ES7034 (Attachment 5).pdf
PDF 38 KB Posted
- Attached to
- B-2 TLX Kits Federal contract opportunity
- Solicitation number
- FA821321R3042
About this file
This document outlines rework and repair requirements for a federal contract. The contractor must submit rework procedures to the Government Quality Assurance Representative for review prior to implementation, while repair procedures require submission on a Request for Deviation/Waiver form to the Contracting Officer for written approval. For both rework and repair, the contractor must describe the nonconformance cause and corrective actions to prevent recurrence. The procedure must also specify reinspection requirements taking precedence over technical data. These rework and repair requirements flow down to all subcontractors and suppliers.
The related federal contract opportunity is a sole source buy from Universal Propulsion Company for B-2 Weapon System TLX Kits. The solicitation provides the contract line item numbers, national stock numbers, part numbers, and quantities for 16 items to be procured. The procuring agency is the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_FA821321R3042_0003.pdf | ||
| Amend_FA821321R3042_0002.pdf | ||
| Amend_FA821321R3042_0001.pdf | ||
| SPI F01-461-5481.pdf | ||
| B-2 TLX QALI.pdf | ||
| 807-Combined 30 Mar 2021.pdf | ||
| ID-Combined_30 Mar 2021.pdf | ||
| DD Form 1653.pdf | ||
| CADPAD Item Marking Instruction.pdf | ||
| AIR SPEC 30 Mar 2021.pdf | ||
| Solicitation_FA821321R3042.pdf | ||
| SPI F01-499-8853.pdf | ||
| SPI F01-254-8612.pdf | ||
| Form 158 FD2020-21-50092.pdf | ||
| EDL-Combined.pdf | ||
| SPI F01-454-8835.pdf | ||
| ADC SOW.pdf | ||
| SPI F01-461-5515.pdf | ||
| TransInstruction11.pdf | ||
| REPSHIP.pdf | ||
| Packaging SOW.pdf | ||
| Engineer Notes Clarification.pdf | ||
| EDL_1377014618074.pdf | ||
| Bid Sets.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(ES7034)
File details come from the government source that posted it. Updated .