About this file
This is a Request for Professional Services (RPS) document from a Florida county soliciting qualified professional engineering services for the Carlton Water Treatment Plant Backup Power Improvements Project. The project scope encompasses design, permitting, bid phase services, and construction phase services for replacing two existing 2000 kW permanent generators with appropriately sized backup power systems to ensure regulatory compliance and maintain operational continuity during power failures. The work includes designing permanent emergency generators and associated power, fuel, and backup systems; removing existing generators and equipment; installing new generators, switchgears, automatic transfer switches, fuel tanks, utility switchboards, and programmable logic controllers; integrating the systems with the County's SCADA platform; and upgrading piping configurations while coordinating with the local utility provider, FPL. The consultant must account for site constraints including 24/7 plant operations and the requirement that backup power systems remain continuously available during implementation.
The professional services required include comprehensive design services with technical specifications, engineering calculations, models and studies, and preliminary and final construction plans, along with permitting support, bid phase assistance, and construction administration services. The consultant must coordinate extensively with water treatment plant staff and integrate all systems with existing County infrastructure and controls. No specific response dates, due dates, award dates, contract terms, pricing structures, or funding information are detailed within the provided excerpt of this solicitation document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROFESSIONAL SERVICES (“RPS”) – PART I
RPS Part I Rev. 02/10/25 Page 1 of 6
RPS #: 262903FB
RPS TITLE: Engineering Services for Carlton Water Treatment Plant Backup Power
Improvements
PURPOSE
In accordance with Section 287.055, Florida Statutes, Sarasota County, a political subdivision of the State of Florida, will receive proposals on the date indicated in OpenGov Procurement (OpenGov), the County’s electronic procurement portal for the purpose of selecting a qualified Proposer to provide engineering services for the Carlton Water Treatment Plant Backup Power Improvements Project (the “Project”).
Proposers are required to comply with Part II, Scope of Services.
OpenGov is located at https://procurement.opengov.com/portal/scgov
PROPOSER
2.1 For the purposes of this RPS, the term “Proposer” is defined as the legal entity submitting a proposal.
2.2 Proposers intending to submit a bid as a joint venture with another company must provide documentation attesting to the formation of that joint venture with their submittal. For purposes of this solicitation, all vendors who make up the joint venture will be considered together as the Proposer.
QUALIFICATIONS
3.1 The Proposer must be a business organization registered with the Florida Department of Business & Professional Regulation (DBPR) to provide engineering services in the State of Florida at the time of submittal.
3.2 At least one key personnel listed in the Proposal must be a registered Professional Engineer (PE) licensed by the Florida Board of Professional Engineers at the time of submittal.
3.3 Proposals should demonstrate experience providing utilities engineering design, including electrical and instrumentation engineering.
3.4 Preferred Qualifications
3.4.1 Proposed Engineer of Record (EOR) is a licensed PE in the State of Florida with demonstrated experience in design with electrical, instrumentation, and controls including generator systems, Programmable Logic Controllers (PLC) and switchgear.
https://procurement.opengov.com/portal/scgov
RPS Part I Rev. 02/10/25 Page 2 of 6
3.4.2 At least one of the proposed key personnel has experience providing grant assistance on federally funded projects.
MEETINGS & SCHEDULE
An anticipated schedule is provided in the Timeline posted in OpenGov. All meetings will take place at the time, date, and location specified in the solicitation Timeline. Short-listed Proposers should be prepared to attend presentations and/or interviews either in Sarasota, Florida or virtually, at the County’s discretion.
SUBMITTAL INSTRUCTIONS
Refer to the Submittal Instructions section in OpenGov for instructions on how to submit a proposal. Proposers are advised to review the General Terms and Conditions of Solicitations which are available in OpenGov.
VENDOR QUESTIONNAIRE
6.1 All proposers must complete the required forms and information included in the Vendor Questionnaire section of OpenGov. Completed forms and other requested documents must be uploaded with proposer’s submittal in OpenGov. Proposers who fail to complete and upload required forms and documents or fail to provide responses to questions in the Vendor Questionnaire section of OpenGov may be found non-responsive.
WRITTEN PROPOSALS
The information requested in each section below will be used by the evaluation committee to evaluate and score written proposals. All proposal documents must be submitted in the Vendor Questionnaire section in OpenGov in the format requested.
7.1 Ability of Professional Personnel
7.1.1 Single-page letter of interest summarizing Proposer’s
qualifications.
7.1.2 Required and preferred licenses and certifications.
7.1.3 Resumes of key personnel, including subconsultants, demonstrating individual qualifications and experience.
7.2 Proposer’s Past Performance & Experience
7.2.1 Complete the Summary of Professional Experience &
Capabilities Form in the Vendor Questionnaire section of OpenGov). Projects submitted should demonstrate the
RPS Part I Rev. 02/10/25 Page 3 of 6 experience of the Proposer, subcontractor(s), and current team members who may have worked for other firms on similar projects and provide detailed information regarding the Proposer’s capabilities, project management techniques, and project controls.
7.3 Approach
7.3.1 Project Approach – Provide a detailed project approach that includes, but is not limited to the following:
a. Project management techniques, controls, program and technologies to be employed to meet project schedule and budget requirements.
b. Assignment of personnel to provide the most efficient service.
c. Where elements of the work will be performed, and who in the organizational chart will oversee performance of the work to provide the most efficient services.
d. Anticipated impacts of the Proposer’s current and projected workload on the project.
e. Detailed information explaining how location of the firm, key personnel and sub-contractors will affect project, including how impact of any physical distance will be mitigated through the use of technology, processes or other means.
7.3.2 Workload
Complete the Current & Projected Workload Form (in the Vendor Questionnaire section of OpenGov) to identify active and awarded projects.
7.3.3 Organization
a. Provide an organizational chart delineating personnel assigned to the project (including subconsultants).
b. Provide an organizational chart showing the corporate management structure of the Proposer.
7.3.4 Schedule/Timeline
Provide a graphical representation of the proposed project schedule/timeline indicating major milestones and deliverables.
RPS Part I Rev. 02/10/25 Page 4 of 6
SELECTION PROCESS
8.1 Written Proposals
8.1.1 All timely responses meeting the criteria set forth in this RPS will be considered by the County.
8.1.2 Written proposals will be evaluated and scored by the
Professional Services Review Committee (PSRC) using the evaluation criteria in the Evaluation Criteria section of OpenGov.
8.1.3 When evaluating written proposals, the PSRC will use the scale below to score each criterion. Only whole numbers are to be used when scoring. Scores will be given weight as indicated in the evaluation criteria in OpenGov.
Score Description
5 Excellent
4 Very Good
3 Good
2 Satisfactory
1 Unsatisfactory
0 N/A
8.2 Presentations
The PSRC will conduct discussions with, and may require public presentations by, no fewer than the three (3) highest scoring Proposer
8.3 Ranking
Following discussions or presentations, the PSRC will rank the short-listed Proposers. When ranking short-listed Proposers, the PSRC will consider information contained in the written proposals, clarifications (if any), and information provided during discussions or presentations.
Ranking shall be determined without regard to the score established as a result of the evaluation of written proposals.
8.4 Recommendation of Award
The Proposer ranked first by the PSRC will be recommended for award.
RPS Part I Rev. 02/10/25 Page 5 of 6
AWARD
9.1 It is the intent of the County to award a contract to the Proposer who, in the sole opinion of the County, is most qualified to perform the scope of services required.
9.2 In the event of a tie the tie-breaking procedures identified in the Sarasota County Procurement Manual will apply.
9.3 Local preference as defined in the Procurement Code section 2-215 is not applicable to this solicitation.
9.4 Contract
A draft of the contract that the successful Proposer(s) will be expected to sign (a CCNA Specific Project Agreement) is posted on the Procurement website, shown below. The County may, in its sole discretion, select a different contract type or make revisions to the one referenced above following the recommended award of this solicitation.
https://www.scgov.net/government/procurement/contract-templates
CONFLICT OF INTEREST
10.1 Any Proposer who has drafted any portion of a scope of work or specifications for a project, or any entity which provides material assistance to such Proposer in such work, shall be ineligible to compete for the contract for design or construction of that project.
10.2 Selected Proposers, either directly or through an affiliate, may not have a business relationship with any entity to perform work related to a work assignment issued under any resulting contract
CHANGES IN PROJECT TEAM
11.1 A change in the project team of a Proposer after the submission of a proposal could result in reconsideration of the scoring of applicable evaluation criteria, at the sole discretion of the County.
11.2 Any changes in the Proposer’s Key Personnel must be brought to the attention of Procurement as soon as possible after the change is made.
The changes, the reasons for the changes, and resumes for the individuals being substituted for an original project team member, must be submitted to the Procurement Analyst identified in the Solicitation Summary prior to the scheduled evaluation committee meeting.
RPS Part I Rev. 02/10/25 Page 6 of 6
11.3 Decreases in scoring may result from the reconsideration of changes in the project team of a Proposer. No increases in scoring will result from the reconsideration of changes in the project team of a Proposer.
11.4 After recommendation of award, the successful Proposer shall not be allowed to substitute project team members named in this proposal without the prior written permission of the County. Substitution may, in the sole opinion of the County, be grounds for cancellation of a recommended award, or termination of agreement.
REUSE OF EXISTING PLANS
The plans on this project are subject to reuse in accordance with Section 287.055 (10), Florida Statutes.
(End of Part I)
PART II
SCOPE OF SERVICES
Prepared by Capital Projects Department Part II - Page 1 of 2
1. PROJECT OVERVIEW
This Request for Professional Services (RPS) is to solicit qualified professional engineering services for design, permitting, bid phase services and services during construction for the Carlton Water Treatment Plant Backup Power Improvements Project (the “Project”). The Project will allow the County to comply with regulatory requirements that require the plant to have backup generators to keep the plant operational in case of power failure(s). Project includes the replacement of two (2) existing 2000 kW permanent generators with an adequate number and size of generators that will meet the power needs of the water treatment plant. The size and integration of the generators will need to be evaluated to ensure full integration with County SCADA and any other necessary equipment. The existing site constraints include plant operations that are 24 hours a day, 7 days a week and a backup power system will need to be available at all times. Services will need to be coordinated with staff at the water treatment plant site.
2. DESCRIPTION OF WORK
The improvements are anticipated to include:
A. Design of permanent emergency generators, power, fuel, and backup systems to increase reliability and redundancy. Final number to be determined after analysis.
B. Removal of the existing generators and associated equipment
C. Installation of new generators, applicable switchgears, automatic transfer switches (ATCs), fuel tanks, utility switchboard, and programmable logic controllers (PLCs)
D. Integration with the County’s SCADA (Supervisory Control and Data Acquisition) platform
E. Upgrades to piping configurations
F. Coordination with FPL
3. PROFESSIONAL SERVICES
The anticipated services for the Project to be provided by the Consultant may include but are not limited to the following:
A. Design services including, but not limited to, design technical specifications, engineering calculations, models and studies, preliminary and final plan designs for construction, cost estimates, and a detailed project management plan.
B. Necessary supporting components based on the final design accepted by the County.
C. Regulatory coordination and permitting services (local, state, and federal)
PART II
SCOPE OF SERVICES
Prepared by Capital Projects Department Part II - Page 2 of 2
D. Utility and communication infrastructure engineering
E. Activities related to bid advertisement and award, including participation in meetings, responses to requests for additional information, bid evaluation assistance, and recommendation of award.
F. All activities needed to provide Engineer of Record (EOR) construction phase services (future) to ensure a successful delivery of the Project.
G. Grant administration assistance for applicable funding sources for the construction project, which may include the U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant- Disaster Recovery (CDBG-DR) program related activities.
a. The project completion and final expenditure deadline for CDBG-DR programs is June 30, 2031.
H. All services, activities, products, and deliverables shall be of a quality acceptable for use in permitting and regulatory review by local, state, and federal agencies having jurisdiction over the Project. The Consultant shall provide technical information, documentation, coordination, and support, as requested by the County, to assist with permitting and regulatory approvals and compliance with applicable federal, state, and local laws and regulations.
(End of Part II)
PART III – INSURANCE REQUIREMENTS
Insurance Template Adopted 04/19/19 Page 1 of 2
CONTRACTOR’S INSURANCE
Contractor shall, on a primary basis and at its sole expense, maintain in full force and effect, at all times during the life of this Contract, insurance coverage (including endorsements) and limits as described herein. These requirements, as well as the County’s review or acceptance of insurance maintained by Contractor, are not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this Contract.
Insurance requirements itemized in this Contract and required of the Contractor shall extend to all subcontractors to cover their operations performed under this Contract.
The Contractor shall be responsible for any modifications, deviations, or omissions in these insurance requirements as they apply to subcontractors.
Insurance carriers providing coverage required herein must be licensed to conduct business in the State of Florida and must possess a current A.M. Best’s Financial Strength Rating of A- Class VII or better.
Each insurance policy required by this Contract shall apply separately to each insured against whom claim is made and suit is brought, except with respect to limits of the insurer’s liability.
The Contractor shall be solely responsible for payment of all premiums for insurance contributing to the satisfaction of this Contract and shall be solely responsible for the payment of all deductibles and retentions to which such policies are subject.
Contractor shall furnish Certificates of Insurance to the County Administrative Agent evidencing the types and amounts of coverage, including endorsements, required by this Contract prior to commencement of work and prior to expiration of the insurance contract, when applicable. Such Certificate(s) of Insurance shall, to the extent allowable by the insurer, include a minimum thirty (30) day notice of cancellation (10 days for non-payment of premium) or non-renewal of coverage. Notwithstanding these notification requirements, the Contractor will be required to provide County with 5-day prior written notice of any policy cancellation or non-renewal.
The County reserves the right to review, modify, reject, or accept any required policies of insurance, including limits, coverage, or endorsements, herein from time to time throughout the term of this Contract. County reserves the right, but not the obligation, to review and reject any insurer providing coverage due to its poor financial condition or failure to operate legally.
A. WORKERS’ COMPENSATION: Contractor agrees to maintain Workers’ Compensation insurance in accordance with Florida Statutes, Chapter 440.
Employers Liability to be included with a minimum limit of $500,000 per accident/per disease/per employee. If work is to be performed over or adjacent to navigable water and involves maritime exposure, applicable LHWCA, Jones Act, or other maritime law coverage shall be included.
PART III – INSURANCE REQUIREMENTS
Insurance Template Adopted 04/19/19 Page 2 of 2
In the event the Contractor has “leased” employees, the Contractor or the employee leasing company must provide evidence of a Workers’ Compensation policy for all personnel on the worksite.
Contractors who are exempt from Florida’s Workers’ Compensation law must provide proof of such exemption issued by the Florida Department of Financial Services, Bureau of Workers’ Compensation.
B. COMMERCIAL GENERAL LIABILITY: Contractor shall maintain Commercial General Liability per ISO form CG0001 or its equivalent, including but not limited to coverage for premises and operations, personal injury, products & completed operations, liability assumed under an insured contract, and independent contractors with limits of not less than $1,000,000.00 each occurrence, $2,000,000.00 aggregate covering all work performed under this Contract.
Contractor agrees to endorse Sarasota County Government as an additional insured on the Commercial General Liability coverage.
C. PROFESSIONAL LIABILITY: Contractor shall maintain Professional Liability, or equivalent Errors & Omissions Liability, with limits not less than $1,000,000.00 per claim/occurrence for professional services rendered under this Contract. If coverage is written on a claims-made basis: a. Any retroactive date shall precede the effective date of this Contract; b. Contractor shall provide certificates of insurance evidencing the required coverage for a period of two years after final payment under this Contract is made or provide evidence showing Contractor has obtained a two-year extended reporting period endorsement.
D. BUSINESS AUTOMOBILE LIABILITY: Contractor agrees to maintain Business Automobile Liability insurance with limits not less than $1,000,000 combined single limit for each accident covering all Owned, Non-Owned & Hired automobiles used in the performance of this contract. In the event Contractor does not own automobiles, Contractor agrees to maintain coverage for Hired & Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy.
(End of Part III)