021
2. Install one(1)-inch Watts 009 (or approved equivalent) back flow assembly device at 5ft above Finnish flooring via code using Type L copper piping and ProPress (or approved equivalent) fittings.
F. B1673 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty two and a half (2-1/2)-inch backflow assembly on main line.
G. B1674 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty two(2)-inch backflow assembly on main line.
2. Install Watts 009 (or approved equivalent) backflow assembly five(5) feet (ft) above finish flooring with new isolation valve and wye strainer including air gap for device.
H. B1675 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty three(3)-inch backflow assembly on main line.
I. B1675 - Parts Washer RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty half(1/2)-inch backflow assembly from parts washer.
2. Install Watts 009 (or approved equivalent) backflow assembly with new isolation
J. B1676 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty three(3)-inch backflow assembly on main line.
K. B1677 - Mainline RPZ Backflow Assembly Replacement
1. Disconnect, cut out, and remove faulty one and a half(1-1/2)-inch backflow assembly on main line.
2. Install Watts 009 (or approved equivalent) backflow assembly with new isolation
C.3 DELIVERY
The contractor shall perform the following:
Page 17 of 30 Approved 10/16/2021
A. Contractor must provide submittals in advance to the TMD Project Manager prior to purchase.
The TMD Project Manager will review and approve all submittals prior to purchase.
B. Contractor must provide a release of claims after completion of project.
C. Contractor must provide a letter of guarantee after completion of project.
D. Contractor must provide minimum one (1) year on all workmanship and standard manufacturer’s warranty on products.
C.4 DELIVERABLES
Contractor shall provide a turnkey backflow prevention replacement for listed backflow assemblies in order to bring the systems back to full functioning capabilities.
C.5 ACCEPTANCE CRITERIA
In determining the best value, TMD shall consider the following best value factors:
A. Price of the item, to include total cost of ownership, such as, but not limited to, installation costs, life cycle costs, and warranty provisions.
B. Compliance with the stated specifications coupled with the quality and reliability of the goods and services, such as, but not limited to, fitness for use that meets or exceeds Customers expectations and the characteristics of the product or service that bear on its ability to meet the stated/implied needs.
C. Delivery timeframe from receipt of purchase order, after receipt of order (ARO).
D. Indicators of probable performance under the Contract to include, but not limited to: past vendor performance; financial resources; ability, capacity, and skill to perform the Contract or provide the serviced required; experience or demonstrated capability and responsibility;
references; and the vendor’s ability to provide reliable maintenance agreements and support.
E. Other relevant factors, such as, but not limited to, the vendor’s ability to comply with laws relating to the goods or services, the vendor’s anticipated economic impact to the State or a subdivision of the State, including potential tax revenue and employment, the effect of a purchase on agency productivity, and the cost of any employee training associated with the purchase.
C.6 TMD PERSONNEL
C.6.1. TMD’s Contract Administrator
A. The Contract Administrator for the Contract is Ronald Bullock.
B. The telephone number for the Contract Administrator is 512-782-6786.
C. The email address is Procurement@military.texas.gov
Page 18 of 30 Approved 10/16/2021
The Contract Administrator is responsible for the general administration of the Contract, negotiation of any changes, and issuance of written amendments to the Contract.
C.6.2 TMD’s Project Manager
A. The Project Manager for the Contract is SSgt David Shamburger.
B. The telephone number for the Project Manager is 817-852-3328.
C. The email address is David.Shamburger.5@us.af.mil
C.6.3 TMD’s Assistant Project Manager
A. The Project Manager for this Contract is MSgt Meeks, Michael.
B. The telephone number for the Project Manager is 817-852-3336.
C. The email address is Michael.Meeks@us.af.mil
TMD’s Project Manager for the Contract is responsible for the overall management and coordination of the Contract and will act as the central point of contact for TMD. The Project Managers has full authority to act for TMD in the performance of any project connected to the Contract. The Project Manager or a designated representative will meet with Contractor’s Project Manager to discuss problems as they occur.
C.7 INSURANCE REQUIRED UNDER THE CONTRACT
In its response, Respondent must provide a statement of its intent to obtain and maintain for the term of the Contract (and any renewal periods or additional extensions) the minimum insurance coverage specified. Respondent should also describe other insurance coverage maintained by Respondent in the ordinary course of business and provide proof of same in its response. Proof of insurance and bond coverage may be provided in the form of current certificates of insurance. TMD and the State of Texas do not accept “self-insurance” coverage.
The awarded Contractor is required, within five (5) business days of Notice of Award or Purchase Order, to provide TMD with current certificates of insurance or other proof acceptable to TMD.
Failure to submit acceptable proof of insurance within such time period may result in TMD’s revocation of the award. Contractor must maintain the required insurance during the initial term and any optional renewal period exercised. Contractor is responsible for ensuring its subcontractors’ compliance with all insurance requirements.
Minimum Required Amounts of Insurance Coverage
Type of Insurance Each Occurrence/Aggregate
Workers’ Compensation Statutory Limits for the State of Texas or for any state Contractor’s employee resides in
Employer’s Liability Bodily Injury by Accident Bodily Injury by Disease
$1,000,000 Each Accident $1,000,000 Each Employee mailto:David.Shamburger.5@us.af.mil mailto:Michael.Meeks@us.af.mil
Page 19 of 30 Approved 10/16/2021
Bodily Injury by Disease $1,000,000 Policy Limit
Commercial General Liability (occurrence based)
Bodily Injury and Property Damage $1,000,000 Each Occurrence Limit $2,000,000 Aggregate Limit $2,000,000 Products/Completed Operations Aggregate Limit $1,000,000 Personal Injury and Advertising Liability $50,000 Damage to Premises Rented $5,000 Medical Payments
Automobile Liability All Owned, Hired and Non-Owned Vehicles
$500,000 Combined Single Limit (for each accident)
Umbrella/Excess Liability $1,000,000 Per Occurrence
Commercial Crime $50,000 Each Occurrence
All required insurance coverage must be issued from a company or companies with a Financial Strength Rating of “A” or better from A.M. Best Company, Inc.
All insurance policies for required coverage must be issued by companies authorized to do business under the laws of the State of Texas and in a form satisfactory to TMD. All required insurance contracts must:
(1) be written on a primary and non-contributory basis with any other insurance coverages Respondent currently has in place; and
(2) include a Waiver of Subrogation Clause.
All certificates of insurance for required coverage other than workers’ compensation and professional liability must name the Texas Military Department as additional insured.
Contractor shall:
A. provide written documentation under this section to the Contract Administrator by email at least 30 calendar days prior to any cancellation, non-renewal, or material change of a required policy.
B. ensure all insurance policies and certificates of insurance for required coverage are written to include all products, services, and locations related to Contractor’s performance under the Contract; and
C. deliver all renewals policies at least ten calendar days prior of any expiration of a required policy to Contract Administrator by emails. All renewal policies and corresponding certificates of insurance must meet all terms set forth in the Contract.
D. ensure that all provisions of the Contract concerning liability, duty, and standard of care, together with the indemnification provision, are underwritten by contractual liability coverage sufficient to include the Contractor’s obligations under the Contract.
E. obtain and maintain insurance policies that provide coverage for Contractor’s principals, officers, directors, shareholders, partners, owners, agents, employees, subcontractors, independent contractors, and any other representatives who may provide services under the Contract.
Page 20 of 30 Approved 10/16/2021
SECTION D—CONTRACT COMPLIANCE REPORTS AND DATA
Contractor must submit the reports and all additional Contractor documentation requirements in this section during the course of the Contract. These deliverables may be revised, or additional ones may be required at TMD’s sole discretion.
FREQUENCY DUE DATE REPORT ITEM AUTHORITY
TMD PERSONNEL TO
RECEIVE REPORT
Upon Completion
Invoicing – Specific to the Contract
IFB Section B.2 Payables@military.texas.gov with a copy to Contract Monitor mailto:Payables@military.texas.gov
Page 21 of 30 Approved 10/16/2021
SECTION E—INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS
E.1 RESPONSE PREPARATION INSTRUCTIONS
Purpose of Instructions
A. These instructions are designed to assure the submission of information essential to the understanding and the comprehensive evaluation of Respondent’s response.
B. Responses must be prepared in accordance with these instructions providing all required information in the format specified.
C. Failure of a response to show compliance with these instructions and submit all documentation may be grounds for disqualification of the response from further consideration unless stated otherwise within this solicitation.
Submission of responses
A. Responses must be received by TMD no later than the deadline established and submitted to:
Texas Military Department Procurement and Contract Services Procurement@military.texas.gov Subject: Solicitation No. TMD25-ANG-DP-25304002
B. Respondent must demonstrate that Respondent’s operations conform to applicable TMD, state, and federal policies and standards.
C. Respondent must submit only material directly pertinent to the requirements of this solicitation. Extraneous narrative, elaborate brochures, uninformative public relations material, including Respondent’s policies, procedures, and post orders for which no deviation to TMD Policy is being requested, and other similar documents will not be submitted.
E.2 AMENDMENTS TO THE SOLICITATION
A. If this solicitation is amended all terms and conditions which are not modified remain unchanged.
B. Respondents must acknowledge receipt of all amendment(s) to this solicitation by signing and returning the amendment(s), identifying the amendment number and date in the space provided for this purpose on the form for submitting a response or by letter.
C. Respondent must submit the acknowledgement to TMD by the time specified for receipt of responses.
D. Failure to acknowledge amendment(s) by Respondent may subject its response to rejection.
E.3 LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF RESPONSES
A. Responses will be time stamped at the office designated in the solicitation on or before the date and time specified in this solicitation.
Page 22 of 30 Approved 10/16/2021
B. Any response received at the designated location after the specified date and time will not be considered.
C. Responses cannot be altered, amended, or modified after closing date and time.
D. Alterations made before closing time will be initialed by Respondent or its authorized representative.
E. No responses can be withdrawn after closing date and time without approval by TMD. Should a Respondent, after closing time, request its response be withdrawn, the request must be made in writing.
F. TMD is not responsible for submissions delivered to TMD after the date and time stated on the first page of this solicitation. It is the Respondent’s responsibility to ensure that it submits, and that TMD receives, its complete response timely. TMD recommends that Respondent submit their complete response well in advance of the due date and time stated on the first page of this solicitation.
G. TMD takes no responsibility for electronic responses that are captured, blocked, filtered, quarantined, or otherwise prevented from reaching the proper destination server by any TMD anti-virus or other security software.
E.4 SIGNATURES ON RESPONSE SUBMITTED
A. Responses from a partnership will be signed in the firm name by at least one (1) general partner or in the firm name by an attorney-in-fact.
B. Responses signed by an attorney-in-fact, will include a Power of Attorney evidencing the authority to sign response, dated and executed by all partners in the firm.
C. Responses from a corporation will have the correct legal corporate name and the signature of an authorized officer of the corporation.
D. The title of office held by the person signing for the corporation will appear below the signature of the officer.
E. Responses from an individual doing business under a firm or fictitious name will be signed in the same name of the individual doing business under the proper firm name.
F. Joint venture responses will be signed by all members or by a member of the joint venture if there is attached to the response a copy of the joint venture agreement evidencing that the response is signed by the member with authority to bind the joint venture.
E.5 RESPONSE ACCEPTANCE PERIOD
A. All responses will be valid for 120 days after the solicitation opening date and will constitute an irrevocable response to TMD for the 120-day period.
B. Such period may be extended beyond the 120 days upon mutual written agreement of both parties.
Page 23 of 30 Approved 10/16/2021
E.6 CONTRACT AWARD
A. TMD may award one (1) Contract resulting from this solicitation to the responsible Respondent, whose response, is lowest price meeting specifications.
B. A purchase order mailed or otherwise furnished to successful Bidder(s) within the time for acceptance specified in the response will result in a binding Contract without further action by either party.
C. A Purchase Order shall be established in accordance with the specifications, terms and conditions referenced in IFB TMD25-ANG-DP-25304002. The following documents shall be incorporated and made a part of this order and in the following order of precedence:
a. TMD PO DP401-5-### (### To Be Determined)
b. TMD IFB TMD25-ANG-DP-25304002
c. Vendor’s Response to IFB TMD25-ANG-DP-25304002
D. The Contract shall consist of the Notice of Award; this Solicitation, including addenda; and the
Response, including clarifications submitted at the request of CPA. In the event of any conflict or contradiction between or among these documents, the Notice of Award, as modified by any Contract Amendments, controls over the Solicitation and the Response. The Solicitation, as modified by any Addenda, controls over the Response.
E.7 TMD’S RIGHTS
A. TMD reserves the right to waive, change, add or delete any terms or conditions of this solicitation.
B. TMD may:
1. reject any or all responses if such action is in the public interest;
2. accept other than the lowest priced response; and
3. waive minor informalities and minor irregularities in responses received.
C. Waiver of deviations in any response will not constitute a modification of this solicitation and will not preclude TMD from asserting all rights against the Respondent for failure to fully comply with all terms and conditions of this solicitation. Copyrighted responses are unacceptable and are subject to disqualification as non-responsive. TMD reserves the right to make any corrections or include additional requirements in the resulting Contract prior to issuance which are necessary for TMD’s compliance, as an agency of the State of Texas, with all state and federal requirements. TMD reserves the right to disqualify any response which asserts any copyright on any TMD-created form which is specifically designated by this solicitation to be a form that will be completed and included in a response submitted in response to this solicitation.
D. TMD reserves the right to reject any one (1) response or all responses or portions of responses submitted in response to this solicitation.
E. The submission of a response has the effect of waiving proprietary rights or confidentiality.
Page 24 of 30 Approved 10/16/2021
F. All responses and any content provided by the Respondent are considered the property of TMD for use for the life of any resulting Contract as determined by TMD with respect to the scope of the project.
G. TMD is not liable for any costs or damages that may be incurred by Respondents or prospective Contractors in the preparation, formulation, or presentation of a response.
H. In case of ambiguity or lack of clarity, TMD may adopt such interpretations as may be advantageous to TMD.
I. TMD reserves the right to withdraw this solicitation at any time for any reason.
J. TMD reserves the right to award no Contract and to solicit additional responses at a later time.
K. TMD incurs no obligation regarding this solicitation unless and until a Contract is fully executed by the parties. However, all responses received by TMD will remain confidential until the evaluation process is complete.
L. TMD will not hold a public bid opening event.
E.8 RESPONSE SUBMISSION INSTRUCTIONS
E.8.1 Volume One – Contract Forms and Required Response Information
This section will contain the following completed Contract sections:
A. Solicitation, Page 1 (with amendment(s) noted on this page or signed amendment(s) attached to this form);
B. The name and address of Respondent’s insurance carrier(s), along with a statement of liability from the carrier(s) issuing the policies saying that such policies are available to Respondent. For the purpose of responding to this solicitation, Respondent will not be required to purchase insurance but must show the ability to provide such insurance as specified in the section entitled “Insurance Requirements,” if Respondent’s response is selected.
C. A Redacted Solicitation and Contract response if applicable;
D. Attachment G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121), completed if choosing direct deposit as a possible payment option;
E. Attachment G.2 Application for Texas Identification Number #_AP_152;
F. Documentation from the appropriate state entity that indicates that Respondent is properly certified to conduct business in the State of Texas (e.g., The Certificate of Existence from the Texas Secretary of State and the Certificate of Account Status from the Comptroller of Public Accounts); and
Page 25 of 30 Approved 10/16/2021
E.8.2 Volume Two – Information Section
A. Cover Page: List name and address of Respondent, date of response, solicitation identifier, and signature of authorized official.
B. Information Sheet: Including all information required of Respondent and any subcontractors.
1. Name and address (including telephone number) of Respondent and all subcontractors.
2. Business form of Respondent and its subcontractors (e.g., corporation, partnership).
3. Date and state of incorporation.
4. Names and addresses of principal officers, directors, or partners.
C. Respondent must identify and provide in the enclosed, Verification of Experience, a minimum of three (3) past or current projects of similar size and complexity performed within the past five (5) years. Respondent must provide, at a minimum, the contact name, email address, phone number, and title for each reference provided. Additionally, Respondent must provide project begin and end dates, brief descriptions of deliverables, overall costs, and scope of work performed.
D. The Respondent must specifically address, within its response, the following requests for information as detailed throughout this solicitation. TMD has endeavored to include a complete listing of such submittal requests; however, in the event TMD omitted a requirement, Respondent is responsible for ensuring that all such information is included within its response.
1. B.4, Pricing Schedule
2. C.7, Insurance
3. C.8, Bonds
4. All required submittals under Section E.8.1, Contract Forms and Required response Information and Section E.8.2, Information Section.
E. Exceptions. No exceptions should be included in response. Bids received that take any exceptions to this solicitation will be disqualified and deemed non-responsive to the solicitation and TMD will remove the bid from further consideration.
E.8.3 Volume Three – Cost and Pricing Response
Respondent must provide updated pricing schedules in the exact format noted in Section B.4 of this solicitation.
E.9 DISCUSSION AND CORRESPONDENCE
A. All communications and questions concerning this solicitation, including any of a technical nature, will be made in writing only to:
Ronald Bullock, CTCD, CTCM, Contract Administrator
TMD
Page 26 of…