Section F.3 Deliverables (REV)
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F.3 Deliverables (REV)
F.3 Deliverables
(a) All applicable TO deliverables, their required delivery dates, destination of delivery, and schedule for completion of work to be performed will be specified within individual TOs issued under this contract, as applicable.
(b) For purposes of delivery, all deliverables shall be made by close of business
(COB) 4:30 P.M. local time (Washington, DC) at destination, Monday through
Friday, unless stated otherwise in the individual TO.
(c) All deliverables submitted in electronic format shall be free of any known computer virus or defects. If a virus or defect is found, the initial deliverable will not be accepted. The replacement file shall be provided within two (2) business days after notification of the presence of a virus.
(d) Each deliverable shall be accompanied by a cover letter from the Contractor on
Company letterhead. Multiple deliverables may be delivered with a single cover letter describing the contents of the complete package.
(e) In the event the Contractor anticipates difficulty in complying with any contract-level delivery schedule, the Contractor shall immediately provide written notice to the
IGSS CO and COR. For any Task Order level deliverable, the Contractor shall provide written notification immediately to the TO CO and TO COR. Each notification shall give pertinent details, including the date by which the Contractor expects to make delivery; provided that this data shall be informational only in character and that receipt thereof shall not be construed as a waiver by the Government of any contract delivery schedule, or any rights or remedies provided by law or under this contract.
(f) In the event that a Contractor is non-compliant in submission of deliverables, the Government will reflect the non-compliance in the Contractor’s past performance report.
(g) The following table provides a summary of the IGSS reporting requirements that may be required during the contract period of performance. This summary is not all inclusive and defined deliverables will be established within individual TOs.
The Contractor shall support FSA Integrated Governance Support objectives by providing deliverables to be defined within individual Task Orders (TO) that include but are not limited to the following and will be procured on an as needed basis:
DELIVERABLE BRIEF
DESCRIPTION
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
PRE-SELECT
Strategic Gap Analysis An analysis of the gaps between Strategic Plan
Goals and the current investment portfolio.
Quarterly C.3.1 Word, PowerPoint
Pre-Select Plan A plan to execute the Pre-
Select Phase for a specific fiscal year.
Annually C.3.1 Word
Strategic Initiative
Business Cases
Provides details on budget and cost estimate, milestones, alternatives analysis, contracts, performance metrics, and service components regarding a strategic gap between the Strategic Plan and tactical plans.
3 times annually C.3.1 Word, PowerPoint, Project Server, SharePoint
Alternatives Analysis Assess various options for meeting the performance objectives of an investment, including the return on investment of the various options.
3 times annually C.3.1 Word, PowerPoint, Excel
Alternatives Analysis
Reviews
Reviews of Alternative
Analysis performed by others.
4 times annually C.3.1 Word
ARCHITECTURE PLANNING
Enterprise Current State
Architecture
Enterprise Summary of
Current State Business
Capabilities, Systems, Applications, Information, and Infrastructure.
Twice
C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Investment Architecture Investment Summary of
Current State Performance, Business, Application, Infrastructure, Data, and
Security Architectures.
5 investments annually C.3.2 EA Repository, SharePoint, Visio
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Current State
Assessment, Gap
Analysis, and
Recommendations
Assessment of Current
State Architecture. Gap
Analysis is based upon comparing the Current
State to the Target State.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current FEA Reference
Model Mapping
Alignment of FEA
Reference Models to FSA.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Performance
Architecture
Describes how investments support strategic goals and objectives.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Business
Architecture
Includes Business
Capabilities and Business
Processes (e.g. BPMN diagrams and associated descriptions). ).
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Business Context Illustrates the systems that
FSA business entities and stakeholders use to carry out business functions through the Aid Life Cycle.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Application
Architecture
Describes systems and system components associated with investments. Describes interfaces and information flows between systems.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Infrastructure
Architecture
Describes infrastructure components (e.g. HW, SW) associated with systems.
Build infrastructure diagrams like the ASI
Application / Infrastructure
Diagrams.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Data
Architecture
Describes data components associated with systems.
Conceptual, logical, physical data models.
Describe relationship to
Application and
Infrastructure layers.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Security
Architecture
Describes security controls for systems associated with investments.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Current Architecture
Executive Summary
Summary of Current State
Architecture deliverable.
5 investments annually C.3.2 PowerPoint
Target State Vision Represents FSA shared understanding regarding where the entire enterprise is going over the next 5-7 years.
Twice C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Architecture Summary of Target State
Performance, Business, Application, Infrastructure, Data, and Security
Architectures.
5 investments annually C.3.2 EA Repository, FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Target Performance
Architecture
Describes how investments support strategic goals and objectives.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Business
Architecture
Includes Business
Capabilities, Business
Processes (e.g. BPMN diagrams and associated descriptions), and business context diagrams and descriptions.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Application
Architecture
Describes systems and system components associated with investments. Describes interfaces and information flows between systems.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Infrastructure
Architecture
Describes infrastructure components (e.g. HW, SW) associated with systems.
Build infrastructure diagrams like the ASI
Application / Infrastructure
Diagrams.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Data Architecture Describes data components associated with systems.
Conceptual, logical, physical data models.
Describe relationship to
Application and
Infrastructure layers.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Target Security
Architecture
Describes security controls for systems associated with investments.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Enterprise Roadmap Describes how to transition from the current to the target focused on
Performance, Business, and
Systems.
5 investments annually C.3.2 EA Repository, Word, Excel, SharePoint, Visio
Market Research &
Product Evaluation
Report
Describes market research results, the impact assessment on the current environment, business and technical requirements, pros and cons, technical and cost research, and recommendations.
4 times annually C.3.2 Word
DATA ARCHITECTURE PLANNING
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Data Integrity
Framework and
Implementation Plan
A plan for implementation of a standard enterprise-level program that will ensure data integrity within
FSA production systems, including common reporting across each major data system. The plan shall identify and describe the framework and necessary processes, procedures, and tools that need to be in established, as well as the roadmap and implementation plan for standing up the data integrity program.
Annually C.3.3 Word
Data Modeling Standards and Guidelines
Defines standards methods, techniques, notation and tools for developing data models at the enterprise and project levels.
Annually C.3.3 Word
Data Standardization
Policies and Procedures
Describes how the creation and usage of data and metadata with be governed.
Annually C.3.3 Word
Database Administration and Data Engineering
Best Practices
Industry best practices regarding database administration and data engineering.
Annually C.3.3 Word
Enterprise Data
Management Concept of
Operations
Describes a vision for an
FSA Enterprise Data
Management Program that includes: EDM functional areas and their activities, EDM organization structure with roles and responsibilities, and EDM operational scenarios.
Once within PoP C.3.3 Word
Enterprise Data
Management Governance
Plan
Defines a governance framework for defining a consistent view of all business-driven data elements.
Annually C.3.3 Word
Enterprise Data
Management Policies
Defines enterprise-wide policies governing the creation and usage of data and metadata.
Annually C.3.3 Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Data Migration Plan
Template
Defines existing FSA data migration plan template.
The template identifies the processes associated with completion of the data migration effort; which includes conversion strategies, data mapping
(which are the detailed requirements), data clean up, and testing.
Once within PoP C.3.3 Word
Data Migration Plan
Exemplar
Modify existing FSA data migration plan examplar
The exemplar serves as an excellent example of a completed data migration plan.
Once within PoP C.3.3 Word
Data Migration Roadmap Defines data migration, what steps are involved, what common problems and risks FSA might encounter on a data migration project. Define a practical roadmap to assist with the management of data migration projects.
Once within PoP C.3.3 Word
SECURITY ARCHITECTURE PLANNING
Enterprise Security
Architecture Best
Practices
Identifies industry best practices regarding security architecture.
Annually C.3.4 Word
Enterprise Security
Architecture Concept of
Operations
Describes a vision for an
FSA Security Architecture that includes: Security
Architecture functional areas and activities, roles and responsibilities, and operational scenarios.
Twice within PoP C.3.4 Word, PowerPoint
Personal Identifiable
Information (PII)
Assessment Report
Identify all PII information in possession of FSA, location of the PII, method of protection, and ownership and management of the data.
Twice C.3.4 Word, PowerPoint
INTEGRATION SERVICES
Loans Segment Concept of Operations
Defines CONOPS for how investment management and enterprise architecture integrates. Includes processes and performance goals.
Annually C.3.5 Word
IT Strategic Plan Defines FSA's strategic technology goals & objectives in alignment with FSA's 5 year strategic plan.
Annually C.3.5 Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Program Office
Acquisition Documents
Pre-award acquisition materials on behalf of FSA
Business Units.
2 times annually C.3.5 Word
Acquisition Pre-Award and Post-Award
Technical and Cost
Reviews
A review of solication documents from Business
Units for technical and management merit.
8-12 times annually C.3.5 Word
Enterprise Strategic
Acquisition Plan
Defines macro-level recommendations to define the vision, operating model, roles, and processes for strategic acquisitions at
FSA, and tangible steps to help FSA achieve these goals. Define micro-level recommendations that focus on initial high priority projects.
As needed C.3.5 Word
FSA Policy Documents FSA Program Policy documents.
1 policy document annually
C.3.5 Word
Organization Change
Plan
Program or Portfolio
Change Management Plan for Programs such as
Servicing or Complaint
System.
Twice within PoP C.3.5 Word
Human Capital
Management Plan
Program or Portfolio
Human Capital
Management Plan for
Programs such as Servicing or Complaint System.
Twice within PoP C.3.5 Word
FSA Governance
Structure
A representation of all governance boards and how they relate, including process integration document to describe tactical flows.
Semi-Annually C.3.5 Word, PowerPoint, Visio, SharePoint
Loans Segment
Modernization Plan
Describes as-is mission, stakeholders, architecture & investments. Explains segment capabilities, strengths, opportunities, risks involved and the potential gaps. Defines to-be architecture, goals, objectives and proposed investments. Explains steps to transition from as-is to to-be.
Annually C.3.5 Word
STRATEGIC PLANNING
FSA Strategic Plan FSA's statement of strategic direction.
Annually C.3.6 Word and PDF
FSA Strategic Plan
Comment Matrix
A matrix of FSA comments and how they were dispositioned.
Annually C.3.6 Word
SELECT, CONTROL, AND EVALUATE
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Business Case Analysis
Report by Business Case
Support Investment
Managers/Project Managers in the preparation and maintenance of Major and
Non-major IT investment business cases (OMB
Exhibit 300)
20-25 per year C.4.1 Word, PowerPoint, eCPIC
Business Case Analysis
Report By Business Case
Section Across
Enterprise
Support Investment
Management in preparation in analysis of business cases.
Annually C.4.1 Word, PowerPoint, eCPIC, Project
Server, SharePoint
Prioritized Investment
Portfolio
FSA's Investment Priority
List (IPL) at select and throughout the fiscal year with changes.
4-6 per year C.4.1 SharePoint, Project
Server, Excel
Investment Portfolio
Report
Quarterly Integrated Data
Collection (IDC), Investment Review Board reporting on the portfolio.
Quarterly C.4.1 Word, SharePoint, Project Server, Excel, eCPIC
FSA Investment
Requests (IRs) Review
Enterprise Reports
Support Investment
Managers/Project Managers in the preparation and maintenance of Investment
Requests.
Annually, 50-70 IRs C.4.1 SharePoint, Project
Server, Excel
FSA Investment
Requests (IRs) Review
Technology Reports
Support Investment
Managers/Project Managers in the preparation and maintenance of Technology
Office Investment
Requests.
Annually, 20-30 IRs C.4.1 SharePoint, Project
Server, Excel
Baseline Change
Requests (BCRs)
Change requests for scope, schedule, and cost within
FSA's process and the
ED/OMB process.
100 BCRs Annually C.4.1 Word, Project
Server, SharePoint
Training materials for
PMs on yearly process requirements.
Training to institutionalize a standard enterprise-wide project management vocabulary as well as standard tools, methods and processes for managing projects throughout FSA.
Annually C.4.1 PowerPoint
Management Stage Gate
Review Reports
Management and Technical
Risk Assessments.
1-3 reports in support of
12-15 IRB meetings
C.4.1 PowerPoint
Enterprise Sequencing
Plan and associated change log
Graphically depictions all
Recompete and/or Projects across the enterprise that meet the approved criteria of Tier 1 Investments / Tier
1 Operations. Capture detailed records of all changes to the Enterprise
Sequencing Plan.
Monthly C.4.1 Visio, Project
Server, SharePoint, Excel
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Operational Analysis The ongoing performance of an operating asset investment and measuring that performance against an established set of cost, schedule, and performance goals.
4 per year C.4.1 Word
Operational Analyses
Reviews
Reviews of Operational
Analysis Reviews performed by others.
15 per year C.4.1 Word
Program Assessment
Tracking Report
Tracking completion and status of major IT business case program assessments in a single report.
1 time annually C.4.1 Word
Post-Implementation
Reviews
Evaluation of how successfully the investment or project objectives were met and how effective the project management practices were in keeping the investment or project on track.
4 per year C.4.1 Word
Reviews of Post-
Implementation Reviews
Reviews of Post-
Implementation Reviews performed by others.
15 per year C.4.1 Word
ARCHITECTURE EXECUTION
Enterprise Architecture
Views, Models, and
Reports
EA repository views to inform governance boards and ad hoc requests.
20 times Annually C.4.2 SharePoint, Access, Excel, EA
Repository, Visio, Word
Technology Standards and Products Guide
(TSPG)
Classification of standard technologies employed by
FSA.
2 times Annually C.4.2 Word
External Mandate Impact
Assessments and
Recommendations
Describes impact and make recommendations regarding new Federal mandates such as the Cloud First Policy and FEA v2.
4 times Annually C.4.2 Word
ENTERPRISE DATA MANAGEMENT
Enterprise Data
Modeling Tool
FSA's enterprise data modeling tool.
As needed C.4.3 Embarcadero
Enterprise Conceptual
Data Model
Reflects standard data entities and their relationships across the enterprise
Annually C.4.3 Embarcadero, Word
Enterprise Logical Data
Model
A fully attributed
Enterprise Logical Data
Model (ELDM) that expands upon the entities and relationships from the
ECDM.
Annually C.4.3 Embarcadero, Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Enterprise Data
Dictionary Standards
Defines the framework necessary to maximize data sharing and exchange opportunities and to enable standardized data modeling throughout Federal Student
Aid. Defines the standards, processes, and procedures needed to maintain the
EDD at Federal Student
Aid.
Annually C.4.3 Word
Enterprise Data
Dictionary
FSA's enterprise data dictionary.
Annually C.4.3 IBM Information
Server Suite, Word
Metadata Management tool
FSA’s metadata management tool.
As needed C.4.3 IBM Information
Server Suite, Word
Enterprise Data Quality
Scorecard
Defines and documents mission-critical data attributes and associated metrics that measure data quality for different uses.
Define the target metric levels that achieve the quality goals. Define the data quality goals.
Annually C.4.3 Word
Enterprise Data Quality
Mad Dog Report
Highlights the high priority data quality issues facing
FSA data owners.
Annually C.4.3 Word
Data Profiling Report The current state of data quality and identify data quality challenges.
Annually C.4.3 IBM Information
Server Suite, Word
ENTERPRISE GOVERNANCE
Pre-Select Process
Guide and Diagrams
A description of how the
Pre-Select process happens, step by step with supporting diagrams.
Annually C.4.4 Word, Visio
Pre-Select Standard
Operating Procedures
Definition of prescribed methods to be followed routinely for the Pre-Select
Process.
Annually C.4.4 Word
Pre-Select Training
Modules
Training to institutionalize a standard pre-select vocabulary as well as standard tools, methods and processes.
Annually C.4.4 WebEx, Camtasia, PowerPoint (or other requested medium compatible with the ED environment).
Portfolio Management
Process Guide and
Diagrams
A description of how the
Portfolio Management process happens, step by step with supporting diagrams.
Annually C.4.4 Word, Visio
Portfolio Management
Standard Operating
Procedures
Definition of prescribed methods to be followed routinely for the Portfolio
Management Process.
Annually C.4.4 Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Portfolio Management
Training Modules
Training to institutionalize a standard portfolio management vocabulary as well as standard tools, methods and processes.
Annually C.4.4 WebEx, Camtasia, PowerPoint (or other requested medium compatible with the ED environment).
Investment Management
Process Guide and
Diagrams
A description of how the
Investment Management process happens, step by step with supporting diagrams.
Annually C.4.4 Word, Visio
Investment Management
Standard Operating
Procedures
Definition of prescribed methods to be followed routinely for the Investment
Management Process.
Annually C.4.4 Word
Investment Management
Training Modules
Training to institutionalize a standard investment management vocabulary as well as standard tools, methods and processes.
Annually C.4.4 WebEx, Camtasia, PowerPoint (or other requested medium compatible with the ED environment).
IRB pre-meeting materials
IRB preliminary agenda, final agenda, logistical support, and supporting materials
Quarterly C.4.4 Outlook, Word, PowerPoint, SharePoint
IRB post-meeting materials
IRB action items, meeting minutes, and decision memoranda.
Quarterly C.4.4 Outlook, Word, PowerPoint, SharePoint
IRB support team pre-meeting materials
IRB Support Team preliminary agenda, final agenda, logistical support, and supporting materials
Quarterly C.4.4 Outlook, Word, PowerPoint, SharePoint
IRB support team post-meeting materials
IRB Support Team action items, meeting minutes, and decision memoranda.
Quarterly C.4.4 Outlook, Word, PowerPoint, SharePoint
IMB pre-meeting materials
IMB preliminary agenda, final agenda, logistical support, and supporting materials
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
IMB post-meeting materials
IMB action items, meeting minutes, and decision memoranda.
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
Investment Portfolio
Review pre-meeting materials
Investment Portfolio
Review preliminary agenda, final agenda, logistical support, and supporting materials
Every two weeks C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
Investment Portfolio
Review post-meeting materials
Investment Portfolio
Review action items, meeting minutes, and decision memoranda.
Every two weeks C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
ERB pre-meeting materials
ERB preliminary agenda, final agenda, logistical support, and supporting materials
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
ERB post-meeting materials
ERB action items, meeting minutes, and decision memoranda.
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
AWG pre-meeting materials
AWG preliminary agenda, final agenda, logistical support, and supporting materials
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
AWG post-meeting materials
AWG action items, meeting minutes, and decision memoranda.
Monthly and ad hoc C.4.4 Outlook, Word, PowerPoint, SharePoint, Visio
Investment Review
Board (IRB) Charter
IRB purpose, authority, membership, and roles and responsibilities.
As needed C.4.4 Word
Investment Review
Board (IRB) Process
Description
A description of how the
Investment Review Board process happens, step by step.
As needed C.4.4 Word
Investment Management
Board (IMB) Charter
IMB purpose, authority, membership, and roles and responsibilities.
As needed C.4.4 Word
Investment Management
Board (IMB) Process
Description
A description of how the
Investment Management
Board process happens, step by step.
As needed C.4.4 Word
Engineering Review
Board (ERB) Charter
ERB purpose, authority, membership, and roles and responsibilities.
As needed C.4.4 Word
Engineering Review
Board (ERB) Process
Description
A description of how the
Engineering Review Board process happens, step by step.
As needed C.4.4 Word
Architecture Working
Group (AWG) Charter
AWG purpose, authority, membership, and roles and responsibilities.
As needed C.4.4 Word
Architecture Working
Group (AWG) Process
Description
A description of how the
Architecture Working
Group process happens, step by step.
As needed C.4.4 Word
PROGRAM MANAGEMENT
Kickoff Meeting Task order kickoff meetings.
Once per task order C.5 PowerPoint
Transition-In Report Report to ensure a smooth transition of services from the incumbent to the awardee.
Once C.5 Word
Transition-Out Report Report to ensure a smooth transition of services from the incumbent to FSA and the awardee.
Once C.5 Word
Meeting Minutes Meeting agenda, invitees, attendees, and results.
As needed C.5 Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Weekly Status Reports Weekly delivery of status reports that identify tasks completed during previous week, tasks planned for upcoming week, and project risks and their respective statuses.
Weekly C.5 Word
Monthly Status Reports Monthly delivery of status reports that identify completed and planned tasks and provide status toward completion for all task order deliverables.
Monthly C.5 Word
IMS The planned dates to start and complete tasks and milestones. Schedules should include work to be done by FSA as well as any
Contractors participating on the project.
Monthly C.5 Project, Project
Server
IMS Executive
Presentation
Integrated master schedule executive presentation.
Monthly C.5 PowerPoint
PgMP Defines how the program will be managed inclusive of all key process areas
(e.g. Quality, Risk, Human
Capital, etc.) and an overview of how projects are managed generally.
Two Months after award.
Annually updated.
C.5 Word, PowerPoint
PMP Defines how the project specifically will be managed that may differ from the program level plan
(e.g. Stakeholder Analysis).
Per Task Order C.5 Word, PowerPoint
Communication /
Marketing Strategy
Defines plan on how to increase awareness among stakeholders and provides messaging that educates stakeholders for IMG and
EA.
Six Months after award.
Annually updated.
C.5 Word, PowerPoint
Communication
Materials
Tactical communications vehicles such as presentation, tv screens, articles for internal publications, email campaigns, etc.
Monthly C.5 WebEx, Camtasia, PowerPoint (or other requested medium compatible with the ED environment).
Performance
Management Plan
Defines metrics for which performance will be measured for IMG and EA.
Six Months after award.
Annually updated.
C.5 Word
Performance
Management Reports
Reports on metrics defined within the Performance
Management Plan.
Monthly C.5 Word
Information requests, data calls, and audit materials
Reports in response to requests from the ED, FSA, OIG, GAO, etc.
20 per year C.5 Word
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Maturity Assessment Track maturity of the
Investment Management and Enterprise Architecture programs against industry standards maturity frameworks.
Six Months after award.
Annually updated.
C.5 Word
Websites Update internal and external sites to communicate program results to stakeholders.
Examples include FSA's current state site, target state site, and Investment
Management site.
7-10 sites updated quarterly.
C.5 SharePoint
EAE Program
Assessment
EAE processes use to manage the development, implementation and operation of Information
Technology investments.
Annually C.5 Word, Project
Server, SharePoint
EAE Operational
Analysis
The ongoing performance of an operating asset investment and measuring that performance against an established set of cost, schedule, and performance goals for the Enterprise
Architecture & Engineering
Investment.
Annually C.5 Word
EAE Post
Implementation Review
Evaluation of how successfully the EAE investment were met and how effective the project management practices were in keeping the investment or project on track.
Annually C.5 Word
EAE Major IT Business
Case
Provides details on budget and cost estimate, milestones, alternatives analysis, contracts, performance metrics, and service components regarding the EAE business case.
Annually C.5 eCPIC
EAE Investment
Requests
Proposed EAE business cases that provides justification, scope, risk, impact, and cost estimates.
2 IRs annually C.5 Word, Project
Server, SharePoint, Excel
TECHNICAL ARCHITECTURE
Request for
Information
Request from vendors when you think you know what you want but need more information from the vendors.
As needed C.6.1 Word, Excel, Visio, PowerPoint
Statement of Work /
Statement of Objectives
Identifies the objectives to be met by the acquisition by describing and setting forth the scope of work to be performed.
As needed C.6.1 Word, Excel, Visio, PowerPoint
FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Independent
Government Cost
Estimate
An agency’s estimate of the resources and the associate cost of these resources that a prudent business will incur in the performance of a contract.
As needed C.6.1 Word, Excel, Visio, PowerPoint
Proposal Evaluation
Report.
An assessment with advice to the technical evaluation panel regarding a vendor’s proposed technical solution. Includes strengths, weaknesses, risks and deficiencies as identified from the requirements and evaluation criteria of the acquisition.
As needed C.6.1 Word, Excel, Visio, PowerPoint
Request for Equitable
Adjustment Report
An assessment for the reasonability of a request for Equitable Adjustment included pricing.
As needed C.6.1 Word, Excel, Visio, PowerPoint
Change Request Cost
Review Report
A reasonable determination of both the level of effort and costs for specific change request including a risk analysis to determine the relative risk of alternative solutions
As needed C.6.1 Word, Excel, Visio, PowerPoint
Goals, Objectives, Qualities, and
Validation Scenarios
Document
Provides guidance on goals, objectives, qualities and validation scenarios to support FSA application system procurements.
Annually, or as needed C.6.2 Word, Excel, Visio, PowerPoint
Design Assessment
Report
Provides an independent assessment of the quality of the preliminary design or detailed design being delivered by the solution provider Contractor.
Provide the solution provider with recommendations on capturing and communicating their design using FSA’s design document standards
As needed C.6.2 Word, Excel, FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Design Review Report A report that captures results of informal and formal reviews of solution provider design deliverables. Includes feedback and guidance on using FSA’s design documentation standards.
Includes a critical assessment of the solution design within the guidance of the project’s requirements, As needed C.6.2 Word, Excel, Visio, PowerPoint
Stage Gate Review
Report
A report of a solution providers design as defined in the FSA
Technical Quality Control
(TQC) process.
20 per year , or as needed C.6.2 Word, Excel, Visio, PowerPoint
Preliminary Design
Template
A template to capture and convey the significant architectural decisions that have been made on the system in the early stages, allowing the high-level design to be effectively evaluated before proceeding to the detailed design stage.
Annually, or as needed C.6.3 Word, Excel, Visio, PowerPoint
Preliminary Design
Exemplar
An example preliminary design document that follows the structure and guidance defined within the preliminary design template.
Annually, or as needed C.6.3 Word, Excel, Visio, PowerPoint
Detailed Design
Template
A template to capture and convey the detail necessary to allow coders to develop the system, and to support critical design reviews before beginning development..
Annually, or as needed C.6.3 Word, Excel, Visio, PowerPoint
Detailed Design
Exemplar
An example detailed design document that follows the structure and guidance defined within the detailed design template.
Annually, or as needed C.6.3 Word, Excel, Visio, PowerPoint
Design Stage Gate
Evaluation Process
Standards
Technical Quality Control
(TQC) and Design Stage
Grate processes that use
FSA’s Goals, Objectives, Qualities, and Validation
Scenarios Document.
Annually, or as needed C.6.3 Word, Excel, FREQUENCY
AS DESCRIBED IN
THE TO
REF MEDIA
TYPE
Acquisition Market
Research Report
Defines acquisition level requirements and input to express FSA’s opinion, requirement or technical constraint on selected technical topics.
As needed C.6.4 Word, Excel, Visio, PowerPoint
Statement of Work /
Statement of Objectives
Defines the objectives to be met by an acquisition by describing and setting forth the scope of work to be performed including but not limited to technical requirement and evaluation factors
As needed C.6.4 Word, Excel, Visio, PowerPoint
Product Evaluation and
Selection Report
A report to the technical evaluation team as input to the final selection of a technology.
As needed C.6.4 Word, Excel, Visio, PowerPoint
Technical Architecture
Process Description
A process description defines a series of steps followed in a regular definite order used for accomplishing a repetitive task or an end goal.
As needed C.6.5 Word, Excel, Visio, PowerPoint
Technical Architecture
Process Improvements
Assessments
An assessment that focuses on the process metrics being used to measure the effectiveness of a process. Identifies sources contributing to issues being encountered and defines specific improvement recommendations.
As needed C.6.5 Word, Excel, Table 1: Deliverables
F. 4 Task Order Status Reports
IGSS requires TO Status Reports for all TOs. The type of status report may vary by the type of TO issued. The status report recipients, content, and due dates will be identified in individual Task Orders. The TO Status Report shall contain data at the Task Order level unless a lower Work Breakdown Structure (WBS) level of reporting is explicitly required and stated in the Task Order.
(End of Section F)