englewood 112605 (Specs).pdf
PDF 10 MB Posted
- Solicitation number
- 26-15
- Issued by
- Camden County, New Jersey
About this file
This specifications document pertains to the City of Englewood, New Jersey's Cambridge Avenue & Highwood Avenue Improvements Project No. 112605, a public works infrastructure project subject to state and local prevailing wage requirements. The project scope encompasses milling and paving operations on Cambridge Avenue and Highwood Avenue with 3 inches of milling and 3 inches of paving, along with supplementary work including base pavement repair, curb and apron replacement, handicap ramp improvements, and catch basin modifications and repairs. The specifications document provides detailed technical requirements across multiple sections covering clearing and grubbing, concrete work, asphalt paving, aggregate materials, equipment specifications, and site preparation standards. A mandatory bidders conference was conducted, and questions regarding plans and specifications should be directed to fvolcy@cityofenglewood.org. The document references prevailing wage compliance in accordance with New Jersey Statutes and requires submission of payroll statements, apprenticeship registrations, and fringe benefit documentation.
The contract requires compliance with New Jersey prevailing wage laws (N.J.S.A. 34:11-56.25 et seq.) and supplementary specifications for state-aided projects as established by the New Jersey Department of Transportation. Bidders must provide subcontractor identification information and are subject to affirmative action requirements and equal employment opportunity provisions. The document specifies requirements for contractor security, liquidated damages provisions, and alternative dispute resolution procedures. Prevailing wage rates apply to all laborers and mechanics on the project, with contractors required to submit certified payroll documentation indicating compliance with applicable wage determinations. The project is funded through state aid mechanisms, and failure to provide required certifications and compliance documentation will prevent contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HACC_Kennedy Tower__3 Parking Lot Canopy Balcony Improvements_ IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENG
C I T Y
T H
MAR
rovements
PROJE
INSTRUCTION TО 5
ITIONS
SPECIAL PROVISIONS
SPECIFICATIONS
DOCUMENTS
T www.bidnetdirect.com//englewood
B DD
PROVE
ENGLEWOOD, NEW JERSEY
ENGLEWOOD, NEW JERSEY
QUESTIONS REGARDING PLANS AND SPECIFICAT
fvolcy@cityofenglewood.org
SURETY CO DS
EQUAL EMPLOYMENT OPPORTUNITY
PROPOSALS
work ucts
AN
wo wit www.elec.state.nj.u
RACT ND
ilities http://www.nj.gov/labor/Isse/Ispubcon.html.
eme
Alternative Dispute Resolution
IAL ROVISI
CONTRACTOR
SECURITY REQUIRED
BMISSI
LIQUIDATED DAMAGES
N.J.D.O.T SUPPLEMENTARY
SPECIFICATIONS FOR STATE AID PROJECTS
ICATIONS
Safety Red http://access-board.gov/adaag/dws/manufacturers.htm
RA
AT
SECTION NO. ECTION PAGE
1.01 Scope of Work
RAL
1.03 Utility Company Notification
Protection of Traffic (cont.)
1.07 Damages and Repairs to Existing Piping and S
2.04 Payment
ZA
/Or
AN
3.03 Traffic access after working hours
4.02 Clearing and Grubbing
Disposal
9.04 Payment
ENT
Requirements
10.03 Shop Drawings
10.05 Preparation of Subgrade
SA
15.02 Requirements
U
15.07 Dewatering
ructu
15.09 Bridging Trenches
15.10 Pay
17.03 Рayment
G
Aggregate for Light Weight Concrete:
Air Entraining Admixture:
Bar Reinforcement:
nforce
Non-Shrink Grout (for setting leveling plates):
Expansion Joint Fillers:
Integral Hardener:
Waterstops:
21.06 Strength
21.08 Mixing
Required cover spection And Testing
21.11 Concreting In Cold Weather
Ge
22.02 Requirements
22.04 Transportation and Delivery of Mixture
Paym
Thickness (Inches)
Minimum Laydown Temperature (Degrees F)
LES,
23.03 Shop Drawings And/Or Descrip
23.07 Payment
G
24.02 Requirements
24.03 Stockpiles
Coarse Aggregate m
24.07 Blast Furnace Slag
24.09 Dense Graded Aggregate
Fine Aggregate a ckfil
25.05 Payment
27.01 Scope
27.04 Payment
28.01 Scope
28.04
30.02 Requirements
Eq
ILLI
ng
31.01 Scope
31.04 Equipment
31.08 Payment
33.01 Scope
33.02 Requirements
33.04 Equipment
33.06 Portland cement concrete driveway aprons
33.07 Asphalt driveways
33.08 Payment
D
BITU
35.02 Requirements
Ma
35.04 Composition of the
35.05 Equipment
ructi
35.08 Conditioning of Existing Surface
S
35.09 Spreading and Finishing
35.10 Compaction and A
rface
CTABLE
36.01 Scope
36.04 Payment
TOPSOIL
For all general areas:
37.06 Seeding
37.07 Mulching
37.09 Payment
41.02 Payment:
42.02 Payment
RAC T
N.J.S.A. 40A:11-23.2)
Ο
N.J.S.A. 40A:11-23.2
N.J.S.A. 4
N.J.S.A. 40A:11-23c, 1,2, & 3
N.J.S.A. 34:11-56.48
N.J.S.A. 40A:11-2.1
N.J.S.A. 19:44A-20.27
N.J.S.A. 34:11-56.25 et seq.
WOOD
MB
CAMBRIDGE AVE.
& HIGHWOOD AVE. IMPROVEMENTS, PROJECT NUMBER 112605,
(S
"N.J.S.A.54:32B-1 et seq.
N.J.S.A. 34:11-56.48)
Part II
Address:
space ugust https://www.nj.gov/treasury/administration/pdf/RussiaBelarusEntityList.pdf www.state.nj.us/treasury/purchase/pdf/Chapter25List.pdf.
미
ㅁ
August
Failure to provide such will prevent the award of ppropriate assessed as provided by law.
PLEASE PROVIDE FURTHER INFORMATION TO PROHIBITED ACTIVITIES IN RUSSIA OR
August
Π
N.J.S.A. 19:44A-20.27:
Π www.elec.state.nj.us
N.J.S.A. 19:44A-20.27)
N.J.S.A. 40A:11-2.1)
N.J.S.A. 52:34-15)
N.J.S.A. 40A:11-20)
SUBCONTRACTOR IDENTIFICATION
N.J.S.A. 40A:11-16)
0A:11-16, N.J.S.A. 40A:11-16(
N.J.S.A. 34:11-56.25 et seq.)
N.J.A.C. 12:60-1.4, N.J.S.A. 34:11-56.25 tements
Prevailing ignature statements onding
ACTI
GEMENT (CONTINUED)
a.
AMERICAN O ICATION
N.J.S.A. 40A:11-18
N.J.S.A. 40A:11-18
STATEM IENCE AND QUALIFIС S
PHONE NUMBER(S)
& EMAIL ADDRESS(ES)
STATEMENT O NCE AND QUALIFICATI ( UED)
C
GOVER
ugust
Augus
N.J.S.A. 2A:44-143 et. seq., N.J.S.A. 2A:44-143 et. seq., CAMBRIDGE AVE. & HIGHWOOD AVE. IMPROVEMENTS
Ο DOCUMENTS
Do ($ day
Partnership
City of Englewood
General Requirements
ON REQUIREMENTS
provided however, that for construction projects with a total cost of less than $50,000,. the initial and monthly
Project Manning Reports shall not be submitted except when requested by the Affirmative
Action Office
N.J.S.A. 10:5-31 et seg., N.J.A.C. 17:27-7.
N.J.A.C. 17:27-7.3:
E X C E P T I O N S
C R A F T
(C on tr ac to r o r
S ub vo nt ru ct or f r o m t he f ul l w e e k l y w u g e e e a t n e d b y a n y p e r s o n a n d t ha t n o de du ct io ns h u v e b e e n m a k e e it he r di ru at ly o i n d i o s t l f r o a n e d b y ad y p e r o n a n d t a n o n ec uc ti on s h u v e b e e n m a t e es tn er c i r e a t y o r in di re st ly f r o m t he f al l w a g u s c a m o d b y a n y p er so n, ot he r t h a n p er mi ss ib le d ud uc ti on s a s d ef in ed i n th e N e w
Pr ev ai li ng
W a g e
A ot N.
J.
S.
A.
4:
-5 6.
e t au q, a nd
R eg ul at io n N J A C e t s e q a n d t he
P ay me nt o f
W a g e s
L a w N .J
S.
A.
:1 1-
4.
e t s o q
(2 Th al a n y p ay ro ll s ot he rw is e u n d e r t hi s co nt ra ct r eq ui re d to b e s ub mi tt ed f or th e a b o v e p er io d a r e c or re ct a n d co mp ec te th ut t h e w a g e r at es fo r l a b e c u r s o r m ec ha ni as c o n t a i n e d t h e r e m a r e n o t l s s th un t he ap pl ic ab le w a g e an d c o m p l e t e t hu t t h e w a g e r at es f o r l ab or er s o r m e c h a n i n s c o n t a i n e d t h e r e i n a r e n ot f es s t h a n t he a pp li ca bl e w a w e ru te s c o n t a i n e d in a n y w a g e d et er mi na ti on in cc rp or al ed i n t o t h e co nt ra ct th at th e cl as si fi ca ti on s su t fo rt h th ur ci n f o r e a c h l ab or ur o r m o c h a n i o o on fo rm w i t h t he w o r k h e p er fo rm ed
(3 T h e t a n y a pp re nt io es c mp lo ye d in t he a b o v e p er io d a r e d ul y re gi st er ed w i t h t he
U ni te d
St at as
Le be r, B u r e a u o f
A pp re nt ic es hi p an d Tr ei ni ng a n d e nr ol le d i n a c er ti fi ed a pp re nt io ss hi p p r o g r a m
W H E R E
F R I N G E
B E N E F I T S A R E
P A I D
T O
A P P R O V E D
P L A N S
F U N I D S
O R
P R O G R A M S
In a dd it io n t o t he b as ie h ou rl y w a g e r nt es p ai d t o t o oa ch l ab or er o r m e c h e n i o l is te d i n t he e b o v e m a d s w h e n d u e t o a pp ro pr ia te
S e c t i c n (c be lo w.
r n
E a c h la bo re r o r m e c h a a i c l is te d i n t he s b o v e r ef er en ce d pa yr ol l h a s b o e n p a i d a s in di ca tu d
G i e p ay ro ll a n a m o u n t n o t l eo ss t ha n th e s u m o f th e ap pl ic ab le b as io h ou rl y w a g e r at e p l u s t he a m o u n t o f th e re qu ir ed f ri ng e be no fi ta a s l is te d i n t he c on tr ac t, e x c e p t a s n ot ed i n
S ce ti on
(0 b e l o w
N A M E
A N D
T I T L E
S I G N A T U R E
00 Wo rk s em pl oy er s sh al l su bm it o f t he p a y m e n t o f w a g e
T H E
F A L S I F I C A T I O N
O F
A N Y
O F
T H E
A B O V E
S T A T E M E N T S
M A Y
S U B J E C T
T H E
E T
S E Q
A N D
N I A C
E T S E Q
A N D
N .L
.S .A
. 3 4:
-4 .1
E T
S E Q
File details come from the government source that posted it. Updated .