englewood 112605 (Specs).pdf

PDF 10 MB Posted

Attached to
Cambridge Ave & Highwood Ave. Improvements Project No. 112605
Solicitation number
26-15
Issued by
Camden County, New Jersey

About this file

This specifications document pertains to the City of Englewood, New Jersey's Cambridge Avenue & Highwood Avenue Improvements Project No. 112605, a public works infrastructure project subject to state and local prevailing wage requirements. The project scope encompasses milling and paving operations on Cambridge Avenue and Highwood Avenue with 3 inches of milling and 3 inches of paving, along with supplementary work including base pavement repair, curb and apron replacement, handicap ramp improvements, and catch basin modifications and repairs. The specifications document provides detailed technical requirements across multiple sections covering clearing and grubbing, concrete work, asphalt paving, aggregate materials, equipment specifications, and site preparation standards. A mandatory bidders conference was conducted, and questions regarding plans and specifications should be directed to fvolcy@cityofenglewood.org. The document references prevailing wage compliance in accordance with New Jersey Statutes and requires submission of payroll statements, apprenticeship registrations, and fringe benefit documentation.

The contract requires compliance with New Jersey prevailing wage laws (N.J.S.A. 34:11-56.25 et seq.) and supplementary specifications for state-aided projects as established by the New Jersey Department of Transportation. Bidders must provide subcontractor identification information and are subject to affirmative action requirements and equal employment opportunity provisions. The document specifies requirements for contractor security, liquidated damages provisions, and alternative dispute resolution procedures. Prevailing wage rates apply to all laborers and mechanics on the project, with contractors required to submit certified payroll documentation indicating compliance with applicable wage determinations. The project is funded through state aid mechanisms, and failure to provide required certifications and compliance documentation will prevent contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG

C I T Y

T H

MAR

rovements

PROJE

INSTRUCTION TО 5

ITIONS

SPECIAL PROVISIONS

SPECIFICATIONS

DOCUMENTS

T www.bidnetdirect.com//englewood

B DD

PROVE

ENGLEWOOD, NEW JERSEY

ENGLEWOOD, NEW JERSEY

QUESTIONS REGARDING PLANS AND SPECIFICAT

fvolcy@cityofenglewood.org

SURETY CO DS

EQUAL EMPLOYMENT OPPORTUNITY

PROPOSALS

work ucts

AN

wo wit www.elec.state.nj.u

RACT ND

ilities http://www.nj.gov/labor/Isse/Ispubcon.html.

eme

Alternative Dispute Resolution

IAL ROVISI

CONTRACTOR

SECURITY REQUIRED

BMISSI

LIQUIDATED DAMAGES

N.J.D.O.T SUPPLEMENTARY

SPECIFICATIONS FOR STATE AID PROJECTS

ICATIONS

Safety Red http://access-board.gov/adaag/dws/manufacturers.htm

RA

AT

SECTION NO. ECTION PAGE

1.01 Scope of Work

RAL

1.03 Utility Company Notification

Protection of Traffic (cont.)

1.07 Damages and Repairs to Existing Piping and S

2.04 Payment

ZA

/Or

AN

3.03 Traffic access after working hours

4.02 Clearing and Grubbing

Disposal

9.04 Payment

ENT

Requirements

10.03 Shop Drawings

10.05 Preparation of Subgrade

SA

15.02 Requirements

U

15.07 Dewatering

ructu

15.09 Bridging Trenches

15.10 Pay

17.03 Рayment

G

Aggregate for Light Weight Concrete:

Air Entraining Admixture:

Bar Reinforcement:

nforce

Non-Shrink Grout (for setting leveling plates):

Expansion Joint Fillers:

Integral Hardener:

Waterstops:

21.06 Strength

21.08 Mixing

Required cover spection And Testing

21.11 Concreting In Cold Weather

Ge

22.02 Requirements

22.04 Transportation and Delivery of Mixture

Paym

Thickness (Inches)

Minimum Laydown Temperature (Degrees F)

LES,

23.03 Shop Drawings And/Or Descrip

23.07 Payment

G

24.02 Requirements

24.03 Stockpiles

Coarse Aggregate m

24.07 Blast Furnace Slag

24.09 Dense Graded Aggregate

Fine Aggregate a ckfil

25.05 Payment

27.01 Scope

27.04 Payment

28.01 Scope

28.04

30.02 Requirements

Eq

ILLI

ng

31.01 Scope

31.04 Equipment

31.08 Payment

33.01 Scope

33.02 Requirements

33.04 Equipment

33.06 Portland cement concrete driveway aprons

33.07 Asphalt driveways

33.08 Payment

D

BITU

35.02 Requirements

Ma

35.04 Composition of the

35.05 Equipment

ructi

35.08 Conditioning of Existing Surface

S

35.09 Spreading and Finishing

35.10 Compaction and A

rface

CTABLE

36.01 Scope

36.04 Payment

TOPSOIL

For all general areas:

37.06 Seeding

37.07 Mulching

37.09 Payment

41.02 Payment:

42.02 Payment

RAC T

N.J.S.A. 40A:11-23.2)

Ο

N.J.S.A. 40A:11-23.2

N.J.S.A. 4

N.J.S.A. 40A:11-23c, 1,2, & 3

N.J.S.A. 34:11-56.48

N.J.S.A. 40A:11-2.1

N.J.S.A. 19:44A-20.27

N.J.S.A. 34:11-56.25 et seq.

WOOD

MB

CAMBRIDGE AVE.

& HIGHWOOD AVE. IMPROVEMENTS, PROJECT NUMBER 112605,

(S

"N.J.S.A.54:32B-1 et seq.

N.J.S.A. 34:11-56.48)

Part II

Address:

space ugust https://www.nj.gov/treasury/administration/pdf/RussiaBelarusEntityList.pdf www.state.nj.us/treasury/purchase/pdf/Chapter25List.pdf.

미

ㅁ

August

Failure to provide such will prevent the award of ppropriate assessed as provided by law.

PLEASE PROVIDE FURTHER INFORMATION TO PROHIBITED ACTIVITIES IN RUSSIA OR

August

Π

N.J.S.A. 19:44A-20.27:

Π www.elec.state.nj.us

N.J.S.A. 19:44A-20.27)

N.J.S.A. 40A:11-2.1)

N.J.S.A. 52:34-15)

N.J.S.A. 40A:11-20)

SUBCONTRACTOR IDENTIFICATION

N.J.S.A. 40A:11-16)

0A:11-16, N.J.S.A. 40A:11-16(

N.J.S.A. 34:11-56.25 et seq.)

N.J.A.C. 12:60-1.4, N.J.S.A. 34:11-56.25 tements

Prevailing ignature statements onding

ACTI

GEMENT (CONTINUED)

a.

AMERICAN O ICATION

N.J.S.A. 40A:11-18

N.J.S.A. 40A:11-18

STATEM IENCE AND QUALIFIС S

PHONE NUMBER(S)

& EMAIL ADDRESS(ES)

STATEMENT O NCE AND QUALIFICATI ( UED)

C

GOVER

ugust

Augus

N.J.S.A. 2A:44-143 et. seq., N.J.S.A. 2A:44-143 et. seq., CAMBRIDGE AVE. & HIGHWOOD AVE. IMPROVEMENTS

Ο DOCUMENTS

Do ($ day

Partnership

City of Englewood

General Requirements

ON REQUIREMENTS

provided however, that for construction projects with a total cost of less than $50,000,. the initial and monthly

Project Manning Reports shall not be submitted except when requested by the Affirmative

Action Office

N.J.S.A. 10:5-31 et seg., N.J.A.C. 17:27-7.

N.J.A.C. 17:27-7.3:

E X C E P T I O N S

C R A F T

(C on tr ac to r o r

S ub vo nt ru ct or f r o m t he f ul l w e e k l y w u g e e e a t n e d b y a n y p e r s o n a n d t ha t n o de du ct io ns h u v e b e e n m a k e e it he r di ru at ly o i n d i o s t l f r o a n e d b y ad y p e r o n a n d t a n o n ec uc ti on s h u v e b e e n m a t e es tn er c i r e a t y o r in di re st ly f r o m t he f al l w a g u s c a m o d b y a n y p er so n, ot he r t h a n p er mi ss ib le d ud uc ti on s a s d ef in ed i n th e N e w

Pr ev ai li ng

W a g e

A ot N.

J.

S.

A.

4:

-5 6.

e t au q, a nd

R eg ul at io n N J A C e t s e q a n d t he

P ay me nt o f

W a g e s

L a w N .J

S.

A.

:1 1-

4.

e t s o q

(2 Th al a n y p ay ro ll s ot he rw is e u n d e r t hi s co nt ra ct r eq ui re d to b e s ub mi tt ed f or th e a b o v e p er io d a r e c or re ct a n d co mp ec te th ut t h e w a g e r at es fo r l a b e c u r s o r m ec ha ni as c o n t a i n e d t h e r e m a r e n o t l s s th un t he ap pl ic ab le w a g e an d c o m p l e t e t hu t t h e w a g e r at es f o r l ab or er s o r m e c h a n i n s c o n t a i n e d t h e r e i n a r e n ot f es s t h a n t he a pp li ca bl e w a w e ru te s c o n t a i n e d in a n y w a g e d et er mi na ti on in cc rp or al ed i n t o t h e co nt ra ct th at th e cl as si fi ca ti on s su t fo rt h th ur ci n f o r e a c h l ab or ur o r m o c h a n i o o on fo rm w i t h t he w o r k h e p er fo rm ed

(3 T h e t a n y a pp re nt io es c mp lo ye d in t he a b o v e p er io d a r e d ul y re gi st er ed w i t h t he

U ni te d

St at as

Le be r, B u r e a u o f

A pp re nt ic es hi p an d Tr ei ni ng a n d e nr ol le d i n a c er ti fi ed a pp re nt io ss hi p p r o g r a m

W H E R E

F R I N G E

B E N E F I T S A R E

P A I D

T O

A P P R O V E D

P L A N S

F U N I D S

O R

P R O G R A M S

In a dd it io n t o t he b as ie h ou rl y w a g e r nt es p ai d t o t o oa ch l ab or er o r m e c h e n i o l is te d i n t he e b o v e m a d s w h e n d u e t o a pp ro pr ia te

S e c t i c n (c be lo w.

r n

E a c h la bo re r o r m e c h a a i c l is te d i n t he s b o v e r ef er en ce d pa yr ol l h a s b o e n p a i d a s in di ca tu d

G i e p ay ro ll a n a m o u n t n o t l eo ss t ha n th e s u m o f th e ap pl ic ab le b as io h ou rl y w a g e r at e p l u s t he a m o u n t o f th e re qu ir ed f ri ng e be no fi ta a s l is te d i n t he c on tr ac t, e x c e p t a s n ot ed i n

S ce ti on

(0 b e l o w

N A M E

A N D

T I T L E

S I G N A T U R E

00 Wo rk s em pl oy er s sh al l su bm it o f t he p a y m e n t o f w a g e

T H E

F A L S I F I C A T I O N

O F

A N Y

O F

T H E

A B O V E

S T A T E M E N T S

M A Y

S U B J E C T

T H E

E T

S E Q

A N D

N I A C

E T S E Q

A N D

N .L

.S .A

. 3 4:

-4 .1

E T

S E Q

File details come from the government source that posted it. Updated .