Edited Electrical - One-Line Diagrams - 6-14-16.pdf

PDF 9 MB Posted

Attached to
J059--Tri-Annual Electrical Testing Federal contract opportunity
Solicitation number
36C25522Q0184
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document contains one-line diagrams and equipment details for the electrical distribution system at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The related federal contract opportunity is for tri-annual electrical testing services at this same location.

The one-line diagrams show the electrical equipment, panel schedules, and distribution layout throughout multiple buildings on the medical center campus. Key equipment includes switchboards, transformers, generators, motor control centers, and over 100 electrical panels serving various rooms and departments. The contract opportunity is for the Department of Veterans Affairs to obtain testing, inspection and maintenance of this electrical distribution and equipment over a three year period. The location, required services and period of performance correspond to the infrastructure depicted in the one-line diagrams.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ONE-LINE DRAWINGS

V.A. CONTRACT #VA255-15-C-0199

V.E. PROJECT #1512

TRIENNIAL ELECTRICAL

DISTRIBUTION, MAINTENANCE,

INSPECTION AND TESTING

JOHN J. PERSHING VA MEDICAL CENTER

1500 N. WESTWOOD BLVD.

POPLAR BLUFF, MO 63901

wbahriii@gmail.com Line wbahriii@gmail.com Typewritten text Panel

NA1

Sec 1 wbahriii@gmail.com Typewritten text 225A wbahriii@gmail.com Typewritten text Electrical Rm wbahriii@gmail.com Typewritten text

MB

wbahriii@gmail.com Typewritten text Panel NA1 Sec 2 225A wbahriii@gmail.com Typewritten text Panel NA1 Sec 2 225A wbahriii@gmail.com Rectangle wbahriii@gmail.com Typewritten text Circuit 9 wbahriii@gmail.com Typewritten text Circuit 7 wbahriii@gmail.com Typewritten text 4-Panel

Equipment Name Mfr. Amps Main Breaker Voltage* Bldg. # Location Fed From Dwg. #

16G GE 100 MLO 16 SWBD 20-EDP EP002

1A1 GE 125 MLO 1 Rm. 1A1 Bus 8 EP002

1A2 GE 125 MLO 1 Rm. 1068A Bus 2 EP002

1A3 GE 125 MLO 1 Rm. 1A3 Bus 6 EP002

1-ATS-5 ASCO 400 480/277 1 Rm. 3076 SUB-C / S3 EP002

1B GE 125 MLO 1 Rm. 1023 Bus 6 EP002

1C GE 125 MLO 1 Rm. 1037 Bus 5 EP002

1D GE 125 MLO 1 Rm. 1D2 Bus 2 EP002

1E GE 125 MLO 1 Rm. 1110B Bus 7 EP002

1F GE 125 MLO 1 Rm. 1166A Bus 7 EP002

20ES1 ? 100 MLO 20 SWBD 20-EDP EP002

23EP C-H 100 MLO 23 Rm. 1001 SWBD 7-GDP-1 EP005

23LP C-H 225 225A MB 23 Rm. 1001 Xfmr T5 EP005

2A1 GE 125 MLO 1 Rm. 2A1 Bus 8 EP002

2A2 GE 125 MLO 1 Rm. 2000B Bus 2 EP002

2A3 GE 225 MLO 1 Rm. 2035 Bus 5 EP002

2A3S Siemens 125 MLO 1 Rm. 2035 2A3 EP002

2B GE 125 MLO 1 Rm. 2014 Bus 5 EP002

2BS GE 125 MLO 1 Rm. 2014 2B EP002

2C GE 125 MLO 1 Rm. 2C Bus 6 EP002

2C2 Siemens 250 MLO 1 Next to Rm. 2051 Bus 6 EP002

2D1 GE 225 MLO 1 Rm. 2D Bus 1 EP002

2D2 ? 400 MLO 1 Rm. 2072 Bus 1 EP002

2D2A ? 100 MLO 1 Rm. 2072 2D2 EP002

2E GE 125 MLO 1 Rm. 2E Bus 7 EP002

2F GE 125 MLO 1 Rm. 2F Bus 8 EP002

2L1 ? 200 200A MB 2 Basement Bldg. 2 FDS EP005

2L2 ? 125 MLO 2 Rm. 1004 2L1 EP005

2X1 GE 225 MLO 1 Rm. 2014 SWBD 20-E EP002

2X2 GE 400 MLO 1 Rm. 2014 SWBD 20-E EP002

3A1 GE 125 MLO 1 Rm. 3A1 Bus 8 EP002

3A2 GE 125 MLO 1 Rm. 3A2 Bus 2 EP002

3A3 GE 125 MLO 1 Rm. 3034A Bus 6 EP002

3B GE 125 MLO 1 Next to Rm. 3011 Bus 6 EP002

3C GE 125 MLO 1 Rm. 3044 Bus 5 EP002

3D GE 125 MLO 1 Rm. 3063 Bus 1 EP002

3E GE 125 MLO 1 Rm. 3110A Bus 8 EP002

3F GE 125 MLO 1 Rm. 3142A Bus 7 EP002

3L1A ? 200 200A MB 3 Rm. 01 Bldg. 3A FDS EP005

3L1B ? 200 200A MB 3 Rm. 01A Bldg. 3B FDS EP005

3L2A ? 125 MLO 3 Top of stairway 3L1A EP005

3L2B ? 125 MLO 3 Top of stairway 3L1B EP005

4A1 GE 125 MLO 1 Rm. 4A1 Bus 7 EP002

4A2 GE 125 MLO 1 Rm. 4054B Bus 1 EP002

4A3 GE 125 MLO 1 Rm. 4031A Bus 5 EP002

4B GE 125 MLO 1 Rm. 4B Bus 5 EP002

4C GE 125 MLO 1 Rm. 4041 Bus 6 EP002

4E GE 125 MLO 1 Rm. 4072 Bus 7 EP002

4F GE 125 MLO 1 Rm. 4100 Bus 8 EP002

4L1A ? 200 200A MB 4 Rm. 01 Bldg. 4A FDS EP005

4L1B ? 200 200A MB 4 Rm. 01A Bldg. 4B FDS EP005

4L2A ? 125 MLO 4 Top of stairway 4L1A EP005

4L2B ? 125 MLO 4 Top of stairway 4L1B EP005

5A1 GE 125 MLO 1 Rm. 5A1 Bus 8 (4th Floor) EP002

5A2 GE 125 MLO 1 Rm. 5045 Bus 2 EP002

5A3 GE 125 MLO 1 Rm. 5010 Bus 6 (4th Floor) EP002

5L1 ? 200 200A MB 5 Rm. 05 Bldg. 5 FDS EP005

5L2 ? 225 MLO 5 Top of stairway 5L2 FDS EP005

5L2 FDS ? 100 100A Fuses 5 Rm. 05 Bldg. 5 FDS EP005

5L3 ? 225 MLO 5 Corr. 1013 5L3 FDS EP005

5L3 FDS ? 100 100A Fuses 5 Rm. 05 Bldg. 5 FDS EP005

6A2 GE 125 MLO 1 6th Floor Bus 2 (5th Floor) EP002

6-DP GE 400 400A MF 6 Rm. 03 Xfmr T3 EP005

6L1 ? 125 MLO 6 Rm. 1000A 6-DP EP005

6P1 GE 225 MLO 1 6th Floor Bus 1 (5th Floor) EP002

6P1 ? 225 MLO 6 Rm. 1000A 6-DP EP005

6P1A Sq. D 100 MLO 1 6th Floor 6P1 EP002

7A2 GE 125 MLO 1 7th Floor Bus 1 (5th Floor) EP002

7-ATS-1 ASCO 600 7 Rm. 105 Bldg. 7 FDS / Generator #2 EP005

7G Gould ITE 100 MLO 7 Rm. 105 SWBD 7-GDP-1 EP005

7L1 ? ? ? 7 Rm. G1 SWBD 7-GDP-1 EP005

7-MCC GE 100 MLO 7 Rm. G2 7P1 EP005

7P1 Gould ITE 400 400A MB 7 Rm. G1 Panel 7P1 FDS EP005

7P1 FDS ? 400 350A Fuses 7 Rm. 105 SWBD 7-GDP-1 EP005

7P2 GE 225 225A MB 7 Rm. G1 SWBD 7-GDP-1 EP005

8L2 ? 225 MLO 8 Rm. 1008 SWBD 8-MDP EP005

8L2A ? 225 MLO 8 Rm. 1007C SWBD 8-MDP EP005

8L2B ? 100 MLO 8 Rm. 1007A 8L2A EP005

8L2C ? 70 70A Brkr 8 Rm. 1007A 8L2A EP005

8LS ? 225 MLO 8 Next to Rm. 1007 SWBD 8-MDP EP005

ATS-1 Zenith 800 20 SWBD 20-D / SWBD 20-GDP EP003

ATS-2 GE Zenith 800 20 SWBD 20-D1 / SWBD 20-GDP EP003

ATS-3 Zenith 600 20 SWBD 20-E / SWBD 20-GDP EP003

ATS-4 Zenith 600 20 SWBD 20-E / SWBD 20-GDP EP003

BA2 GE 125 MLO 1 Basement SWBD 20-D1 EP002

BD1 GE 125 MLO 1 Basement SWBD 20-D1 EP002

BD2 GE 225 MLO 1 Basement SWBD 20-D1 EP002

BD3 GE 225 MLO 1 Basement SWBD 20-E EP002

Bldg. 18 Panel GE 225 MLO 240/120 18 Inside switchgear MV SWGR EP001

Bldg. 2 FDS ? 200 200A Fuses 2 Outside Xfmr T4 EP005

Bldg. 3A FDS ? 100 100A Fuses 3 Outside Xfmr T4 EP005

Bldg. 3B FDS ? 100 100A Fuses 3 Outside Xfmr T4 EP005

Bldg. 4A FDS ? 100 100A Fuses 4 Outside Xfmr T4 EP005

* All voltages 208/120 unless noted otherwise.

Equipment Name Mfr. Amps Main Breaker Voltage* Bldg. # Location Fed From Dwg. #

Bldg. 4B FDS ? 200 200A Fuses 4 Outside Xfmr T4 EP005

Bldg. 5 FDS ? 400 400A Fuses 5 Outside Xfmr T4 EP005

Bldg. 7 FDS ? 600 600A Fuses 7 Rm. 105 Xfmr T3 EP005

BSL Sq. D 225 225A MB 1 Basement SWBD 20-D EP002

C1E GE 125 MLO 1 Rm. 1A3 Bus 3 EP002

C1W GE 125 MLO 1 Rm. 1A1 Bus 3 EP002

C2E GE 125 MLO 1 Rm. 2035 Bus 3 EP002

C2W GE 125 MLO 1 Rm. 2A1 Bus 3 EP002

C3DP GE 400 MLO 1 Rm. 3A2 Bus 3 EP002

C3DP2 GE 125 MLO 1 3rd Floor C3DP EP002

C3E GE 125 MLO 1 Rm. 3034A C3DP EP002

C3E1 Siemens 250 MLO 1 Rm. 3110A C3DP EP002

C3-ICU Sq. D 225 MLO 1 Rm. 3022 C3DP EP002

C3N GE 225 MLO 1 Rm. 3063 C3DP EP002

C3W GE 125 MLO 1 Rm. 3A1 C3DP EP002

C4E GE 125 MLO 1 Rm. 4031A Bus 3 EP002

C4W GE 125 MLO 1 Rm. 4A1 Bus 3 EP002

C5E GE 125 MLO 1 Rm. 5010 Bus 3 EP002

C5W GE 125 MLO 1 Rm. 5A1 Bus 3 EP002

CGA GE 125 MLO 1 Ground Floor CGW EP002

CGE ITE 225 225A MB 1 Rm. 07T Bus 3 EP002

CGW GE 125 MLO 1 Rm. GA1 Bus 3 EP002

Chiller #1 Starter ? ? ? 1 Rm. 61 Xfmr T6 EP004

Chiller #2 Starter ? ? ? 1 Rm. 61 Xfmr T7 EP004

Cysto. X-Ray Breaker ? 150 150A/2P Brkr 1 Rm. 3085 Bus 4 EP002

E1D GE 225 MLO 1 Rm. 1D2 Bus 4 EP002

E2A Siemens 250 MLO 1 Rm. 2035 Bus 4 (1st Floor) EP002

E2B GE 225 MLO 1 Rm. 2014 Bus 3 EP002

E4A3 GE 125 MLO 1 Rm. 4054B Bus 4 EP002

E6A2 GE 225 MLO 1 6th Floor Bus 4 EP002

E7A1 GE 125 MLO 1 7th Floor E6A2 EP002

EBD1 GE 225 MLO 1 Basement SWBD 20-EDP EP002

EBD2 (P3) C-H 200 MLO 1 Basement SWBD 20-EDP EP002

EBD3 GE 400 400A MB 1 Basement SWBD 20-EDP EP002

Elevator #4 FDS ? 100 100A Fuses 1 Rm. 3078 Bus 4 EP002

Elevator #5 FDS ? 100 100A Fuses 1 Elev. #5 Mach. Rm. Bus 4 EP002

EMCC-1 GE 200 MLO 1 Basement SWBD 20-EDP EP002

EMCC-2 Sq. D 600 MLO 1 Rm. 61 SWBD 20-EDP EP002

EP Siemens 600 MLO 1 7th Floor Bus 4 (6th Floor) EP002

Fire Pump #1 DS ? 800 Switch 20 SWBD 20-GDP EP003

Fire Pump #2 Controller ? ? ? 1 Basement SWBD 20-D / SWBD 20-GDP EP002

Fire Pump #2 DS ? 800 Switch 20 SWBD 20-GDP EP003

G1 Sq. D 225 100A MB 1 Rm. 61 MCC-1 EP002

GA1 GE 125 MLO 1 Rm. GA1 Bus 7 (1st Floor) EP002

GA2 GE 125 MLO 1 Rm. 01D Bus 2 EP002

GA3 GE 125 MLO 1 Rm. 07T Bus 5 EP002

GC GE 125 MLO 1 Rm. 09B Bus 6 EP002

GD GE 225 MLO 1 Rm. GD Bus 1 EP002

GG GE 100 MLO 1 Ground Floor Bus 8 (1st Floor) EP002

GP1 GE 225 MLO 1 Ground Floor SWBD 20-D1 EP002

GP2 GE 225 MLO 1 Ground Floor GP1 EP002

H1B GE 400 400A MF 480/277 1 6th Floor MCC-2 EP002

H2B GE 225 MLO 480/277 1 Rm. 2014 H1B EP002

K1 GE 225 MLO 1 Rm. 1070 Bus 1 EP002

K2 GE 225 MLO 1 Rm. 1070 Bus 1 EP002

KA GE 225 200A MB 1 Closet in Rm. 1098 Bus 2 EP002

Kit. T/L Panel Sq. D 70 70A MB 1 Rm. 1097 Kit. T/L Panel DS EP002

Kit. T/L Panel DS ? ? ? 1 Kitchen Bus 4 EP002

LS1 Gould ITE 200 MLO 1 Rm. 1065A SWBD 20-LSDP EP002

LS2 Gould ITE 200 MLO 1 Rm. 2065 SWBD 20-LSDP EP002

LS2B Eaton 100 60A MB 1 Elev. #5 Mach. Rm. LS2 EP002

LS3 Gould ITE 200 MLO 1 Rm. 3055 SWBD 20-LSDP EP002

LS3A GE 225 MLO 1 Rm. 3063 LS3 EP002

LS4 Gould ITE 100 MLO 1 Rm. 4052 SWBD 20-LSDP EP002

LS5 Gould ITE 100 MLO 1 Rm. 5A2 SWBD 20-LSDP EP002

LS7 Eaton 100 60A MB 1 7th Floor (Elev. Mach. Rm.) LS5 EP002

LSG Gould ITE 200 MLO 1 Rm. 18 SWBD 20-LSDP EP002

MCC-1 Sq. D 600 MLO 480/277 1 Rm. 61 SUB-C EP002

MCC-2 GE 1200 1200A MF 480/277 1 6th Floor SUB-C EP002

MCC-3 GE 400 MLO 1 Basement SWBD 20-E EP002

MV SWGR GE 1200 1200A MB (2) 13.8KV 18 Utility EP001

MV SWITCH Sq. D 1200 13.8KV Near Utility Poles Utility EP001

PANEL A GE 100 MLO 1 Rm. 3076 PANEL A FDS EP002

PANEL A FDS ? 45 45A Fuses 1 Rm. 3076 S1 EP002

Pavilion Panel ? 100 MLO 25 Pavilion GA1 EP002

PL GE 225 MLO 1 Pharmacy (Corr. GB) SWBD 20-D EP002

PL1 GE 225 MLO 1 Pharmacy (Corr. GB) Bus 5 EP002

S1 GE 400 MLO 480/277 1 Rm. 3076 1-ATS-5 EP002

S3 GE 600 MLO 1 Rm. 3076 SWBD 20-GDP EP002

Smoke Shelter Panel Sq. D 100 MLO 24 Smoke Shelter BD3 EP002

SUB-C Sq. D 3000 3000A MB 480/277 1 Rm. 61 Xfmr T9 EP002

SWBD 20-D Gould ITE 1600 MLO 20 SWGR 20-SB EP003

SWBD 20-D1 Gould ITE 1600 MLO 20 SWGR 20-SB EP003

SWBD 20-E Gould ITE 1600 MLO 20 SWGR 20-SB1 EP003

SWBD 20-EDP Gould ITE 1200 MLO 20 ATS-4 EP003

SWBD 20-GDP Gould ITE 1600 MLO 20 Generator #1 EP003

SWBD 20-LSDP Gould ITE 1200 MLO 20 ATS-3 EP003

SWBD 7-GDP-1 GE 600 MLO 7 7-ATS-1 EP005

SWBD 8-MDP ? 400 MLO 8 Rm. 1007C Xfmr T3 EP005

SWGR 20-SB Gould ITE 1600 1600A MB (2) 20 Xfmr T1 / Xfmr T2 EP003

SWGR 20-SB1 GE 1600 1600A MB 20 Xfmr T8 EP003

Telephone Panel GE 125 MLO 1 Ground Floor Bus 3 (1st Floor) EP002

* All voltages 208/120 unless noted otherwise.

GI001
ES101
EP001
EP002
EP003
EP004
EP005
RE001