Enclosure 3 - Contract Pricing Proposal Form.docx.docx

DOCX document 30 KB Posted

Attached to
Cloud Broker & ATO-Ready Secure Cloud Enclave for AWS and GCP
Solicitation number
4-B148-P-00218-00
Issued by

About this file

This document is a Request for Proposal (RFP) for a project to design, build, and implement a secure cloud enclave for the Computing, Environment and Life Sciences Directorate (CELS) at Argonne National Laboratory. The primary objectives are to develop a secure cloud environment adhering to NIST 800-53, FedRAMP Moderate, and FISMA compliance standards, produce comprehensive ATO documentation, enable effective operations through training, assess feasibility of integrating existing cybersecurity solutions, and position CELS as a secure cloud broker with chargeback billing and FinOps capabilities.

The contractor will be responsible for deliverables including a Discovery and Documentation Report, Design Specifications, Infrastructure as Code Repository, ATO Documentation, Training Materials and Sessions, Implementation and Validation Report, and a FinOps and Chargeback Capabilities Report. The project timeline ranges from 5 days for initial meetings to 120 days for final deliverables. The work is expected to be performed remotely, with possible onsite engagements at Argonne's Lemont, IL campus. The contracting agency is the Department of Energy Office of Science.

View the file

Other files

File Type Posted
2A - Appendix A-Fixed Price-10-DEC-2021.PDF PDF
2 - Draft FP Contract.doc DOC document
Enclosure 6 - OCI Disclosure.doc DOC document
Enclosure 1 (Read First) - RFP and Instructions.docx.docx DOCX document
2B - Appendix B - SOW 6-1-24.docx.docx DOCX document
Enclosure 4 - Evaluation Criteria.docx.docx DOCX document
Enclosure 5 - ANL-70B (Long).doc DOC document
2C - Appendix D8-12-DEC-2023.PDF PDF
2D - Special Cl-Progress Pmts-02-SEP-2015.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 4-B148-P-00218-00

ENCLOSURE NO. 3

Pricing Proposal Form A. Total Price: $_______________

B. Pricing Per Deliverable

Deliverable
Anticipated Delivery Date
Fixed Price

5.1.1 Discover and Documentation Report

5.1.2 Design Specifications

5.1.3 Infrastructure as Code Repository

5.1.4 ATO Documentation

5.1.5 Training Materials and Sessions

5.1.6 Implementation and Validation Report

5.1.7 FinOps and Chargeback Capabilities Report

Total:

C. Travel

Travel is not anticipated. If on-site meetings are deemed necessary, a supplemental agreement to incorporate the Argonne Travel Policy and funding for travel reimbursement will be issued.

File details come from the government source that posted it. Updated .