Edited Electrical - One-Line Diagrams - 6-14-16.pdf
PDF 9 MB Posted
- Attached to
- J059--Tri-Annual Electrical Testing Federal contract opportunity
- Solicitation number
- 36C25522Q0184
About this file
This document contains one-line diagrams and equipment details for the electrical distribution system at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The related federal contract opportunity is for tri-annual electrical testing services at this same location.
The one-line diagrams show the electrical equipment, panel schedules, and distribution layout throughout multiple buildings on the medical center campus. Key equipment includes switchboards, transformers, generators, motor control centers, and over 100 electrical panels serving various rooms and departments. The contract opportunity is for the Department of Veterans Affairs to obtain testing, inspection and maintenance of this electrical distribution and equipment over a three year period. The location, required services and period of performance correspond to the infrastructure depicted in the one-line diagrams.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25522Q0184 0001.docx | DOCX document | |
| STL20547-000 VA Hospital Poplar Bluff MO Report_Rev0.pdf | ||
| Attachment (1) - Wage Determinations Incorporated by Reference.pdf | ||
| 36C25522Q0184_2.docx | DOCX document | |
| Edited VA_657A-16-101-100__ASI_001_Dwgs.pdf | ||
| FAR_7878582_JOHN J PERSHING VA MED CTR_EC154CBA02__MO - EESDUS_07022020.pdf | ||
| JOHN J PERSHING VA MEDCIAL CENTER KOHLER PM REPORT 2020.pdf | ||
| JOHN J PERSHING VA MEDCIAL CENTER GENERAC PM REPORT 2020.pdf | ||
| SOW Trienniel Electrical SS R1 - Final.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ONE-LINE DRAWINGS
V.A. CONTRACT #VA255-15-C-0199
V.E. PROJECT #1512
TRIENNIAL ELECTRICAL
DISTRIBUTION, MAINTENANCE,
INSPECTION AND TESTING
JOHN J. PERSHING VA MEDICAL CENTER
1500 N. WESTWOOD BLVD.
POPLAR BLUFF, MO 63901
wbahriii@gmail.com Line wbahriii@gmail.com Typewritten text Panel
NA1
Sec 1 wbahriii@gmail.com Typewritten text 225A wbahriii@gmail.com Typewritten text Electrical Rm wbahriii@gmail.com Typewritten text
MB
wbahriii@gmail.com Typewritten text Panel NA1 Sec 2 225A wbahriii@gmail.com Typewritten text Panel NA1 Sec 2 225A wbahriii@gmail.com Rectangle wbahriii@gmail.com Typewritten text Circuit 9 wbahriii@gmail.com Typewritten text Circuit 7 wbahriii@gmail.com Typewritten text 4-Panel
Equipment Name Mfr. Amps Main Breaker Voltage* Bldg. # Location Fed From Dwg. #
16G GE 100 MLO 16 SWBD 20-EDP EP002
1A1 GE 125 MLO 1 Rm. 1A1 Bus 8 EP002
1A2 GE 125 MLO 1 Rm. 1068A Bus 2 EP002
1A3 GE 125 MLO 1 Rm. 1A3 Bus 6 EP002
1-ATS-5 ASCO 400 480/277 1 Rm. 3076 SUB-C / S3 EP002
1B GE 125 MLO 1 Rm. 1023 Bus 6 EP002
1C GE 125 MLO 1 Rm. 1037 Bus 5 EP002
1D GE 125 MLO 1 Rm. 1D2 Bus 2 EP002
1E GE 125 MLO 1 Rm. 1110B Bus 7 EP002
1F GE 125 MLO 1 Rm. 1166A Bus 7 EP002
20ES1 ? 100 MLO 20 SWBD 20-EDP EP002
23EP C-H 100 MLO 23 Rm. 1001 SWBD 7-GDP-1 EP005
23LP C-H 225 225A MB 23 Rm. 1001 Xfmr T5 EP005
2A1 GE 125 MLO 1 Rm. 2A1 Bus 8 EP002
2A2 GE 125 MLO 1 Rm. 2000B Bus 2 EP002
2A3 GE 225 MLO 1 Rm. 2035 Bus 5 EP002
2A3S Siemens 125 MLO 1 Rm. 2035 2A3 EP002
2B GE 125 MLO 1 Rm. 2014 Bus 5 EP002
2BS GE 125 MLO 1 Rm. 2014 2B EP002
2C GE 125 MLO 1 Rm. 2C Bus 6 EP002
2C2 Siemens 250 MLO 1 Next to Rm. 2051 Bus 6 EP002
2D1 GE 225 MLO 1 Rm. 2D Bus 1 EP002
2D2 ? 400 MLO 1 Rm. 2072 Bus 1 EP002
2D2A ? 100 MLO 1 Rm. 2072 2D2 EP002
2E GE 125 MLO 1 Rm. 2E Bus 7 EP002
2F GE 125 MLO 1 Rm. 2F Bus 8 EP002
2L1 ? 200 200A MB 2 Basement Bldg. 2 FDS EP005
2L2 ? 125 MLO 2 Rm. 1004 2L1 EP005
2X1 GE 225 MLO 1 Rm. 2014 SWBD 20-E EP002
2X2 GE 400 MLO 1 Rm. 2014 SWBD 20-E EP002
3A1 GE 125 MLO 1 Rm. 3A1 Bus 8 EP002
3A2 GE 125 MLO 1 Rm. 3A2 Bus 2 EP002
3A3 GE 125 MLO 1 Rm. 3034A Bus 6 EP002
3B GE 125 MLO 1 Next to Rm. 3011 Bus 6 EP002
3C GE 125 MLO 1 Rm. 3044 Bus 5 EP002
3D GE 125 MLO 1 Rm. 3063 Bus 1 EP002
3E GE 125 MLO 1 Rm. 3110A Bus 8 EP002
3F GE 125 MLO 1 Rm. 3142A Bus 7 EP002
3L1A ? 200 200A MB 3 Rm. 01 Bldg. 3A FDS EP005
3L1B ? 200 200A MB 3 Rm. 01A Bldg. 3B FDS EP005
3L2A ? 125 MLO 3 Top of stairway 3L1A EP005
3L2B ? 125 MLO 3 Top of stairway 3L1B EP005
4A1 GE 125 MLO 1 Rm. 4A1 Bus 7 EP002
4A2 GE 125 MLO 1 Rm. 4054B Bus 1 EP002
4A3 GE 125 MLO 1 Rm. 4031A Bus 5 EP002
4B GE 125 MLO 1 Rm. 4B Bus 5 EP002
4C GE 125 MLO 1 Rm. 4041 Bus 6 EP002
4E GE 125 MLO 1 Rm. 4072 Bus 7 EP002
4F GE 125 MLO 1 Rm. 4100 Bus 8 EP002
4L1A ? 200 200A MB 4 Rm. 01 Bldg. 4A FDS EP005
4L1B ? 200 200A MB 4 Rm. 01A Bldg. 4B FDS EP005
4L2A ? 125 MLO 4 Top of stairway 4L1A EP005
4L2B ? 125 MLO 4 Top of stairway 4L1B EP005
5A1 GE 125 MLO 1 Rm. 5A1 Bus 8 (4th Floor) EP002
5A2 GE 125 MLO 1 Rm. 5045 Bus 2 EP002
5A3 GE 125 MLO 1 Rm. 5010 Bus 6 (4th Floor) EP002
5L1 ? 200 200A MB 5 Rm. 05 Bldg. 5 FDS EP005
5L2 ? 225 MLO 5 Top of stairway 5L2 FDS EP005
5L2 FDS ? 100 100A Fuses 5 Rm. 05 Bldg. 5 FDS EP005
5L3 ? 225 MLO 5 Corr. 1013 5L3 FDS EP005
5L3 FDS ? 100 100A Fuses 5 Rm. 05 Bldg. 5 FDS EP005
6A2 GE 125 MLO 1 6th Floor Bus 2 (5th Floor) EP002
6-DP GE 400 400A MF 6 Rm. 03 Xfmr T3 EP005
6L1 ? 125 MLO 6 Rm. 1000A 6-DP EP005
6P1 GE 225 MLO 1 6th Floor Bus 1 (5th Floor) EP002
6P1 ? 225 MLO 6 Rm. 1000A 6-DP EP005
6P1A Sq. D 100 MLO 1 6th Floor 6P1 EP002
7A2 GE 125 MLO 1 7th Floor Bus 1 (5th Floor) EP002
7-ATS-1 ASCO 600 7 Rm. 105 Bldg. 7 FDS / Generator #2 EP005
7G Gould ITE 100 MLO 7 Rm. 105 SWBD 7-GDP-1 EP005
7L1 ? ? ? 7 Rm. G1 SWBD 7-GDP-1 EP005
7-MCC GE 100 MLO 7 Rm. G2 7P1 EP005
7P1 Gould ITE 400 400A MB 7 Rm. G1 Panel 7P1 FDS EP005
7P1 FDS ? 400 350A Fuses 7 Rm. 105 SWBD 7-GDP-1 EP005
7P2 GE 225 225A MB 7 Rm. G1 SWBD 7-GDP-1 EP005
8L2 ? 225 MLO 8 Rm. 1008 SWBD 8-MDP EP005
8L2A ? 225 MLO 8 Rm. 1007C SWBD 8-MDP EP005
8L2B ? 100 MLO 8 Rm. 1007A 8L2A EP005
8L2C ? 70 70A Brkr 8 Rm. 1007A 8L2A EP005
8LS ? 225 MLO 8 Next to Rm. 1007 SWBD 8-MDP EP005
ATS-1 Zenith 800 20 SWBD 20-D / SWBD 20-GDP EP003
ATS-2 GE Zenith 800 20 SWBD 20-D1 / SWBD 20-GDP EP003
ATS-3 Zenith 600 20 SWBD 20-E / SWBD 20-GDP EP003
ATS-4 Zenith 600 20 SWBD 20-E / SWBD 20-GDP EP003
BA2 GE 125 MLO 1 Basement SWBD 20-D1 EP002
BD1 GE 125 MLO 1 Basement SWBD 20-D1 EP002
BD2 GE 225 MLO 1 Basement SWBD 20-D1 EP002
BD3 GE 225 MLO 1 Basement SWBD 20-E EP002
Bldg. 18 Panel GE 225 MLO 240/120 18 Inside switchgear MV SWGR EP001
Bldg. 2 FDS ? 200 200A Fuses 2 Outside Xfmr T4 EP005
Bldg. 3A FDS ? 100 100A Fuses 3 Outside Xfmr T4 EP005
Bldg. 3B FDS ? 100 100A Fuses 3 Outside Xfmr T4 EP005
Bldg. 4A FDS ? 100 100A Fuses 4 Outside Xfmr T4 EP005
* All voltages 208/120 unless noted otherwise.
Equipment Name Mfr. Amps Main Breaker Voltage* Bldg. # Location Fed From Dwg. #
Bldg. 4B FDS ? 200 200A Fuses 4 Outside Xfmr T4 EP005
Bldg. 5 FDS ? 400 400A Fuses 5 Outside Xfmr T4 EP005
Bldg. 7 FDS ? 600 600A Fuses 7 Rm. 105 Xfmr T3 EP005
BSL Sq. D 225 225A MB 1 Basement SWBD 20-D EP002
C1E GE 125 MLO 1 Rm. 1A3 Bus 3 EP002
C1W GE 125 MLO 1 Rm. 1A1 Bus 3 EP002
C2E GE 125 MLO 1 Rm. 2035 Bus 3 EP002
C2W GE 125 MLO 1 Rm. 2A1 Bus 3 EP002
C3DP GE 400 MLO 1 Rm. 3A2 Bus 3 EP002
C3DP2 GE 125 MLO 1 3rd Floor C3DP EP002
C3E GE 125 MLO 1 Rm. 3034A C3DP EP002
C3E1 Siemens 250 MLO 1 Rm. 3110A C3DP EP002
C3-ICU Sq. D 225 MLO 1 Rm. 3022 C3DP EP002
C3N GE 225 MLO 1 Rm. 3063 C3DP EP002
C3W GE 125 MLO 1 Rm. 3A1 C3DP EP002
C4E GE 125 MLO 1 Rm. 4031A Bus 3 EP002
C4W GE 125 MLO 1 Rm. 4A1 Bus 3 EP002
C5E GE 125 MLO 1 Rm. 5010 Bus 3 EP002
C5W GE 125 MLO 1 Rm. 5A1 Bus 3 EP002
CGA GE 125 MLO 1 Ground Floor CGW EP002
CGE ITE 225 225A MB 1 Rm. 07T Bus 3 EP002
CGW GE 125 MLO 1 Rm. GA1 Bus 3 EP002
Chiller #1 Starter ? ? ? 1 Rm. 61 Xfmr T6 EP004
Chiller #2 Starter ? ? ? 1 Rm. 61 Xfmr T7 EP004
Cysto. X-Ray Breaker ? 150 150A/2P Brkr 1 Rm. 3085 Bus 4 EP002
E1D GE 225 MLO 1 Rm. 1D2 Bus 4 EP002
E2A Siemens 250 MLO 1 Rm. 2035 Bus 4 (1st Floor) EP002
E2B GE 225 MLO 1 Rm. 2014 Bus 3 EP002
E4A3 GE 125 MLO 1 Rm. 4054B Bus 4 EP002
E6A2 GE 225 MLO 1 6th Floor Bus 4 EP002
E7A1 GE 125 MLO 1 7th Floor E6A2 EP002
EBD1 GE 225 MLO 1 Basement SWBD 20-EDP EP002
EBD2 (P3) C-H 200 MLO 1 Basement SWBD 20-EDP EP002
EBD3 GE 400 400A MB 1 Basement SWBD 20-EDP EP002
Elevator #4 FDS ? 100 100A Fuses 1 Rm. 3078 Bus 4 EP002
Elevator #5 FDS ? 100 100A Fuses 1 Elev. #5 Mach. Rm. Bus 4 EP002
EMCC-1 GE 200 MLO 1 Basement SWBD 20-EDP EP002
EMCC-2 Sq. D 600 MLO 1 Rm. 61 SWBD 20-EDP EP002
EP Siemens 600 MLO 1 7th Floor Bus 4 (6th Floor) EP002
Fire Pump #1 DS ? 800 Switch 20 SWBD 20-GDP EP003
Fire Pump #2 Controller ? ? ? 1 Basement SWBD 20-D / SWBD 20-GDP EP002
Fire Pump #2 DS ? 800 Switch 20 SWBD 20-GDP EP003
G1 Sq. D 225 100A MB 1 Rm. 61 MCC-1 EP002
GA1 GE 125 MLO 1 Rm. GA1 Bus 7 (1st Floor) EP002
GA2 GE 125 MLO 1 Rm. 01D Bus 2 EP002
GA3 GE 125 MLO 1 Rm. 07T Bus 5 EP002
GC GE 125 MLO 1 Rm. 09B Bus 6 EP002
GD GE 225 MLO 1 Rm. GD Bus 1 EP002
GG GE 100 MLO 1 Ground Floor Bus 8 (1st Floor) EP002
GP1 GE 225 MLO 1 Ground Floor SWBD 20-D1 EP002
GP2 GE 225 MLO 1 Ground Floor GP1 EP002
H1B GE 400 400A MF 480/277 1 6th Floor MCC-2 EP002
H2B GE 225 MLO 480/277 1 Rm. 2014 H1B EP002
K1 GE 225 MLO 1 Rm. 1070 Bus 1 EP002
K2 GE 225 MLO 1 Rm. 1070 Bus 1 EP002
KA GE 225 200A MB 1 Closet in Rm. 1098 Bus 2 EP002
Kit. T/L Panel Sq. D 70 70A MB 1 Rm. 1097 Kit. T/L Panel DS EP002
Kit. T/L Panel DS ? ? ? 1 Kitchen Bus 4 EP002
LS1 Gould ITE 200 MLO 1 Rm. 1065A SWBD 20-LSDP EP002
LS2 Gould ITE 200 MLO 1 Rm. 2065 SWBD 20-LSDP EP002
LS2B Eaton 100 60A MB 1 Elev. #5 Mach. Rm. LS2 EP002
LS3 Gould ITE 200 MLO 1 Rm. 3055 SWBD 20-LSDP EP002
LS3A GE 225 MLO 1 Rm. 3063 LS3 EP002
LS4 Gould ITE 100 MLO 1 Rm. 4052 SWBD 20-LSDP EP002
LS5 Gould ITE 100 MLO 1 Rm. 5A2 SWBD 20-LSDP EP002
LS7 Eaton 100 60A MB 1 7th Floor (Elev. Mach. Rm.) LS5 EP002
LSG Gould ITE 200 MLO 1 Rm. 18 SWBD 20-LSDP EP002
MCC-1 Sq. D 600 MLO 480/277 1 Rm. 61 SUB-C EP002
MCC-2 GE 1200 1200A MF 480/277 1 6th Floor SUB-C EP002
MCC-3 GE 400 MLO 1 Basement SWBD 20-E EP002
MV SWGR GE 1200 1200A MB (2) 13.8KV 18 Utility EP001
MV SWITCH Sq. D 1200 13.8KV Near Utility Poles Utility EP001
PANEL A GE 100 MLO 1 Rm. 3076 PANEL A FDS EP002
PANEL A FDS ? 45 45A Fuses 1 Rm. 3076 S1 EP002
Pavilion Panel ? 100 MLO 25 Pavilion GA1 EP002
PL GE 225 MLO 1 Pharmacy (Corr. GB) SWBD 20-D EP002
PL1 GE 225 MLO 1 Pharmacy (Corr. GB) Bus 5 EP002
S1 GE 400 MLO 480/277 1 Rm. 3076 1-ATS-5 EP002
S3 GE 600 MLO 1 Rm. 3076 SWBD 20-GDP EP002
Smoke Shelter Panel Sq. D 100 MLO 24 Smoke Shelter BD3 EP002
SUB-C Sq. D 3000 3000A MB 480/277 1 Rm. 61 Xfmr T9 EP002
SWBD 20-D Gould ITE 1600 MLO 20 SWGR 20-SB EP003
SWBD 20-D1 Gould ITE 1600 MLO 20 SWGR 20-SB EP003
SWBD 20-E Gould ITE 1600 MLO 20 SWGR 20-SB1 EP003
SWBD 20-EDP Gould ITE 1200 MLO 20 ATS-4 EP003
SWBD 20-GDP Gould ITE 1600 MLO 20 Generator #1 EP003
SWBD 20-LSDP Gould ITE 1200 MLO 20 ATS-3 EP003
SWBD 7-GDP-1 GE 600 MLO 7 7-ATS-1 EP005
SWBD 8-MDP ? 400 MLO 8 Rm. 1007C Xfmr T3 EP005
SWGR 20-SB Gould ITE 1600 1600A MB (2) 20 Xfmr T1 / Xfmr T2 EP003
SWGR 20-SB1 GE 1600 1600A MB 20 Xfmr T8 EP003
Telephone Panel GE 125 MLO 1 Ground Floor Bus 3 (1st Floor) EP002
* All voltages 208/120 unless noted otherwise.
| GI001 |
| ES101 |
| EP001 |
| EP002 |
| EP003 |
| EP004 |
| EP005 |
| RE001 |
File details come from the government source that posted it. Updated .