SF-30_EA18RQ-00352_Amendment_0001.doc
DOC document 87 KB Posted
- Attached to
- BUOY HULLS
- Solicitation number
- EA18RQ-00352
About this file
RESPONSES TO QUESTIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30_EA18RQ-00352_Amendment_0001.doc | DOC document | |
| D030051.pdf | ||
| Past_Performance.docx | DOCX document | |
| DART_II_Hull_Specification.pdf | ||
| NDBC-8117.pdf | ||
| Past_Performance.docx | DOCX document | |
| DART_II_Hull_Drawings.pdf | ||
| RFQ_Combined_Synopsis_Solicitation.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF30 Continuation of Block Narrative
| Page |
| 2 |
| of |
| 2 |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| 0001 |
| 01/30/2017 |
| NWWG2200-18-00352 |
| 6. Issued By |
| Code AJ930073 |
| 7. Administered By (If other than Item 6) |
| Code SEE BLOCK 6 |
| NOAA/EASTERN REGION ACQUISITION |
| 200 GRANBY STREET |
| SUITE 815 |
| NORFOLK, VA 23510 |
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| EA18RQ-00352 |
9B. Date (See Item 11)
01/30/2018
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is restated as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as restated, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
| C. This supplemental agreement is entered into pursuant to authority of: |
| D. Other (Specify type of modification and authority) |
| E. IMPORTANT: Contractor |
| is not, |
| is required to sign this document and return copies to the issuing office. |
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NOAA, National Data Buoy Center (NDBC)
Stennis Space Center, MS See the attached Continuation Sheet for a Complete Description of Changes
1) Solicitation Amendment 0001 is issued to provide answers to Questions received as a result of Request for Quotation (RFQ) EA18RQ-00352.
Vendor Question 1: Are 3D files available for this Buoy? Solidworks part file or assembly file? STP files maybe?
Government Answer to Vendor Question 1: We can make available what we have at the time of award. It was modeled in AutoCAD Inventor. The drawings should be considered the higher authority (over the models) with regards to building the hulls. It is possible that there are some minor differences between the drawings (and accompanying documentation) and the models especially with respect to the fiberglass hull and the construction techniques.Vendor
2) Except for the changes made herein all other terms, conditions and provisions of the solicitation remain unchanged and in full force and effect.
END AMENDMENT 0001 TO EA18RQ-00352
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it.