B-2 TLX QALI.pdf
PDF 946 KB Posted
- Attached to
- B-2 TLX Kits Federal contract opportunity
- Solicitation number
- FA821321R3042
About this file
This document contains a quality assurance letter of instruction and a related federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for various TLX kits to be procured under contract number 51-50092, awarded on an unspecified date for the B-2 TLX program. Inspections will include explosive weight verification, x-ray and radiographic film review, lot acceptance testing, sample selection, preparation for shipment verification, and documentation reviews. The federal contract opportunity solicitation seeks bids for various TLX kits with quantities ranging from three to six units per national stock number and part number under solicitation FA821321R3042. The sole source buyer is Universal Propulsion Company with cage code 17610. Delivery is required to support the B-2 weapon system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_FA821321R3042_0003.pdf | ||
| Amend_FA821321R3042_0002.pdf | ||
| Amend_FA821321R3042_0001.pdf | ||
| SPI F01-461-5481.pdf | ||
| 807-Combined 30 Mar 2021.pdf | ||
| ID-Combined_30 Mar 2021.pdf | ||
| DD Form 1653.pdf | ||
| CADPAD Item Marking Instruction.pdf | ||
| AIR SPEC 30 Mar 2021.pdf | ||
| Solicitation_FA821321R3042.pdf | ||
| SPI F01-499-8853.pdf | ||
| SPI F01-254-8612.pdf | ||
| Form 158 FD2020-21-50092.pdf | ||
| EDL-Combined.pdf | ||
| ES7034 (Attachment 5).pdf | ||
| SPI F01-454-8835.pdf | ||
| ADC SOW.pdf | ||
| SPI F01-461-5515.pdf | ||
| TransInstruction11.pdf | ||
| REPSHIP.pdf | ||
| Packaging SOW.pdf | ||
| Engineer Notes Clarification.pdf | ||
| EDL_1377014618074.pdf | ||
| Bid Sets.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
NSN P/N DODIC
1377-01-499-8853ES 200210068-10 JL04
1377-01-461-5486ES 52170-086 WA43
1377-01-461-5520ES 52170-027 WA09
1377-01-461-5529ES 52171-024 WA13
1377-01-461-5530ES 52171-021 WA11
1377-01-461-5538ES 52170-091 WA17
1377-01-461-6040ES 52171-007 WA30
1377-01-461-6043ES 52170-001 WA34
1377-01-461-8064ES 52170-075 WA63
1377-01-461-8066ES 52170-074 WA62
1377-01-461-8069ES 52170-044 WA65
1377-01-461-8074ES 52170-048 WA53
1377-01-461-8082ES 52170-072 WA60
1377-01-461-8304ES 52170-080 WA78
1377-01-462-2328ES 52170-070 WA82
1377-01-463-0549ES 52171-094 WA85
| Sheet1 |
| Blank Page |
| Book1.pdf |
| Sheet1 |
| Text46: 12Jun2020 | |
| 2020-06-12T14:15:34-0600 | |
| JOHNSON.AVERY.STEVEN.1457505112 |
| undefined_8: N |
| Text31: 8. Additional Requirements |
| undefined_7: M |
| Text30: 7. Shippers (DD250, Reports) |
| undefined_6: M |
| Text29: 6. AMMO Data Card Review |
| undefined_5: V |
| Text28: 5. Preparation for Shipment |
| undefined_4: W |
| Text27: 4. LAT |
| undefined_3: V |
| Text26: 3. LAT Sample Selection |
| undefined_2: V |
| Text25: 2. X-Ray/N-Ray |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
3. Randomly select LAT units per latest government approved ATP.
4. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
5. Ensure Paperwork is correct.
6. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
7. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
8. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: VARIOUS (See attached list) |
| DODIC: VARIOUS (See attached list) |
| Text20: 17610 |
| Text19: Collins |
| Part Number Line 2: |
| Contract No: 51-50092 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: B-2 TLX Lines |
File details come from the government source that posted it. Updated .